LEWIS C. OUZTS
Zephyrhills, Florida 33542
352-***-**** ad4oyu@r.postjobfree.com
727-***-**** cell
Consulting Superintendent
September 2022 to Present
ACE Consulting LLC
Assigned to KMK Construction
Construct New VA Cancer Center
Richmond, Virginia
Senior Superintendent
May 2013 to February 2021 (Retired)
J Kokolakis Contracting, Inc.
202 E. Center Street
Tarpon Springs, FL. 34689
Orange County Solid Waste, FL - $37 Million
Demolition of existing waster center and construction of new.
Northwest Transfer Station
Constructing a new Solid Waste Transfer Station building over an existing building, then demoing the old structure from the inside of the new structure while not disturbing the operation of the Transfer Station and construction of new truck scales, cranes, access roads, pavement overlay of existing, underground utilities, hydro demolition of existing building slab on precast panels and pour back of 8,000 psi tipping floor, fire alarm, gas detection, new electrical and fire pump buildings to support the new facility.
Project Superintendent
September 2012 to May 2013
Satterfield & Pontikes Construction
Suite 105
Veterans Blvd.
Kenner, LA. 70062
PK-12 School Phoenix, LA – $28 Million
Correcting hurricane damage to a new 225K sq. ft. school project for FEMA.
Site Superintendent
June 2011 to June 2012
CAPE Inc.
6851 Oak Hall Ln. Suite 200
Columbia, MD 21045
Dobbins ARB, GA – $7 Million
Design/Build contract to modify F-16 hanger to Air Ground Equipment Maintenance.
Hanger 10 Andrews AFB, MD - $12 Million
Design/build contract to modify post WWII hanger to accept USAF KC 135 aircraft tanker.
General Superintendent
May 2003 to April 2011
Yates Construction
115 Main Street
Biloxi, MS 39530
Battle Command Training Center - $30 million
Fort Bragg, NC 28307
General construction of a training and educational center for tactical operations, after action review, offices and work cells for US Army Corps of Engineers.
Design Build Package 11 - $80 Million
Kessler AFB, MS 39503
Design/build of a Fire Crash Rescue station, new Student Dormitory, Golf Course Clubhouse and Community Center to replace facilities damaged by hurricane Katrina.
A3 Test Stand - $16 Million
Stennis Space Center, MS
Fabrication and erection of steel structure (3100 tons) for NASA’s new J-2X rocket engine test stand used in the Constellation program.
Margaretville Casino and Hotel - $700 Million
Biloxi, MS
Construction of a casino and hotel on a 20’ podium on the beach. Completed $150 million when investor’s finances were cut off by the banking industry.
Seminole Hard Rock - $280 Million
Tampa, FL
144k sq.ft. expansion of existing casino, new gaming area, steakhouse, buffet, 2 working kitchens, 1 viewing kitchen, 2 bars, executive offices and 7 story parking structure.
LSU Tiger Stadium West Side Expansion, $76 Million
Demolition of the upper elevated deck and replacement with larger deck, expansion of existing stadium.
Evangeline Down - $80 Million
Construction of a Casino and Horse Racetrack on 525 acres in Opelousas, LA. Supervising all subcontractor trades, big box construction with a 1,647 slot machine gaming area, 5 restaurants, 3-story enclosed viewing grandstand.
Superintendent
August 2002 to May 2003
AMEC Civil LLC
1633 Broadway
New York, NY
John Kerr Lake Bridge – $78 Million
Erection of a 4900’ bridge crossing John Kerr Lake Reservoir for Highway 58 by-pass in Clarksville,Va.
Site Manager
Sept. 2000 to August 2002
Metso Minerals
4800 Grand Ave., Pittsburgh, PA 15225
Sincor Oil, Jose, Venezuela - $36 Million
Installation of a Dual Orbiting/Slewing Ship loader system for Sincor Oil’s Coke Terminal. This machine is a prototype and all conveyors were erected on a dock/jetty 2.5 kilometers offshore to load 65K metric ton ships. Finished 4 months ahead of schedule.
Florida Power Corporation, Crystal River, FL - $23 Million
Demolition of 5-story transfer towers, foundations, chutes, conveyors and 2.5 million-pound bucket wheel stacker/reclaimer. Civil/site work for new coal handling system. Erection of new transfer towers, chute work, mile of conveyors and 2500 ton per hour new bucket wheel stacker/reclaimer.
Senior Project Manager
Oct. 1992 to Aug. 2000
(3 years) (5 years)
DCL Construction Inc. Metropolitan Construction Inc.
Orlando, FL Maitland, FL
(Both companies owned by same people)
General Construction Projects;
Hotels Health Care Centers Schools Restaurant
LaQuinta (4) Beverly Health Care: St. Pete Jr. College Treats
Fairfield Inn Tampa Lk Brantley High Barney’s
Springhill Inn Rosemont Deland Middle Uno Pizza
Embassy Suites (3) Lake Underhill Banks Water Treatment Plant
Summer Bay (2) West Palm Beach First Union (4) Dyal (City of Cocoa)
Tenant Build Outs Orlando International Airport Church
Sunglass Concession Customs Air Side (A & B) St. James Assembly
Tie Rack Baggage Claim Warehouses
Warner Bros. New Escalator Foundations (4) Lucent Technologies
Plant Manager
Sept. 1990 to Oct. 1992
Carolina Steel Corporation
795 Industrial Park Road, Bristol, VA 24201
Complete responsibility, including production, maintenance, budget, payroll, consumables and utilities for a 400,000 sq. ft steel fabrication plant engaged in fabricating plate girders for bridges.
Superintendent / Project Manager
Dec. 1988 to July 1990
Industrial Steel, Inc.
Steel Erection of Weather Protection at complex 39A for the Space Shuttle, platform install on complexes 40 & 41 and various Fabrication and Erection jobs on Kennedy Space Center and Cape Canaveral AFS.
1980 – Community College of Beaver County, Monaca, PA – AS in Industrial Management
1980 - 85 - 300+ CEU’s in Construction Management from Wittenberg University, University of Pittsburgh and Penn State
2023 - U.S. Army Corps of Engineers – Renewed Construction Quality Management for Contractors
2022 – Renewed OSHA – 30 Hour, First Aid & CPR
2013 – Hazwhoper 40 hour