Paul J. Wegner
623-***-**** / ad4rhk@r.postjobfree.com
PROFESSIONAL SUMMARY:
Advanced Senior Work Control Planner who has over 15 years industrial experience working at Commercial Nuclear Power Plants planning, supervising, and managing. Plus, seven years Department of Energy experience working at nuclear sites planning complex and high-risk work.
PROFESSIONAL EXPERIENCE:
Central Plateau Cleanup Company, Hanford, WA 4/2022 - Present
DOE, Advanced Senior Electrical/Mechanical/I&C Work Control Planner
Maintaining project work packages and schedule status updates with JCS software.
Subject Matter Expert in change management and configuration control processes.
Conducting field walk-downs to ensure that work conforms to the design requirements.
Amentum, Hanford, WA 5/2019 – 4/2022
DOE, VIT Plant, Senior Electrical/Mechanical/I&C Work Control Planner
Interpreted electrical and mechanical schematics and blueprints to write up repairs.
Developed LOTO permits, lockout /tagout plans and work orders service requests.
Performed facility completion walk-downs, punchlist management, turn over packages.
Developed work order packages for highly complex and high-risk work activities.
United Global Technologies, Los Alamos, NM 5/2018 – 3/2019
DOE, Los Alamos National Labs, Senior Electrical/Mechanical/I&C Work Control Planner
Performed duct work and duct support installation, inspection, and leakage testing.
Reviewed construction work order packages prior to submitting for final approvals.
Participated in technical coordination of subcontracts and done Field Engineering.
AREVA Federal Services, Aiken, SC 11/2016 – 5/2018
DOE, Savannah River Site, Senior Work Control Planner/Scheduler III
Performed schedule status, monitoring, progress, and reporting on a weekly basis.
Ensured welding mapped work orders were routed and implemented in the field.
Understood HVAC V&ID’s, orthographic drawings, duct support engineering drawings.
Southern Nuclear Company, Plant Vogtle, Waynesboro, GA 11/2015 – 10/2016
Senior Electrical/Mechanical/I&C Work Control Planner
Managed assigned maintenance corrective actions and lead performance assessments.
Reviewed various technical engineering vendor drawings, schematics, and documents.
Functioned as Design Change Package substation and cable tray subject matter expert.
Arizona Public Service, Palo Verde Nuclear Power Plant, Tonopah, AZ 12/2012 – 11/2015
Senior Electrical Substation / Cable Tray Work Control Planner
Provided feedback to management on the Planning’s Team overall performance.
Developed materials specifications for all equipment on the work orders bill of materials.
Revised procedures as necessary to implement planning process improvements.
Performed in-depth research of engineering drawings for all the planning work orders.
Xcel Energy, Prairie Island Nuclear Power Plant, Welch, MN 11/2007 – 12/2012
Substation / Cable Tray Planner / Supervisor / Facilities Manager internally promoted
Interfaced with Management, Supply Chain and Engineering to identify planning issues.
Performed day-to-day supervision of projects and attended schedule status meetings.
Managed craft workers to assure compliance with work orders and procedures.
Managed assigned scope and subordinates by ensuring adequate resources for work.
Target, Corporate Data Center, Brooklyn Park, MN 01/2007 - 11/2007
Chief Data Center Operating Engineer
Wrote trouble-shooting plans to identify what was involved in completing projects.
Performed Subcontract Formation and BEA (Bid, Evaluate, & Award) development.
Repaired, installed, dismantled, and troubleshoot mechanical/electrical equipment.
Jones Lang LaSalle, Eagan, MN 08/2005 - 01/2007
Chief Data Center Operating Engineer
Provided technical support to field personnel and performed field inspections.
Defined procedures, drawings, and materials required to perform planned work.
Conducted field walk-downs to identify and analyze maintenance / modification activities.
Northwest Airlines, Eagan, MN 01/1997 - 08/2005
Chief Data Center Operating Engineer
Knowledge of SMACNA, ASME AG-1, and related ASTM material standards and codes.
Identified required parts, special tools then coordinated generation of support activities.
Interpreted electrical and mechanical schematics and blueprints to perform critical work.
Koch Industries, Rosemount, MN 12/1990 – 12/1996
Lead Turnaround Planner
Maintained project work packages and schedule status with CMMS/P6 software.
Prepared detailed material specifications for bill of materials and labor estimates.
Developed work order packages for highly complex and high-risk work activities.
PROFESSIONAL EDUCATION:
Excelsior College, Albany, NY – Online Courses 6 /2023 - Present
Bachelor of Science in Electrical Technology
Inver Hills College, Inver Grove Heights, MN 5 /2002 – 5 /2003
Planning and Project Management
Dakota Technical College, Rosemount, MN 1 /2001 - 12 /2001
HVAC, PLC, and Print Reading
North Central Technical College, Wausau, WI 8 /1989 - 12 /1990
Industrial Electrical Apprentice
Chippewa Valley Technical College, Eau Claire, WI 8 / 1984 – 5 / 1986
Applied Science HVAC Associate Degree, GPA: 4.0
W.C. Beede Scholarship Award, Treasurer and Student Senate President
St. Thomas University, St. Paul, MN 8 / 1983 – 5 / 1984
Math and Science Courses
COMPUTER SKILLS:
Microsoft Excel 1-2-3 Smart Plant / Plant Pilot 3D Designs
Microsoft PowerPoint Imagenation Weld Maps / Weld Docs
Microsoft Project Asset Suites / Job Control System
Microsoft Word Enterprise Asset Management
SAP / P6 Passport / Maximo
CAREER ACCOMPLISHMENTS:
Certified Facilities Management Professional Qualified Mechanical Engineering Systems Qualified Senior Electrical/Mechanical Planner Qualified Mechanical Maintenance Planner
Certified Confined Space Rescue Technician Certified Emergency Medical Technician
Certified First Aid/CPR Instructor Koch Industries Fire Department Trainer
Certified OSHA Safety Instructor City of Rosemount Fire Department Trainer
RS Means Cost Works Estimating Facility Maintenance and Repair Estimating
Outage Radiation Worker III Trained Vibration Analysis and Diagnostics Testing
NFPA 70 Code Fire Testing Trained Commercial Nuclear Issued Q-Clearance
Supervisory Control and Data Acquisition Computerized Maintenance Management
RWP’s (Radiation Work Permits) ECR’s (Engineering Change Request’s)
FCR’s (Facility Change Requests) ECN’s (Engineering Change Notices)
40 Hour HAZ MAT Technician Certified Radiological Worker II Certified
Manager Root Cause Analysis Trained LOTO Permit Clearance Writer
Asbestos Senior Planner Qualified HAZ MAT Senior Planner Qualified
Category 3 Nuclear Facility Trained Hanford Advanced Senior Planner Qualified
Administering To Subcontractors Supervising Mechanical Subcontractors
Punch List Management Trained Lock Out Tag Out Permit Writer Certified