Post Job Free

Resume

Sign in

Fiber Optic Technical Staff

Location:
Canada Bay, NSW, Australia
Salary:
1500 US Dollar
Posted:
March 12, 2024

Contact this candidate

Resume:

GUILJULYN E. BANEZ

Aguinaldo Hi-way Cor. Guevarra

Ext. Dasmarinas Cavite

Philippines 4114

Cel # +639*********

Email Add: ad4abj@r.postjobfree.com

OBJECTIVE:

To be employed as a technical staff in a telecommunication or other related industry, where I can utilize my working experience and knowledge.

EMPLOYMENT HISTORY:

2019-Present Converge MetroWorks Ict Const. Inc. Fiber Technician

2015-2019 Oman Fiber Optic (S.A.O.G.) Fiber & Copper Technician

Sultanate of Oman

2009-2014 First Telecom Industries Site Surveyor & Network Tech.

P.O. BOX 431, RIYADH 11383 K.S.A

2005-2008 Safari Co. Ltd Fiber & Copper Technician P.O.BOX 7710, RIYADH 11472 K.S. A.

2002-2004 Al-Habib Trading and Cont. Co. Fiber & Copper Technician

P.O. BOX 5688, Dammam 31432

2000-2002 Issam Kabbani and Partners Fiber & Copper Technician P.O. Box 6897 Dammam 13452 K.S.A.

Second Telephone Line Project Dhahran Aramco

1999-2000 Al-Dhary International Group Fiber & Copper Technician

Jarir st. Malaz Riyadh, K.S.A

1997-1999 National Telecom Co. Ltd Fiber & Copper Technician

P.O.B.O.X.9260 Riyadh 11413 K.S.A

Project Tep -6 Lucent Technologies

1995-1996 Zueitina Oil Company Fiber & Copper Technician

Tripoli Libya

1993-1995 Al-Suwaidi Abqaiq Fiber & Copper Technician

1989-1992 Nadec, Riyadh KSA Telephone Maintenance

1984-1988 Phil net Ericsson, Pasig Fiber & Copper Technician

JOB DESCRIPTION:

Installation of ODF RACK,ODF and ODB(Optical Distribution Frame/Optical Distribution

Box)

Splicing and Termination of Fiber Optic Cables

Testing and Rectification of Fiber Optic Cables

Testing and Splicing Equipment Test

Fujikura Fusion Machine FSM 50S

Fujikura Cutter CT30

Expo Power Meter

Expo Light Source

Fujikura Fiber Identifier

Work in FTTH Project in Riyadh

Verify & Clean all ducts to be used

Place joints as shown in plan

10M.Min Provision is of cable from each end for FATS

2.0M. used to calculate F.O.C length for racking cable

Coordinate with engineering Dept. if any deviation

All F.O. drop cable to each villa shall be 2F

All Fiber in MH & HH to be tagged

All Fiber Optic cables to be laid in sub duct except 2F drop

All TBS to be connectorised

All cables passive equipments and accessories must be pre-approved by STC

All Fiber strand will not be cut as every FAT until and unless it is necessary

All Cables Closures TBS FDT, etc. to be tagged and label properly

All FOC should comply with ITU-T 6520 recommend Visible RED light to identify Fiber or Fault

Termination Works On Primary and Secondary Under Ground Cable.

Cable Jointing Works and Manholes Cable Vaults MDF

Test of Cables For Continuity, Insulation etc And Performs Corrective Measures and Repairs

Connection and Closure Cable Joints On Jelly Filled Pressurized Cable (300Prs. To 2400 Prs) Using Xaga Product Such as Modular Connectors 10 Prs, Pica bond, Ur and Uy Connector with E-9-Y Crimping Tools MR 1and MS 2.

Install Various Telecom Peripherals Such as pillar Distribution Point, Subscriber Terminal

Box Terminal Block and Wall DP.

Perform Trouble Shooting and Repair When Deficiencies May Occur.

Making of Joints Enclosed Using Shrinkable and Dome Type Closure.

Termination Works of Primary and Secondary Cables into Cabinet Crone Type and Ericsson Type.

Work in Telephone Exchange Identifying Cable Pairs.

Placing R 66 M Block 100 Pairs 50 Pairs.

Trouble Shooting Using handset, Tone Generator, Tracer Dynatel and Fault Locator.

Numeration of Cable Pairs. Placing Pillar DP Pedestal.

Closing Splices Using Performed Closure with End Plate Cutter.

Replacing On Pedestal and in Underground Telephone Cable Due to Corrosion.

Installed The 1059 Protector and Transferring and Indoor Cable Termination to the Pedestal.

Rehabilitation of Pedestal, Corroded Cable, Re-Stenciling.

>Site Survey for Indoor & Outdoor site for installation of AP’s (Aruba Network)

>Installing & laying of Network cables with juniper equipment

>Repairing & troubleshooting of ATM machine

>Installation and repairing and troubleshooting of CCTV

>VDSL Repairing & troubleshooting FDT to Exchange

>Put the cisco equipment to cabinet

>Draw the SED (Site Engineering Drawing) and Cisco cabinet

>Install 1xMX480 router and ODF patch panel

>Install the power and data cabling

>Patching and labeling of data cabling

>Installation of cabinet and mini link equipment 2G,3G and LTE Site preparing

>2G,3G and LTE sites for PATT testing VSWR using the site master troubleshoot and

> clearance of alarms with the NOC 3rd carrier Migration Swapping of 2G and 3G

> equipment working knowledge of Telecom dc power plants product of skill set.

>FTTH Installation and Configuration

>CISCO Switches and Routers Installation and configuration

> JUNIPER Routers Installation

>Testing for Configuration & browsing

>Testing for ports synchronization & Continuity

>Responsible of Preliminary Acceptance Test (PAT) & Final Acceptance test (FAT)

> Fiber cable testing (ODF)-patch code

>Dark Fiber Cable Testing.

>Integration of equipment with DNOC (Data Network Operation Control-Riyadh)

>Conducts Maintenance down Time (MDT)

> Installation of MDF (Main Distribution Frame)

> Installation of ODF (Optical Distribution Frame)

EDUCATION:

>1970 – 1975 Rafael Palma Elementary Schools Elementary

Metro, Manila

>1976 – 1979 Manila High School High School

Intramuros Manila

>1980 – 1982 Tech. Inst. Of Philippines College

Metro, Manila

Course Draftsman

PERSONAL INFORMATION:

>Nationality :

Filipino

>Birth D :

August 14, 1962

>Place of Birth :

Manila

>Weight :

68 Lbs.

>Height :

5”5’

>Religion :

Roman Catholic

>Civil Status :

Married

>Name of Spouse :

Raquel E.Banez

>Name of Children :

Jorenz E.Banez

Justine E.Banez

>Father’s Name :

Guillermo A Banez

>Mother’s Name :

Erlinda E.Banez

>Language Spoken :

Filipino, English, Arabic



Contact this candidate