Harishkumar Jagmohanbhai. Lad
Instrumention & control Engineer/ instrument foreman/supervisor
Total 27 years of experience in Maintenance/ Erection /Commissioning
Telephone No-+912*********, Mobile-+917*********, 972-***-****,
E-mail: **********@*****.***, ************@*****.***
Dynamic & result oriented Instrumentation &control Engineer /Senior instrument Foreman with hands on experience in overall management of the Plant commissioning & Maintenance Past served Doosan Heavy Industries &construction Co.as Instrumentation control Engineer,(Commissioning) offering broad based competencies in instrument engineer.
Excellent communicator & negotiator with exceptional analytical & problem solving skills.
Doosan systems India Pvt Ltd ( power project )
Employer : Doosan systems India Pvt Ltd
Period : From may 20l9 still
Position : Sr,Instrumentation control engineer
(construction/commissioning)
About the Job work in Plants
Erection and commissioning job work. Work Coal fire Boiler,GE Steam Turbines 2 660 mw power
generation unit Erection and commissioning job work.
PROFESSIONAL EXPERIENCE
Employer : Doosan Heavy Industries & Construction Co. (power plant project, Vietnam)
Period : December -2016 to Feb-2018
Position : Instrument & control Engineer,(commissioning)
About the Job work in Plants
Doosan is the EPC contractor of vinh than 4, Vietnam, VT-4 (2 x 600 mw CFPP) thermal power plant Project” having power plant of Capacity 1200 MW. The coal fire Boiler with FDG (unit flue-gas desulfurizer)Boiler capacity with full load steam flow 1700 ton/h,coal flow 320 ton/h (24 coal burner)
- Doosan Heavy Industries & Construction Co (CFPP power plant project-Vietnam )
Employer : Doosan Heavy Industries & Construction Co. (power plant project, Vietnam)
Period : July-2014 to May 2015
Position : Instrument & control Engineer,( Commissioning)
About the Plants
Doosan is the EPC contractor of AES-VCM (American energy system), Vietnam, Mong duong II (2 x 600 mw CFPP) thermal power plant Project” having power plant of Capacity 1200 MW.
The power plant consist 0f 2 power block and each block consist 0f Doosan power turbine and capacity 600 mw, coal fire Boiler with FDG (unit flue-gas desulfurizer)
- Doosan Heavy Industries & Construction Co (CCPP power plant project-Dubai)
Employer : Doosan Heavy Industries & Construction Co.
Period : September 2008 to august 2013
Position : Instrument & control Engineer,( Commissioning)
About the Plants
Doosan is the EPC contractor of DEWA’s Jebel Ali M, Project having power and desalination plant of Capacity (2000 MW and 140 MIGD,CCPP)
The power plant consist of 3 power blocks and each block consist of 2 Siemens Gas Turbines (STG5 – 4000F) of capacity 234.1 MW, 2 HRSG of capacity - HP: 427.0 T/Hr @ 556.8 C & 103 bara and LP: 36.2 T/Hr @ 166.1 C & 3.4 bare and one Alstorm Steam Turbine (HDC200/2AS-NE33AU) of capacity 217.83 MW.
- Denial instrumentation limited (construction project oil gas refinery)
Employer : Denial instrumentation limited (ISO 9002 Certified)
Period : From Jan 2008 to Aug2008
Position : Instrument supervisor (construction/commissioning)
About the Job work in Plants
Erection and commissioning job work. Work AEC Coal fire Boiler capacity 21000 kg/h, Alstom Steam
Turbine 20 mw power generation unit Erection and commissioning job work. calibration and installation work,
line check,loop check plant commissioning,cold function test,hot function test and plant o & m work
- K.N.P.C Refinery mina al ahmdi Kuwait (Maintenance project)
Employer : Al bahar jacrossi (ISO 9000 Certified)
Period : From Aug 2002 to Nov 2008
Position : Instrument foreman
About the Job work in Plants
Maintenance and Trouble shooting for continue process plant like Atmosphere Residue Desulfering unit (ARD), Crude Distillation unit (CDU), Product blending control (PBCR).Continue Catalytic Reformer unit (CCR) Eructation, Commissioning and Maintenance and Trouble shooting.
- K.O.C Kuwait Oil Company (Maintenance project)
Employer : Khalifa al dubbos&bros.co
(ISO 9002 Certified)
Period : From Dec 1997 to Sep 2001
Position : Instrument Technician
About the Job work in Plants
Maintenance and Trouble shooting for continue process like Crude Gathering Center and Crude Distillation, Crude Transit condensate compressing unit.
- Essar steel Ltd Hazira Surat Gujarat (Maintenance project)
Employer : Hofincons ltd (ISO 9000 Certified)
Period : Dec 1996 to Dec 1997
Position : Instrument Technician
About the Job work in Plants
Maintenance and Trouble shooting for continue process like Oxygen, Argon, and Hydrogen plant.
- ONGC Offshore Bombay high India (Maintenance project)
Employer : S. S construction
Position : Instrument Technician
Period : Oct 1995 to dec1996
About the Job work in Plants
Maintenance and Trouble shooting for continue process like Crude Gathering Center platform, Natural gas processing platform, power generation Gas turbine (40 mw) and Unman Crude well platform Crude Distillation, Crude Transit, gas compressing unit.
ONGC oil natural gas corporation limited Hazira, Surat Gujarat (Maintenance project)
Employer : Ani instrumentation & International engineering & marine
Work limited
Position : Instrument Technician
Period : Mar 1993 to Sep 1995
About the Job work in Plants
Maintenance and Trouble shooting for continue process like, Co-generation plant, utility HRSG (heat recovery steam generation) Gas Boiler capacity - HP: 220.0 T/Hr, AICE Gas Boiler, Gas turbine power generation (40 mw), water distillation, air compressing unit,Natural Storage tank,
- Cibatul Ltd Atul valsad Gujarat
Employer : Cibatul ltd atul valsad Gujarat
Position : Instrument Technician
Period : Mar 1992 to Feb. 1993
About the Job work in Plants
Maintenance and Trouble shooting for Comical plant, Bench process plant like, utility process
- Atul production ltd
Employer : A B Enginring Val sad
Position : Instrument Technician
Period : Aug 1990 to 1992
About the Job work in Plants
Erection and commissioning job work Cole fire Boiler, Steam turbine power generation unit.
EDUCATIONAL & PROFESSIONAL DEVELOPMENT
Diploma programmed in Electronics communication -International council for management
Studies, passing year Dec 2000.
Diploma Electronics servicing - Patel electronics institute passing year, Dec 1992
Nctvt in Instrumentation, -Govt of India in1993
I.T.I in Instrumentation, - Govt of India passing year july1990
PERSONAL DETAILS
Date of Birth: 22/12/1971
Nationality: Indian
Permanent Address At: Post: Degam, Parsi falia,
Tq: Chikhali, via: Bilimora,
Dist: navsari. Pin: 396530,
State: Gujarat, India.
Passport Details : K2066239
Place of issue Dubai.
Valid up to 25/12/2021.
Marital status : Married.
Language known : English, Hindi, Gujarati.
Work Experience knowledge
Total worked experience 27 years
Nature of Job & Major Assignments
Commissioning Instrumentation & control Engineer of the following unit,
Gas Turbine, Steam Turbine, HRSG Boiler,Coal fire boiler, FGD (flue gas desulfurized unit),coal fire boiler coal supplier system, coal fire boiler burner ignitions, coal fire boiler combustion Air system,coal fire boiler shut blower system, coal fire boiler ESP ( electrostatic precipitator unit, Electrical switch geared panel MV,LV AC/DC, Battery unit, Fuel Gas System, Fuel Oil System, Utility unit, Balance of plant (BOP) area
Gas turbine unit., Intake Air, air compressor system, GT Hydraulic Systems, Nox, Water Systems, Lube Oil / Lifting Oil Systems, Fin-fan coolers, Generator excitation systems,Transformer unit like step up step down 20kv to 420kv,icb system, fuel gas system fuel oil (DFO)system. gas metering system, GC Analysis system,
Steam Turbine unit, Lube Oil / Lifting Oil Systems, oil purification,steam gland system ST bypass system, LP Extraction, IP extraction system, closed cooling water system, HP main steam system HP/LP PRDS,HP/IP PRDS, HP start up by pass
HRSG Boiler HP,LP, Blowdown System, Duct burner system. Fuel gas skid, Feed water system, make up water system, DM water system, chemical dosing system, utility Air compressor system
Electrical switch geared panel MV,LV AC/DC, Battery unit,
Responsible for Co-ordination, senior Engineer for Instruments commissioning work,
Making commissioning function Test Procedure (I&C Comm side),
Conducting Installation Acceptance Test (IAT), Site Acceptance Test (SAT).
Review instrument loop drawings, P&ID, Hookup drawings
Pre-commissioning checks, Conducting Installation & Site Acceptance Test.
Preparation of Specification Sheet, cable Scheduling etc.
Preparing side CCP for construction realizing with witness client
Preparing side SRCC for construction realizing with witness client
Instruments commissioning work of Siemens DCS, Siemens power control system SPPA-T3000, Telephone Xp- S7 LER,PCC,CCR,CSB,
Carryout instruments line check and loop check of plant related system
Loop functional test of plant related system
Loop check and functional test of Electrical related panel, like MV switch geared panel LV switch geared panel, AC/DC Panel, Battery unit panel, transform unit, switch geared Breakers.
Preparation commissioning records of plant.
Preparing Document for the function test processor
Preparing cold & hot commissioning activity for plant
Carryout plant skids internal fictional test
Make plant skid cold function test, witness test whit client
Make plant skid hot function test, witness test whit client
Reports any abnormalities to commissioning i&c manager
Evaluate&confirm system specifications like Power Plant control philosophy, applied technology etc.
Tuning of Auto control Loops to suite the process
Applying international standard work practices and procedures during execution of above work
Commissioning of field instrumentation and control systems for STG, TG, BOP as per approved
Schemes & PID.
Preparing punch list for discrepancies, and getting punch points attended.
Logic Checking and Carryout changes in logics as per site requirements.
Tuning of Auto control loops
Carry out changes in HMI displays to make it more user friendly for operators.
Documentation of on site logic changes/modifications.
Organizing regular periodic meetings & trainings for staff & engineers for discussing current work issues and devising solutions for enhanced work performance.
Maintenance instrumentation control engineer activity
> Siemens DCS, Siemens power control system SPPA-T3000, Telephone Xp- S7, ET200 Siemens fail safe I/O
Device Family
> Foxboro I/A CP60 DCS, Rosemount RS3 DCS, Rosemount Emerson Delta v, DCS, Honeywell
TDC 3000 DCS, yokogawa centum (Blue star) DCS
> TMR ICS Triplex ESD
> Hima PLC, Allen Bredly PLC for compressor logic controlling, Packscan plc for motor operation
Valve.Make Smart I Q Rotork. Siemens plc for Filter bank, FT-50 controlling system for gas
Compressor (CRU) UNIT.
> Yamatake micro process system for Anti surge control,
> Microlect and antispro for Tank age level monitoring, relay interlock for comp controlling, and temp
Scanner Comp unit.Loading Unloading, by solenoid valve system. Woodward governor for gas turbine
Speed control,
> Denial gas flow metering system
> Vibration monitoring system Bentley Nevada 7200, 3000, 3500, and 1900 Series, Tecaxa, vibration
Switch, VM 400 Vibration system,
> Compressor Reciprocating type, makes, Neaman & Esser motor driven, capacity 62.000m3/h.
Mitsul Thomson motor driven capacity 35.28 mmscfd. Cooper Bessemer engine drive (CRU) capacity
32.35 m3/h and there lube oil, lubrication and cooling system,
> Compressor centrifugal type for recycle gas makes Creusol-loire steam turbine driven Capacity
2, 00000 mcf/h, speed controlling by Woodward mechanical type Governor, mitsubicy steam turbine
Driven multy stage capacity 1.25000 mcf/h and there lub oil controlling and oil, gas, steam, sealing
System
> Gas turbine for crude transit pump makes Ruston TA-1500, GE gas turbine 20 mw power generation,
Rlruston gas turbine 20mw power generator, simance gas turbine and GE gas turbine for 40mw
Power generator.
> Steam turbine for charge pump makes Creusol-loire, by speed controlling by mechanical Woodward
Governere type,
>. Analyzers O2 make smart Rosemount smart, H2 make Leeds & Northup, Honeywell 7866 digital,
Thermal conductivity sensor. Conductivity 141, to142 sensor 0 to 20 ms/cm makes Rosemount, PH
Make yokogawa 202s, SO2 in oil model ps6 masoneilan. NIR for ATK (RON, MON) octane numbers
Measuring, Flash. point.viscocity (centipoin).pore and clod, Dust and Opacity Monitor ( Durag D-R 290),
CL17 Chlorine Analyzer (HACH),DO,analyzer FELXA,PH analyzer (FLEXA)
> Fire&gas System, Genral monitoring, Crowcon, Detectronics for the H2S, H/C gas, UV detector,
Smoke Detector thermal detector, braking glass, mailting fuse plug, pneumatic FSD ESD system. .
Loop Checking & calibration ect.
>Erection and commissioning of Cole fire Boiler make AICE, and steam turbine power generation make
GE 20mw, Controlling system by yokogawa yew series 80, yew pack controller instrument’s
> Erection and commissioning job worke in knpc refinery Kuwait for CCR (continue catalytic rhefomer),
New Plant and Renovation of gathering center in (koc)
> Repairing and calibration various field process instrument like vibration monitor, control valve
GORTER with i/p converter siemens SIPART PS2 EExd,PS2 PA PS2 FF,GORTER monitor
Regulator 200********/32/33/34,Flame Detector, Elcontrol,UVH6FP/GP.Motor operating
valves(MOV), AUMA, on/off type, Control valve type, inching type. smart types of
Rosemount 3500 family model 1151, 3051, Honeywell st 3000 series, Foxboro idp10 series, AAB Kent
Toylor 600 series. Capacitance type level model ametek 509-7x.dcv 5000, 6000, siv I and II Smart
Positioning, control valve, Tankage level gauge like anraf 854 smart 800,802 analog digital types,
MOV (8th 4th wire) Operating by Powell relay.P, D meter (brook) Turbine meter. PT, FT, TT, LT, PDT, TIC,
PIC, FIC, LIC, PDIC, HIC and Receiver PID controller pneumatic Make Foxboro, Yamatek Honeywell,
Toylor.Masonellan.Displacer type LT/LC pneumatic Type, make masonilan, Fisher Rosemount. I/P
Converter, P/I converter, xv (shut up, valve) control valve operating by pneumatic transfer valve fail
Safe lock up Relay booster relay, make masonellan complex valve, Relife valve, and all types of
Switch’s pneumatic Electronic types gas date h2s, h/c, smoke, speed switch (Dae sung), SP500
Electro pneumatic Smart Positioner (spirax sarco), Capacitance Type Level Switch ( SCAP, SEOJIN INSTEC H)
Framo Morat linear actuators, (L-Cells or Microcells) SVS 2000, mov (BERNARD CONTROLS),MOV (ROTORK
ROMPAK REMOTE CONTROL, MOV (TMi ELECTRIC ACTUATOR, Enertork, electric actuator E65 up to
E210 (ebro armaturen), mov IQ Range (Rotork), level transmitter Prosonic S FMU90 (Endress+Hauser),
Rosemount 5400 Series, ECT.
Plant shutdown attended like GRT,MRT, and preventive plant shutdown in knpc refinery
Kuwait
Declaration
I hereby declare that all the above information are true and correct to the best of my knowledge. Any
required details will be submitted on request
Thanking you
Yours truly,
(HARISH J LAD)