Post Job Free

Resume

Sign in

Network Technician Fiber Optic

Location:
Seguin, TX
Posted:
March 30, 2024

Contact this candidate

Resume:

John R Mashl **** rivertrail

ad4ok4@r.postjobfree.com Seguin Tx

830-***-**** 78155

Qualifications Summary:

Possesses over 7 years of experience with operation and maintenance of tactical and commercial telecommunications equipment to include 3 years of experience with Trunk line Fiber Optic cable Installation, Relocation and Emergency cable cut response with an additional 2 years of experience working with VSAT & I-Direct modems and 2 years of Wi-Fi Installation experience. BICSI TE-350 Network Technician #171423T, FOA Fibre optics technicion #24300057 Clearance: Inactive DoD Top Secret

Certifications:

BICSI TE-350 Network Technician (#171423T)

F.O.A. certification (# 24300057) with the additional MIL-SPEC certifications in accordance with NAVSEA STD 009-73 and MIL-STD-2042

Professional Experience:

5/01/2023 TRO Energy solutions / LHI

Network infrastructure upgrades for Dept of State Embassy locations worldwide. 8/14/2022 - 11/7/2022 Anistar/ I.E.S / Facebook Meta worked on the buildout of facebook/ meta database in houston 5/18/18 - 11/04/2021 Hyperion

Working network and equipment upgrades for IBM/D.A.C.A for the U.S. Commisary. E.O.C. 5/18/16 – 12/31/18 Google Fiber/BlueStream

Working on operation,maintenance,and expansion of the Google Fiber network in Austin Tx. initial build out of regional and neighbourhood nodes, Testing and extensive documentation of new and existing regional and neighborhood nodes in the Google fibre network in Austin Tx. 6/14/14 – 6/30/16 Nesco/Blackbox

Working on Network upgrade for Austin Independent School District. Installing multi mode fiber, operation of fujikura F60S fusion splicer. Installation and relocation of Cat6 cable, 24 and 48 port patch panels,testing and documentation. Installation of network infastructure in office space in Austin for software development companys.Database expansion for Google and Apple at Data foundry expansion of storage capacity.

11/11/12 – 04/01/13 DRS-TSI

Working at Bagram AFG on C4ISR/ARCENT contract running Fiber optic cable from Trunk line vaults and providing NIPR,SIPR,CENTRIX,and VOiP into new buildings. network installation from vault to cubicle.

12/1/11 – 4/30/12 DRS-Defense Solutions

Involved in the phase II install of the Camp Leatherneck WiFi Project, which is a mesh wireless network using Aruba, Motorola, and Cisco equipment. It is comprised of over 700 access points, 22 back hauls that handle the daily sustained traffic of over 3500 subscribers. My duties consisted of installing L.A.N backhauls, on site or up on the towers, installing subscriber modules and antennas, learning how to isolate problems through the Aruba controller or remotely via SSH. Troubleshooting connection problems for the customer and working on the help desk when required. 11/20/09 – 9/12/11 DRS-Defense Solutions

Responsible for the Installation and maintenance of V.S.A.T. Satellite dishes and I-Direct 5000 modems to provide telecom and internet connectivity for client in Afghanistan. Access point and Wireless bridge installation,I.T.support for VSAT and small network at PRT/ZABUL, Help desk support. Cat5 cable installed at KAF in Hicks Administration building. 2/5/08 – 10/5/09 Horizon Telecom / Ranch Wireless

Installation

Responsibilities: Installation of Motorola 2.4 GHz canopy microwave transceivers at customer’s location to provide internet connectivity to a network of 30 towers across a three county area of Texas. Adding to, modifying, and repairing a network of 5.7 GHz access points and supporting equipment. Responsibilities also included responding to customer’s service requests. 4/20/08 - 6/16/08 Eastern Construction L.L.C

Installation / Construction

Responsibilitys: Carpenter Installation and upgrading of existing office space for D.O.D. client in Afghanistan.

3/15/08 -4/15/08 Hardline Installations / Kasemann construction Installation / Construction

Responsibilites: Installation of 70,000’ of 4 and 8 strand multimode fiber for D.O.D.client in officespace at the New U.S.Embassy Complex, Bagdad 8/08/07 – 3/01/08 Horizon Telecom / Ranch Wireless Installation

Responsibilities: Installation of Motorola 2.4 GHz canopy microwave transceivers at customers location to provide internet connectivity to a network of 18 towers across a three county area of Texas. Adding to, modifying, and repairing a network of 5.7 GHz access points and supporting equipment. Responsibilities also include responding to customer’s service requests. 7/1/07 – 7/25/07 Robert Half Technology

Installation

Responsibilities: Short term contract installing thin client workstations for Texas Department of Transportation including in vehicle inspection areas all across north central and west Texas. 4/25/06 – 5/20/07 H.B.Zachry

Responsibilities: Issued a Top Secret A-R security clearance to work at the Zachry/Caddel N.E.C. Project in Beijing. Duties in the Mechanical department involved fabrication and installation of fire protection systems that required pipe fabrication, system layout, and installation the pneumatic and hydrostatic testing of completed sections of system. Also worked on the seismic bracing of main and lateral lines.

9/04 - 12/05 San Antonio Community College

Computer networking Degree

Responsibilities: Studying computer hardware function and interaction with software. Development of practical applications for C++, and C languages. Emphasis on learning how to utilize the Linux operating system in the administration of computer networks. Equipment and Tools operation:

Configuration of Canopy radios and Mikrotik routers. Mid-level Linux user able to perform basic system administration functions. Operation of backhoes, front-end loaders and man-lift equipment. Familiar with Vermeer Directional boring rigs. Proficient in power and hand tool operation. Education

San Antonio Community College

attending part time for an A.S. Degree in computer networking. Fibertrain

fibertrain.com F.O.A. certification with additional MIL-SPEC certifaction for shipboard and feild connectors. cable termination,splicing and troubleshooting utilizing powerlight meter, O.T.D.R i have completed a week long certification class with fibertrain 07/27/08 fibertrain.com with Dennis Fain owner/instructor.

F.O.A. certification (# 24300057) with the additional MIL-SPEC certifications in accordance with NAVSEA STD 009-73 and MIL-STD-2042,

including MIL-C-83522 light duty connectors,pierside connectivity Hermaphroditic connectors,MIL-T- 29504 Termini,and cotts connectors on MIL-PRF-85045 and COTS cabling. BICSI:

TE-350 Certified Network Tech #171423T

References:

David Mckinszey Lead Tech Ranch wireless ad4ok4@r.postjobfree.com 803-***-**** Ken Kursza General Dynamics I.T. 727-***-**** ad4ok4@r.postjobfree.com Chris King Supervisor/POC I.O.C./facebook/Meta 719-***-****



Contact this candidate