Aldrin D. Martinez
**-** *** **** ***** North Drive Singapore 461222
**********************@*****.***
Summary:
Civil Engineering Graduate with varied background and experience. Seasoned, motivated professional with more than 10yrs of experience in the construction industry. Experience in the construction of MRT station (top-down and conventional method which includes road diversion, drain diversion, ERSS such as diaphragm wall, strutting, instrumentation, deep excavation, and bored piles. Involves in the construction of High-rise building, Gas station in the Philippines and few MRT projects in Singapore.
Professional Experience:
LAND TRANSPORT AUTHORITY
Project Engineer - Present
CR107 Pasir Ris East Station
- In charge of area 2A to area 2D, managing the construction progress and safety of currently on-going project for cross island line.
- Planning, scheduling, conducting, and coordinating the technical and quality control aspects of assigned project.
- Monitor jobs for compliance with specifications, applicable codes, engineering practices, and company standards.
- Supervised the diaphragm wall construction for the Pasir Ris East main station box to ensure safety and quality of the work being done by the contractor.
- Review method statement and risk assessment submitted by the contractor.
- Oversees project planning process including developing of project management plan to execute the work in accordance with the master schedule.
- Conduct presentations for the team with regards to the progress and updates of the site.
- Manage the installation of instruments needed to monitor the settlement of the adjacent structures and ground settlement.
- Coordinate with the relevant authorities to avoid any damage to utilities, as many of the utilities are below the ground surface.
- Attends meetings with contractors and engage with the relevant stakeholders to address the concerns and feedback coming for the public.
LAND TRANSPORT AUTHORITY
Principal Assistant Project Engineer April 2017– March 2023 CR1089 – Sewer and Utility Diversion
- Involved in managing utility diversion, particularly sewer line as preparation for construction of future MRT station along Pasir Ris Drive 1.
- Communicate with relevant authorities for the diversion of Telecommunication, Power and Gas line.
- Prepares daily, weekly and monthly progress updates and reports.
- Manage the site progress and safety.
- Coordinate with the QPS, RE and RTO to ensure that the design has been followed.
- Conduct site regular site inspection to assure compliance to approved plans and drawings.
LAND TRANSPORT AUTHORITY
Senior Assistant Project Engineer March 2013 – April 2017 DT34 Upper Changi Station and DT33 Tampines East Station
- Prepare daily and weekly reports.
- Coordinates with QPS, RE and RTO to ensure that the quality of work has been done according to the approved design.
- Supervised diaphragm wall construction for the Upper Changi Station.
- Supervised the construction of station, cut and cover tunnels and bore tunnels for Tampines East Station.
- Manage the traffic diversion above the cut and cover tunnels.
- Ensures the safety of the workplace and progress of work during the construction of the MRT station and Tunnels.
- Coordinate with the Civil Defense department to ensure that the design of the structures has been followed and according to the approved and updated drawing.
- Handover the station to the operator and manage the defects for Station and tunnels.
- Track possession officer for tunnel maintenance. TWA INC, (FLYING V)
Project Engineer
September 2012 to February 2013
- Conduct site visits to ensure that the progress of the project is based on the timeline given to the contractor.
- Coordinates with the design team and contractor to ensure that the project is done according to specifications.
- Supervised and manage the construction of Gas station with South Luzon particularly Taguig, Cavite, Laguna and Tagaytay.
Leighton Contractors (Phil) Inc
Site Engineer
February 2010 to August 2012
- Involved in the construction of a 34-storey building in Makati city.
- Prepares document for inspection and concrete casting.
- In charge of the concrete casting and ensuring that the quantity of concrete is in accor dance with the design and actual estimated volume.
- In charge of the architectural finishing from basement 5 to level 3 including the water features.
- Work along with QA/QC staff to ensure quality of work. Education:
Tertiary : Rizal Technological University
Boni Ave. Mandaluyong City Philippines
Bachelor of Science in Civil Engineering
2003 – 2009
Secondary : New Era University
Milton Hills Diliman Quezon City Philippines
1999-2003
Primary : Pedro P. Cruz Elem. School
Maria Clara St. Mandaluyong City
Philippines
1993-1999
Personal Information:
Gender: Male Civil Status: Married
Age: 37 Citizenship: Filipino
Birth Date: June 09,1986 Religion: Iglesia Ni Cristo Place of Birth: Mandaluyong City, Philippines
Software:
MS Office, Adobe Photoshop and Autocad.
Language:
English / Filipino