.
.
Ajit Prasad Das
Electrical Engineer
Address Chinsurah, India 712101
Mob.
972*******(Whatsapp)/969*******
E-mail *******.***@*****.***
Seeking senior level assignments in Maintenance/Installation, Commissioning and Calibration with a comprehensive knowledge of developing and maintaining electrical systems and components to required specifications, focusing on economy, safety, reliability, quality and sustainability in professional and challenging environmental by utilising my creative and technical skill. PROFESSIONAL SYNOPSIS: A dynamic professional with 13th years of rich experience in Maintenance, Installation, Commissioning and Calibrating. Presently associated with Supreme Geotech Pvt Ltd, Talchinan, Hooghly, West Bengal, as an Electrical Engineer in Non-Woven Division. Excellent communication and interpersonal skill with strong analytical, team building, problem solving and organisational abilities.
Skills
Training Undertaken : One month course in PLC from C.T.T.C,Bhubaneswar, Odisha. Cooperative, dynamic in nature and curiosity to learn about new things.Having a comprehensive understanding of electrical health and safety regulation. Operating System : DOS, Windows98/NT/XP/2000
Application : MS Office, Excel
Work History
Nov 2018 -
Current
Electrical Engineer
Supreme Geotech Pvt. Ltd. West Bengal, Chinsurah, West Bengal. Nature of work -
Familiar with installation and calibration A.C. Drives( makes – Siemens, Allen Bradley, L/T, Emotron, ABB, Danfoss, etc. ).
Familiar with all types of industrial automation equipments such as Directional control valves, Solenoid valves, actuators,RTD Sensors, Thermocouples, Temperature Controllers, Belt Sway Switch, Zero Speed Switch,Vibration Sensors,Limit switches, Proximity switches, Photo-electric sensors, etc.
Responsible for constant power delivery to plant from power ( from Electrical Substation) and DG Set.
Maintain minimum spare in department for emergency breakdowns.
Improvement of Power Factor.
.
.
To manage the maintenance of plant and equipments in order to improve plant performance and reliability through management.
Troubleshooting of PLC ( only hardware side ).
Scheduled and undertook periodic maintenance on all electrical installations, components and equipment.
Inspected equipment every week to maintain working order.
Developed preventive maintenance schedules to minimize downtime and optimize performance.
PROJECT UNDERTAKEN( Dec.2018 To March2019 ) :
Installation,Erection and Commissioning of Jiangsu Ying Yang carpet line.
Installation,Erection and Commissioning of Stenter line and Vellore line.
Installation and Commissioning of Thermopack Electrical Panel.
Commissioning of 800KVA Transformer and 500KVA D.G. set.
Installation and Commissioning of all L.T. panels and AFC Panel( 300kvar).
Entire Lightining work is also handled for the plant.
Manullay operated Fire Hydrant Line .
Commissioning work of two air compressor of 22KW each . PROJECT UNDERTAKEN( Nov.2023 To March2024 ) :
Work handled for the installation and commissioning of Hitech carpet line.
Entire lighting work for the new shed.
Aug 2015 -
Oct 2018
Electrical Engineer
Flexituff International Ltd. Kashipur,Uttarakhand, Kashipur, Uttarakhand.
Performed maintenance procedures and repairs on existing electrical products and systems.
Proposed electrical product and system modifications to improve quality and efficiency.
Evaluated electrical installations and systems to isolate faults and implement corrective actions.
Maintain ISO Documentation work.
Ensuring 3S in our Electrical Department and mentored junior engineers.
Calibrated and repaired existing systems to maintain functionality.
Identified specific cables, fuses and circuit breakers required for assigned installations.
PROJECT UNDERTAKEN:
Commissioning of Jiangsu Ying Yang carpet line.
Complete shifting work of one carpet production line was handled to other location.
Jun 2012 -
Aug 2015
Electrical Engineer
Ganesha Ecosphere Limited, Uttar Pradesh, Rudrapur, Uttar Pradesh.
Proposed electrical product and system modifications to improve quality and efficiency.
Performed maintenance procedures and repairs on existing electrical products and systems.
Leadership and manpower management. Ability to analysis the complex situations and problem solving skills.
.
.
PROJECT WORK HANDLED UNDER THE GUIDANCE OF PROJECT ENGINEER: Installation,erection and commissioning work of 01 Megawatts washing line.
Installation and commissioning of MCC Panel and PDP Panel.
Cable laying and termination work.
complete lighting work for the shed.
Semi - automation work handled for Fire Hydrant Line ( consist of 85 HP Engine, 75HP Main motor and 12.5HP Jocky motor.)
Jun 2011 -
Jun 2012
Trainee Engineer
Ganesha Ecosphere Limited
Jun 2010 -
Dec 2010
Trainee Engineer
R.S.T. PVT LTD. Sahibabad, Uttar Pradesh, Sahibabad Education
Mar 2001 Matriculation: CBSE Board
G.S.R.E.M School - Bhubaneswar, Odisha.
Mar 2003 Higher Secondary of Education: PCM
N.A.C. Steel-Township, Rourkela, Odisha
Mar 2004 -
Mar 2008
B.P.U.T: B.TECH in Electrical And Electronics
C.E.B. College - Bhubaneswar, Odisha.
Languages
English, Hindi & Oriya.
Personal Details
Date of Birth : 3rd june1986
Gender : Male
Marital status : Married
Nationality : Indian
Residential Address : village - Mallia, post - Fatehpur, via - Mashra,Dist - Jajpur, Odisha. Declaration
I hereby declare that above mentioned information are correct upto my knowledge and I bear the responsibility for my correctness of the above mentioned particulars. Date :
Place :
Signature