Post Job Free

Resume

Sign in

Quality Control Project Management

Location:
Cape Coral, FL
Posted:
March 18, 2024

Contact this candidate

Resume:

Theodore F Young

Cape Coral Fl *****-352-***-****

ad4e3q@r.postjobfree.com

OSP Operations/Management/Engineering/Field

Inspection/Quality Control

•25 years of OSP construction experience

•10 years of project management experience

•Leading by example and ensuring the execution of all safety, quality and department policies

•Well versed in the installation of aerial and underground copper and fiber facilities

•Working with municipalities on permitting and locates

•Attending meetings to ensure progress and coordination is achieved.

•Willing to travel where needed.

Frontier Communications/Local Manager, Venice, FL March 2021 to February 2024

•Responsible for daily work completion of customer service orders and trouble tickets, assist technicians with making on site and moving work to maximize productivity

•Responsible for cable maintenance of 300’ or less which includes isolating damage, creating work orders for repairs and following up with all company and contract crews to completion.

•Perform field visits to check the quality of the techs work and meet with customers to ensure the delivery of a good product.

•Check with technicians on a regular basis on the importance of safety. Making sure they have all the tools they need to work safely and efficiently. Conduct weekly meetings to discuss any concerns the team might have.

•In contact with customers to assist them with issues they may be experiencing, this information is shared with technicians, so they stay informed.

•Responsible for meeting with municipalities to share any concerns they have about our plant or any repairs we might be making in the field.

•Working with departments like air pressure, construction and the CO, so we can understand the scope of work and complete it safely and efficiently.

Crown Castle Fiber through Broad Staff Inc.

February 2019 to March 2021

Construction Manager

•In charge of managing Contractors in day-to-day work activities including placement of fiber optic facilities, cable, vaults and manhole systems. We had to make decisions on roadblocks as we encountered them and adjust accordingly.

•Responsible for working with all municipalities in coordinating jobs, reviewing prints, permitting, restoration and closing work orders.

•My responsibilities also included reviewing red lines for accuracy auditing and inventory.

•I worked with locators to get an accurate read of existing facilities as well as updated information on newly placed plant.

•Attended on-site meetings with vendors as well as weekly meetings with all parties involved in the project via Teams and Webex.

•Included in my job responsibilities were verifying duct systems, cable sizes, tracer wire, coils and closures.

Mastec Utilities

Ft Myers Fl July 2018 to February 2019

Construction Supervisor

•Reviewed prints with foreman, visited job sites, did pre job walkouts to determine any potential issues.

•Oversaw outside plant construction, aerial and buried.

•Report necessary changes to jobs that required updates for billing and records.

•Handout daily assignments and coordinate with crew foreman.

•Complete as-built prints and compare them with the field notes and material used to gain an overall picture to accurately place them in the records.

•Performed inventory on tools and materials to reduce unnecessary expenditures.

•In charge of permitting with state, county and city utility officials as well as other utilities.

•Assisted in safety checks on company vehicles and other equipment.

•Inspect job sites to determine where to start an activity such as setting up a bore rig, whether it can be trenched or plowed. Mark the intended path with paint. Call in locates to establish a running line. Attend meetings to keep our customers informed of our progress and to hear any future concerns.

10. Keep an accurate spread sheet of all activity up to date.

11. Promote a good work environment.

CenturyLink

May 2014 to June 2018/Construction Project Administrator

Ft Myers, FL

•In charge of OSP and ISP commitments. This included cell tower sites, power stations determining the zone of influence and fiber placement.

•We did construction billing, reviewed invoices and prepared CIPs to cover any charges deemed legitimate for additional pay out.

•Worked with engineering team on existing and new construction jobs to get any potential issues resolved early.

•Worked with contractors, maintenance and company employees in all facets of field work as well as internal matters such as changing records to reflect actual facilities and get the billing corrected.

•Required a call if something in the field changed and needed addressed, changes to prints and billing were always reviewed.

CenturyLink

February 2003 to May 2014/OSP Engineer III

Ocala, Fl

•Designed copper and fiber routes for our facilities, performed field responsibilities such as measuring spans, determined projected running lines and built jobs in our database.

•Met with construction crews in the field to discuss any concerns or roadblocks. Handled ROW permits and any municipality concerns.

•I worked in many databases such as Fireworks, Bid master and NDS.

•Performed fiber route site surveys and determined where fiber cabinets or cross connect boxes might need placed.

•Worked on road jobs doing the RGB’s to show the road developer where our plant is and will be. What will be moved or abandoned.

•Worked on FTTH and business fiber also.

•Assisted on greenfield and brownfield jobs.

REFERENCES

Jim Nottingham/239-***-****/Consultant Peirce Communications

George Moura/239-***-****/Lee County FL Deputy Sheriff

Lester Holland/239-***-****/Supervisor IRBI Utility Contractor

Todd Sailor/239-***-****/Project Manager Team Fishel

Matt Donoghue/941-***-****/Technician-Repair Frontier Communications

Chuck Ferguson/570-***-****/Construction Manager Crown Castle Fiber

Jeff Holt/239-***-****/Supervisor I-2 Solutions

Michael Garrison/407-***-****/Project Manager Crown Castle Fiber

Elio Viera/239-***-****/Construction Manager Crown Castle Fiber

Mary Bowen/954-***-****/Verizon Field Manager

Ralph Ellingsen/941-***-****/Frontier Communications THC Technician



Contact this candidate