Post Job Free

Resume

Sign in

Electrical Engineer Soft Skills

Location:
Ahmedabad, Gujarat, India
Posted:
April 09, 2024

Contact this candidate

Resume:

Soft Skills

• Communication skills

• Team Work

• Innovator

• Deep Thinker

• Goals Oriented

• Leadership

• Confident

Core Competencies

• Project and planning with

Commissioning (PSSR)

• Maintenance cost/budget

• controlling / Manpower

• Maintenance Management

• Material procurement &

Management, Equipment

Inspection

• Vendor Performance Evaluation

• Preventive, Predictive

and Breakdown

Maintenance

• SAP + ERP

Personal Details

Date of Birth: 11/07/1992

Languages known: English, Hindi & Gujarati

Address: C14, Vaibhav Bungalows,

Zadeshwar gam, Bharuch,

392011

Profile Summary

• I am currently working with DEEPAK PHENOLICS LIMITED, DAHEJ as a Senior electrical engineer from 05.04.2022 to Present.

• My previous company was MORESCO HM & LUB INDIA PVT. LTD. as Sr. Electrical Engineer from 21th Oct 2021 to 31st march 2022.

• TOYO CHEM CO.LTD part of TOYO INK GROUP as an Electrical engineer from Feb-2018 to Oct-2021.In this company I had involved in purely Electrical Maintenance and project work.

• I had stared my professional career from GULSHAN POLYOLS LIMITED, JHAGADIA GIDC as junior engineer from Nov 2013 to Oct 2018.

• Total 10 years experience in Electrical field to execute green field & brown field project and Pant maintenance activity.

Career Timeline: -

TOTAL EXPERIENCE IN PROJECT &: 10 Years

MAINTANACE FIELD (NOV’13-CONT)

1. GULSHAN POLYOLS LIMITED, JHAGADIA as

an Electrical Engineer: -Nov 2013 to Feb2018

2. TOYO CHEM CO. LTD (TOYO INK INDIA PVT LTD) as an Electrical Engineer (Maintenance & Project): -Feb 2018 to Oct- 2021

3. MORESCO HM & LUB INDIA PVT. LTD. as Sr. Electrical Engineer: - 21-10-2021 to 31-03-2022

4. DEEPAK PHENOLIC LIMITED DAHEJ as a Sr. Electrical Engineer: - 05-04-2022 to Present

NIKUNJ SOLANKI (Electrical Engineer)

Young professional targeting a challenging assignment in areas of Project and planning, Plant Maintenance in Petrochemical & Gas Industry. Mo - 846******* E-mail: - ad4vue@r.postjobfree.com RESUME

IMS (INTEGRATED MANAGEMENT

SYSTEM) DOCUMENTATION WORK;

1.ISO 9001-2015 (QMS)

2.ISO 14001-2015 (EMS)

3.HIRA- 45001

4.OHSAS - 45001

Education

B.E (ELECTRICAL) from SVMIT, Bharuch

in 2013 with 6.78 CGPA.

DIPLOMA (ELECTRICAL) from K.J

POLYTECHNIC, Bharuch in 2010

with 65.45%.

SSC (10th) Panini Pragna Parab

school, RAJPARDI in 2007 with

78.15%.

PROJECTS

1) TOYO CHEM CO. LTD

(Polymer & solvent base

expansion project): -

PSA (Pressure sensitive

adhesive): - 80 Cr.

Gravure chemical: -50 Cr.

2) TOYO PLAST CO.LTD

Plastic Colorant plant.

3) GULSHAN POLYOLS

LIMITED, JHAGADIA

PROJECTS

Starch Plant Expansion Project.

New MCC & APFC

panel installation.

VFD installation.

Responsibilities

(PROJECT)

• I have handled three diff. project

like PSA, GRAVURE & PU

Expansion to involve all Electrical

activity.

• In PSA, project completion as per

planning time line with quality &

safety.

• 100 % involved in details

engineering phase, technical

approval, planning and execution

work within scope and budget.

And gravure, PU project are

ongoing.

• Prepare execution plan as per

details at site and coordinate with

internal resources and external

vendor for smooth execution of

project.

• Job Description:

• Conduct JSA (job safety analysis) before initiating any work and issue permit accordingly participate in RCA (Root Cause analysis) and required for any deviation.

• All equipment’s installation as per standard procedure like IQ sheet.

• Conduct PSSR (Prestart up safety review) before set-up of the plant and company with the finding raised PSSR punch point and attendee it.

• Monthly meeting with management expert with project status discussion and any other bottle neck issue.

• Proficient with QAP, Inspection and Test Plans, Technical Specifications.

• In charge of safety at site for project execution, follow& implements site HSE rules and housekeeping standards to maintain safe and clean environments.

• Working with Project G.M. and assist them for Plant expansion project.

• Handling ISO 9001-2015, ISO 14001-2015, ISO 45001 External or Internal Document’s work.

• Utility management, men power handling, Responsible for Department related Issues. Planning Preventive maintenance, routine maintenance, installation, commissioning, testing of Assets/machines.

• Procurement Materials & assets as per requirements.

• Materials management, Quality assurance, BOM, Test certificate, manuals etc.

• Control of stock consumable items and spares.

• Utility control (Power, water, Air, DG, Boiler, ETP, STP), 66 Kv switchyard, DG, Maintenance of VCB, ACB, Transformers, Motors Maintenance of 4.3 MW 11kv HT motor to.5HP to 300HP LT motors. Knowledge of PLC, VFD, Star-delta, DOL.

• IMCC, PCC, MCC, APFC Panel Installation & Commissioning, testing. Responsibilities

(MAINTENANCE)

• Plant maintenance: Coordinates operation, maintenance and repair activities to obtain optimum utilization of machine and equipment.

• Condition monitoring planning, thermography testing, FRM & other activities planning.

• Plan, coordinate and execute Electrical maintenance activities in plant to ensure trouble free running plant by eliminating Electrical maintenance related abnormalities and to achieve set targets.

• Oversee installation, operation, maintenance, repair to ensure that machine and equipment are installed, and functioning according to specification.

• Examine reason for Electrical Equipment/switchgears/assets failure and locate exact problem. Suggest remedial measures and give repair/replace instruction.

• Establish and coordinate the Electrical maintenance and safety procedures, service schedule and supply of materials required to maintain System and equipment in the prescribed condition.

Reference: - IT Skills: -

1) VIRAL DOSHI (Mob: -968-***-****) 1. Microsoft Tools (Word, Excel, Power point). 2) KRUNAL PRAJAPATI (Mob: -780*******) 2. Microsoft Office 3.Auto CAD

5. Project planning

Declaration: - 5. Monthly presentation (MPR)

I hereby declare that all the details furnished here are true to the best of my knowledge. WORK FLOW CHART: -

HOD (MR. LALIT SEJWAL)

SENIOR MANAGER (MR. GIRISH PILLAI)

SR. ELECTRICAL ENGINEER (NIKUNJ SOLANKI)

SHIFT ENGINEERS & GET ENGINEER (8 +1)

& ELECTRICIANS (4 IN G SHIFT + 6 IN SHIFTS)

Yours Faithfully,

NIKUNJ SOLANKI



Contact this candidate