Post Job Free

Resume

Sign in

Operations Manager Project

Location:
Lexington, TX
Salary:
Entry level salary
Posted:
March 21, 2024

Contact this candidate

Resume:

Donell Granados

*** ****** ***** ****, ***********, TX 78114

210-***-****

ad4hqq@r.postjobfree.com

• Sales and Customer Relations • Field Technical Support • Project Management

• Personnel Management • Operations Management • Manufacturing Oversight P

Sunbelt Electric March 2023 – Present

Operations Manager- Electric Vehicle Division

o Formulated strategic alliances with distribution, construction, tech/software arms to strengthen service delivery model and increase market-share.

o Developed workflows to predictively manage projects and reduce quality issues. o Overhauled pricing structure to allow for stronger margins & set P&L protocols to scale model. o Set performance based KPI metrics to manage direct employee technicians within the organization. Flash, Austin TX August 2020 – November 2022

Implementation Project Manager – Parking & Electric Vehicle Division o Managed the implementation life-cycle of both parking and Level 2 charging station projects across the U.S. Starting with the Client Kickoff Call, weekly rhythm cadences, installation and post installation Follow-Up. Prepared clients for the installation and guaranteed all software & network deliverables were met to adhere to the scheduling of the project installation. o Completed all local municipality permitting requirements applicable to the project to include: Single Line Drawings, Business licensing, Product Cut Sheets, Artisan Designs, & any sourced drawings required from the General Contractor, or Building Engineer (Electrical, HVAC, General Utility). o Vetted any subcontractor awarded a project with Flash to insure they maintained all current licenses i.e. (COI w/Proper Liability amount, Signed MSA, Master Electrical License, General Contractor Certification) o First PM assigned to EV Division. Worked closely with upper management to vet new subcontractors, create the Project Implementation Tracker for SalesForce injection, and knowledge share with peers on “Lessons Learned” from post installations, to deliver the highest standard of service quality to all Flash clients. NexTier /Keane Group, Odessa TX July 2018 – August 2020 Southwest Basin Manager

o Managing over 300 personnel in the Southwest Basin, overseeing the project life cycle of up to 20 ongoing Projects for Chevron, Shell, Exxon, & Ovintiv:

Sales - Client Relations; Project Bidding; Client/Solution Management; and Investigation/Failure Review.

Manufacturing Floor – Multi Project/Client Product Assembly; Scheduling; ATF/NRC

Logistics/Delivery – DOT Compliance, Multi-Project Supply Chain Solutions

Field Operations/Project Well Completions – Managing up to 6 Field Service Managers in the Basin, each assigned up to 4 project/well completion locations; Failure Investigation/Review -

Accounting – monitoring and approving project/asset expenditures and payroll. PROFESSIONAL EXPERIENCE

QES Wireline, Odessa TX June 2017 - July 2018

Operations - Field Services Manager

o Managed Field, Logistics, and Shop Personnel through project life cycles at the Odessa QES District. o Supervised and implemented regulations for DOT Fleet and Supply Chain Personnel throughout the District. o Oversaw Client Accounts by steering project/personnel scheduling to meet client demand/timetables. o Monitor and Quality Control of all Client deliverable data before sending to customer. AT&T, Austin TX May 2015 - June 2017

Tenure III Network Technical Advisor

o Conducted onsite support and installation at the AT&T Telecomm Plant, to support the Austin based business network. Dialog Wireline, Odessa-TX October 2014 - April 2015 District - Field Services Manager

o In charge of Operations Project-Well Completions for Major Oil Companies throughout the Southwest S. o Provided Service Quality / Product Quality Control for all districts in Texas and Oklahoma. JW Wireline, Pleasanton TX March 2013- October 2014 Service Quality Coordinator

o Provided Service Quality / Product Quality Control for all districts throughout the Continental United States. o Design, Document, and Conduct training for all JW Field Engineers throughout the company. o Prioritize Project Field Audits to conform to customer standards and assure flawless product quality control, be driven throughout the project life cycle to safeguard client relations in highly competitive market conditions.

Weatherford International, Alice- TX March 2012- March 2013 Senior Field Engineer

o In Field Personnel Supervisor for Wireline Well Completions throughout project life cycle. Schlumberger Technology Corporation, Shreveport LA August 2008- March 2012 Senior Field Engineer

o In Field Personnel Supervisor for Wireline Well Completions throughout project life cycle. o Managed all Pressure Control testing and certifications for Wireline Well Completions. U.S. Air Force Reserves, San Antonio TX - Shreveport LA August 2006- August 2014 Staff Sergeant - Flight Control Avionics Technician o Conducted Executive Leadership and Planning to Air Force Technicians in analyzing and troubleshooting aircraft avionics equipment and electrical systems for the US Air Force Reserves. o Supervise Avionics Technician Teams in repairing electronics/component level - installation, integration, and calibration of electronic and avionics systems. Avionic Electrical Technician Sheppard Air Force Base, Wichita Falls, TX/ Keesler AFB, Biloxi, MS

Increased Basin Profit Margin from 17% to 28%, 5% above CEO mandated 23% margin in 2019 achieving highest metrics in company history.

Consolidation, Integration, and Utilization of Assets/Personnel throughout three separate districts in the Southern United States throughout the merger process of C&J Corporation and Keane Group into NexTier Technology.

Within the 1st week starting at NexTier/Keane Group volunteered to take on Field Service Management of the most problematic client project, supervising field personnel around the clock and within the 2nd month, changed the project from the #1 most failure prong field project group to the most efficient field project group in the company; setting 24 hr. and multiple monthly well completion records.

Utilized sitting equipment by starting a Mechanical Services / Day Work division, increasing Basin revenue by

$100k/month.

Developed Companywide Explosives Technical Documentation to bridge the gap between NexTier/Keane Groups existing company policy to minimize errors and comply 100% with ATF Government Standards.

Transparent failure analysis and co-op improvement, increased client relationships with the largest Major Oil Produces in the Permian Basin.

FlashParking Award for Project Completions

Oilfield Commendations: Haynseville Shale Completions Record,

Military Commendations: Recipient of the United States Air Force Achievement Medal. EDUCATION

AWARDS

SELECTED ACHIEVEMENTS



Contact this candidate