Name: SANJAY A. ADARKAR
Position: ELECTRICAL SUPERVISOR
Nationality: INDIAN
Contact:
MAIL:*****************@*******.***
Professional Summary
Total 28 years total experience.
•28 years minimum experience in Oil & Gas, refinery, or petrochemical industry, with exposure to heavy oil projects. Have managed large sized construction projects involving all stages of the Projects leading a Team.
•Punch list coordination ITR and NCR closing, MC walk down turnover and hand over procedure etc.
•Planning Monitoring, control, coordination and supervision services as well as assistance for the assigned project inclusive of budget formulation, cost control and quality assurance.
•Support services for supervising and directing engineering, procurement and management of construction contractors appointed by the Client.
•Services for Oil & Gas production activities including start-up and initial operations assistance as well as operational personnel and systems as required by the Client.
•Coordinate multy discipline engineering activities to ensure projects such as FEED (front end engineering design) studies and preparation, ITB (invitation to bid) check estimate preparation, LSTK (lump sum turnkey) tender package preparation are executed in a safe, efficient, cost effective and timely manner.
•Act as primary technical coordination interface with client to ensure that the client’s expectations are satisfied.
•Ensure the project conforms to the client’s approved Basis of Design and all applicable regulatory and code requirements.
•Fully responsible for execute work with HSE and Quality plan following code of conduct and code of practice
Experience in Construction,Supervision Engineering and Management
Site based experience, construction supervision co-ordinate and clearing punch list a very strong background in substations, pumping stations, chemical plants, and field equipment’s and instrumentation with trouble shooting and strong Oil and Gas construction HSE background fully involved in quality telecommunication project with MEW for water distribution canter
control, training, preparing project submission documents such as RAM, JSA, MSDS, WMS, LIFTING PLAN, WPS, RA MDS ETC, very strong ability in from site temporary facility establishment till site closer.
Equipment's: Motor. Transformers, Panels, Bus-ducts, Lights, HVAC units Compresses Cranes Heavy Earth moving Equipment's and Forklifts, Battery Bank UPS Boiler Chillers Plant Cooling Tower, Furnace and ovens tanks valves measuring Instruments
Special: Training the team as a part of Learning and Development team. Recruiting .and Assessments for
New position: As a technical Assessor. Recruiter CO -ordination for punch list clearance
Essential Skills/Experience and environmental
Field: Electrical, Instrumentation and control and communication, BMS,
System: Power, Hydraulics, Pneumatic s, Electromechanical, Auto Electrical.
Worked: Management, engineering, Construction Maintenance and Repair Production, Testing and Commissioning.
Activities: Cable pulling. Tray conduit Trunking, tubing Equipment's installation, wiring, testing commissioning inspection. Documentation, scheduling etc.
Specific Accountabilities
• Ensure to comply with all aspects of the Work site HSE Plan and policy; site regulations, permit to work, and Customer requirements. to the latest approved for construction (AFC) project drawings,
Specifications, procedures and site instructions.
• Leadership and guidance that contracted works meets all practical, commercial, requirements of productivity, quality and contract target completions.
• Supervise and coordinate the activities of construction contractors. Maintain daily supervisory surveillance checks and records ensuring that contractor’s management and supervision are providing safe working conditions and permitting procedures, all required competent personnel, protective equipment, adequate supervision and manpower, with reliable, well-maintained equipment to execute the contracted works as per contract schedule and targets.
• Routinely study, check and review all contractor scope as detailed in drawings, specifications and instructions, ensuring contractors proper interpretation and compliance with the lasted AFC drawings and specifications. Coordinating and clearing punch list
• Ensure proper change control by issuing Field Instructions for all changes, reviewing Site Queries to ensure responses are appropriate and practical and reviewing Advanced Revision notices prior to issue to contractors to ensure correct use of construction resources.
• Ensure contractors dimensional control methods for checking that the works are properly set out and supervise specialist surveying contractors where necessary.
• Ensure Quality inspectors and contractor supervisors carry out the witness, inspection and surveillance check in accordance with the Quality Plan and the requirements of the Quality Control Manager.
• Ensure that contractors are working in the required work areas, locations and elevations and that work sequence and interfaces with other contractors are both coordinated and planned to provide continuous working to meet contract schedules.
• Ensure that all construction materials, embedded items, special fixtures are approved for use and that they are stored, protected and available to workforce locations as required.
• Promote and maintain Customer and contractor best practice working relationships.
• Attend Contractor progress meetings as required.
Employment History
International work Experience - 19 years
Company Name
Job Title
Duration
Petrotech National Kuwait
Construction Manager
9/01/2020 till continue
wood Kuwait PMC services at LNGI project Kuwait
Electrical supervisor / Inspector (PMC)
07/07/2018 till 09/01/2020
NBTC Kuwait for JGSK CFP project KNPC & Petrofac KOC MGT project KOC
Electrical and Instrumentation Engineer
11/04/2017 to 01/07/2018
Access international Kuwait avenues mall & KDD new factory BMS security and access control system
Instrumentation Engineer
06/2016 to 07/ 04/2017
ABB Kuwait water distribution project Kuwait
Instrumentation and communication engineer
02/2013 to 05/ 2016
Kentech Dubai AND Kuwait
Naphtha Project at Dubai Port Enoc Jabal Ali Dubai
Electrical Foreman
03/2008 TO 08/2009
Senimedi Kurlys (Bechtel) Kazakhstan SGP TCO second Generation Refinery’s
Electrical Foreman
12/2006 to 09/2007
Areva / Comp sip Al Ali W.L.L Bahrain Alba line 4 and Bapco with Bechtel and Areva
Electrical Foreman
05/2004 TO 10/03/2006
Home country work Experience - 10 years
Company Name
Job Title
Duration
Krishna control Mumbai Airport air India workshop Mumbai India
Electrical Supervisor
08/08//2009 to 07/09/2012
Vidyut Engineering Nestle India Ltd Chocolate plant GOA India
Technician
From
02/2002 to 03/2004
Timblo (private) limited Mining GOA
Electrician
From
03/1995 to 12/2001
NANU ENTERPRISES GOA India
Electrician
From
03/1994 to 02/1995
Techno Engineering Corporation GOA India
Electrician
From
09/1993 To 03/1994
Employment work Summery
Wood’s Al - Zour LNG Import Project PMC team
Electrical construction as a member of Project Management Consultancy (PMC) team based in Kuwait, responsible for construction and completions delivery of KNPC’s LNG Import Project based in Al Zour . from 07/2018 TILL 01/2020 (under project compilation notice period)
Scope of work- As electrical construction supervisor
•Assigned permanently to the project as a key member
•Construction supervision and co-ordination of the work at site to maximize the effectiveness of construction delivery to time, budget and quality objectives
•Monitor, review and approve key construction documentation to support timely construction installation and completion
•Monitor progress and review construction installation and completions by the EPC Contractor at site
•Liaise with the EPC Contractor as required on behalf of KNPC and ensure assigned work is managed and delivered to KIPIC satisfaction
•Enhance and demonstrate commitment to raising HSE standards and propose new initiatives or improvements
•Provide leadership, guidance and direction concerning all facets of construction, completions and their delivery
•Review project studies and proposals for constructability and / or construction hazard identification
•Monitor and review the EPC Contractor’s and their Subcontractors construction activities including resourcing thereof
•Interface with KIPIC and the EPC Contractor for formal and informal reviews on construction and safety related matters
•Provide technical assistance to the construction supervision team and be responsible for site engineering activities
•Coordinate and resolve field construction queries interfacing with engineering and completions
•Assist in the review and approval of "sub - contractors" method statements
•Approve “as built “drawings and participate in key KNPC reviews and meetings
•Monitor, appraise and report to KNPC on quality and safety construction performed by the EPC Contractor and their Subcontractors / Vendors
NBTC Kuwait for JGSK CFP project KNPC & Petrofac KOC MGT project KOC
Scope of work -
• Power, control, signal, network, and FOC Cable pulling,Glanding, Termination, Instillation of panels, console . monitors,transformers,JBS, lighting and small power, switch gear, earthing, lightning protection, cathodic protection,instruments F&G, PAGA system,testing and commission activity .
Responsibility-Electrical and Instrumentation Engineer
•For planning monitoring execution controlling of work quality and quantity.
•Follow-up for free issue r materials and consumable materials to be available at site prior to start the work.
•studies drawing and Follow-up for latest revision prior to plan work forecast.
•Preparing red line markup and forwarding for approval as and when needed withing the project.
•Preparing monthly revenue plan,and monitoring on daily basis in order to track delay and constrains.
•co-ordinate with client for clearing punch list and documentation to compilation of work in time frame.
•Fully involved in training and recruitment of new team on board.
•Creating teams for specific task lead by supervisors and follow by foreman s as per task as required according to manpower histogram
• Pee-commission and commissioning support for client. And re- conciliation acclivity and turnover team.
Access international Kuwait avenues mall & KDD new factory BMS security and access control system From06/ 2016 to 04/2017
Scope of work -
•Installation of Cable tray, conduit, trunking,control, signal, network, and FOC Cable pulling,Glanding, Termination cable pulling Glanding and termination and testing for BMS and Car parking system
Responsibilities as instrumentation Engineer
Working as a site in charge for planning monitoring execution controlling of work quality and quantity.
•Follow-up for free issue r materials and consumable materials to be available at site prior to start the work.
•studies drawing and Follow-up for latest revision prior to plan work forecast.
•Preparing red line markup and forwarding for approval as and when needed withing the project.
•Preparing purchase order, invoice, technical quarries,RFI, RAM submission etc.
•Fully involved in training and recruitment of new team on board pre-commission and commissioning support for client
•Coordinating for inspection testing and commissioning of BMS. Car parking, power system etc. .
ABB Kuwait water distribution project Kentech Kuwait
Scope of work-
•Upgradation of existing water distribution center, pumping station, chemical plant, power and generator, transformers Substation operation water reservoir, automation etc. microwave system GPS system and server connectivity . construction of new station with all above system .
Responsibility AS Instrumentation and communication engineer
•Responsible for 22 site entire Kuwait for Fabrication Installation, design, commission, and co coordinating with client and subcontractor. Coordinating
•Site server, inspections, preparing as built drawing, coordinate other discipline drawing; to avoid clashes and rework at site .
•Preparing MSDS, RAM, WMS, JSA, lifting plan, weekly forecast, Verifying of Daily progress reports, RFI, ETC
•Follow-up-and monitor to achieve daily given task by subcontractors. Closing of punch list,
• Reviewing invoices submitting by client, time-sheets, measurement sheets,
•Supporting subcontractor and team member for temporary site facility establishment
•Commissioning and pre -commissioning activities for both Electrical an, instrumentation and communication system synchronizing ABB AC 800system with server 2012 and exerting system of mew
Kentech Kuwait
New 30” crude transit linetl-4- KNPC AGR - 4 project 16 bay- 132 kv subsection Shuaiba-generation (power & desalination) as E&I works equate LBP and utility heat tracing system.
Scope of work -
• Power, control, signal, network, and FOC Cable pulling,Glanding, Termination,Instillation of panels transformers, console . monitors Transmitters,JBS, lighting and small power, switch gear, earthing, lightning protection, cathodic protection,instruments F&G, PAGA system,testing and commission activity .
Responsibility AS Senior E&I supervisor
•Installing cables from 0.5mm2 to 400mm2, from 5 volts to 132kv. Power control signal network FOC etc.
•Fabrication and Installing Cable trays, conduits, junction, boxes panels tubing field instruments,light pole and fixtures camera etc.
•Overall, each and all works related electrical and instrumentation, Telecom, Cathodic protection CCTV etc.
•Arranging materials and maintain quality of work coordination with client and QA/QC, making inspection of jobs, and clearing all punch lists etc.
•Insulation and continuity test, loop check, leak test, hi pot function test etc.
•Assembling and installing of 132 kv/11kv transformer and GIS, NER, battery bank with ups
•coordinating and clearing punch list Cable Glanding and termination Installation,
•Installation, Testing & commissioning of heat tracing system
•final calibrations and sealing and as built etc. .control, training, preparing project submission documents such as RAM, JSA, MSDS, WMS, LIFTING PLAN, WPS, RA MDS ETC, very strong ability in from site temporary facility establishment till site closer.
•Verifying and submitting daily progress from site foremen.
Kentech Dubai
Naphtha Project at Dubai Port Enoc Jabal Ali Dubai
Scope of work -
• Power, control, signal, network, and FOC Cable pulling,Glanding, Termination,Instillation of panels transformers, JBS, lighting and small power, switch gear, earthing, lightning protection,
Responsibility AS Electrical Foreman
•Installing cables from 0.5mm2 to 400m m2, from 5 volts to 11kv. Power control signal network FOC etc.
•Fabrication and Installing Cable trays, conduits, junction, boxes panels tubing field instruments,light pole and fixtures camera etc.
•Overall, each and all works related electrical and instrumentation, Telecom, Cathodic protection CCTV etc.
•Arranging materials and maintain quality of work coordination with client and QA/QC, making inspection of jobs, and clearing all punch lists etc.
•Insulation and continuity test, loop check, leak test, hi pot function test etc.
•coordinating and clearing punch list and also work at Dubai dry dock with Riggs shut down work preparing as-built drawings.
Senimedi Kurlys (Bechtel) Kazakhstan
SGP TCO second Generation Refinery NEW PROJECT
Scope of work -
•Installation, Testing & commissioning of heat tracing system like thermostat JB.DB, Heating cables, power cables,
Responsibility AS E&I electrical Foreman
•coordinating and clearing punch list at crud gas and Sulphur power and utility area
•re installing of post-positions, temperature elements, and transmitter s after final calibrations and sealing after completion of mechanical testing work,
•LV Cable pulling,Glanding, Termination .
•Instillation of panels transformers,JBS, lighting and small power, switch gear, earthing, lightning protection .
•Installation and testing of heat tracing cables and components .
• Preparing material request .RFI and daily Reports and reporting top supervisor.
Areva / Comp sip Al Ali W.L.L Bahrain
Alba line 4 and Bapco with Bechtel and Areva
Scope of work -
• Construction of ALBA port-line, and cast house, ministry of electricity and water supply for scads and water distillation plant, HIDD Power plant, and BAPCO Refinery. Maintenance work of all E&I system at Bapco refinery cuff well area and ship unloading jetty.
Responsibility AS Electrical Foreman
•Fabrication and installation of cable tray conduits support frames etc.
• Installation of field instruments, JB, Sensors, Transmitters,Gauges, Panel boards, UPS, Battery racks, etc.
•Replacing of old (MCC) and a communication serviceable project for jetty,
•Installation of transformers panels cable tray conduits cable pulling Glanding and termination loop checking cad welding grounding etc.
•Installation of PAGA and Telecom system
•coordinating with vendor for installation and commissioning of packaging line and robot operation
Krishna control Mumbai
Airport air India workshop Mumbai India
Scope of work -
• Maintenance, up-gradations and attending Break -down works related to electrical and automation
Responsibility AS Electrical Supervisor
•Working as a night shift supervisor for maintenance up-gradations,shut-down
•Attending breakdown of all electrical and automation system such as generator ups lighting CCTV, Fire and Gas PAGA Signal system conveyors,waste management system WWTP
•Routine maintenance of switch-gears, Generators, lighting system and motors, and starters
Vidyut Engineering
Nestle India Ltd Chocolate plant GOA India
Scope of work -
•Maintenance, small projects and attending Break -down work related to electrical and automation
Responsibility as Technician
•Attending shift breakdowns in fully automatic PLC operating plant chocolates plant, boilers, refrigeration. Air compressor. firefighting equipment’s, 33KV sub- station, pneumatic systems, chiller plant, cooling tower,. Waste water treatment plant, pumps and motors, valves etc.
•Parameters setting and reprogramming of and frequency drives controllers,PLC,smart controller codding machines and printers etc.
•Maintenance and attending breakdowns of forklift and all battery-operated devices.
Timblo (private) limited Mining GOA
Scope of work
•Handling shifts breakdowns at Tran shipper and mining beatification plant and construction of new plant.
Responsibility AS Electrician
•Handling shifts breakdowns at Tran shipper and mining beatification plant.
•Electrical and mechanical maintenance of water pumps, & motors (up to 150hp), mechanically and electrically welding transformers,, grinders, drilling machines, power generator (up to 1200KV), power sup-station’s (up to 11KV/ 1000KVA) servicing of over-headline work & also
•auto-electrical works of excavator wheel loader, dozer, heavy vehicles etc.
NANU ENTERPRISES GOA India
Scope of work AS Electrician
•Manufacturing of switch gear panels, MCC control panels, system panels, control desk, mimic, ATS Panel's .
Responsibility
•Internal wiring, component assembling, of switch gear panels, MCC control panels, system panels, control desk, mimic, ATS Panel's etc.
•coordinating and clearing punch list testing, allocations. FAT SAT etc.
•Testing commissioning, under warranty services, field modification as required.
Techno Engineering Corporation GOA India
Scope of work
•Tray work and cable pulling Glanding and termination Mining Bonification plant construction project
Responsibility Electrician
•Assisting fitters and electricians for cable tray fixing, conduit fixing, cable pulling Glanding and Termination
Education qualification
2012 DEGREE Electrical engineering from Rastriya Vishva Vidyapeeth Mumbai
1993 Diploma Electronics and communication from Jamia Peer Mohamed University Hyderabad
1991 Basic Computer Basic Computer from Adliz computer canter Goa
1990 HSSLC H.S.C (Commerce) From Goa board of higher secondary school
1988 SSLC Basic Computer Goa board of higher secondary school
Other courses and training
2008 worker relationship training
2015 PMP Training
2015 Comp ex Training
Languages known
1. English: Read, write, and Speak
2. Hindi: Read, write, and Speak
3. Marathi: Read, write, and Speak
4. Konkani: Read, write, and Speak
5. Arabic: Speak
6. Russian: Speak
PERSONAL DETAILS
Passport Driving License
A)Passport no - Z3811305 A Light and Medium Motor driving from - INDIA
B) Passport expire date - 09/01/2027 B) Light And medium Motor driving from - Kuwait
C)Passport issue place - Kuwait
Permanent residence Address PRESENT DRESS
H NO 199 BAZARWADA
COLLEM SOUTH GOA
INDIA 403410 BUILDING NO 77
PHONE NO - 009*********** 5 FLOOR FLAT NO 10
009*********** PHONE NO - 009**********