RICARDO BARRERA
E l e c t r i c i a n
CONTACTS
Phone Number:
Email:
ad44pi@r.postjobfree.com
Address:
*** ***** **, ****, *****, TX, United States, 75227 apt 9138
SKILLS
AC/DC Power and Control Systems
Electrical Safety Lock Out-Tag Out Procedures Blueprint Reading Layout Planning Project Management
General Knowledge of TIA Portal (PLC)
CERTIFICATION S
Scissor lift. Forklift.
OSHA-30.
Silica.
Fall protection. LOTO.
SDS.
ABOUT ME
I'm an asset with a strong background in electromechanics, with four years of experience in construction and conveyor systems. I will apply my technical and field experience in a professional and focused way together with the work team to ensure the success of the objectives set.
WORK EXPERIENCE
ELECTRICIAN
JCK USA / Newville, PA / May 2023 - Jul 2023
Worked for KNAPP AG & ISS Automation at Geodis (Disney).
•Group leader and work supervision
•Installation of all the devices of conveyor and sorter systems (power supply, disconnect, vfd's, scanners, encoders, e-stops, etc.).
•Internet installation using profinet cables.
•Running and termination of AS-i and AUX cables.
•Integration of all modules (G20 & G10) of the conveyor belt on AS-i cable and SUP cables.
•Air station assembly and connection for conveyor systems.
•E-stop installation and termination.
•Motor assembly and electrical termination.
•Assembly and installation of cable trays and wire channels.
•Installed cables, conductors and wire trays and completed necessary hook-ups for primary power lines.
•Worked extensively on three-phase, 277/480-volt power distribution systems.
•Interpreted schematics, blueprints and diagrams to complete projects on time.
•Interpreted blueprints and technical drawings to correctly assemble main panels, sub-panels and control boxes.
ELECTRICIAN
JCK USA / Greencastle, PA / Mar 2023 - May 2023
Worked for KNAPP AG & ISS Automation at NG2 Walmart’s fulfillment centers.
•Installation of all the devices of conveyor and sorter systems (power supply, disconnect, vfd's, scanners, encoders, e-stops, etc.).
•Internet installation using profinet cables.
•Running and termination of AS-i and AUX cables.
•Integration of all modules (G20 & G10) of the conveyor belt on AS-i cable and SUP cables.
•Air station assembly and connection for conveyor systems.
•E-stop installation and termination.
•Motor assembly and electrical termination.
•Assembly and installation of cable trays and wire channels.
•Installed cables, conductors and wire trays and completed necessary hook-ups for primary power lines.
•Worked extensively on three-phase, 277/480-volt power distribution systems.
EDUCATION
Business Administration
Venezuela & Universidad Rafael Belloso
2016
LANGUAGES
Spanish, English
•Interpreted schematics, blueprints and diagrams to complete projects on time.
•Interpreted blueprints and technical drawings to correctly assemble main panels, sub-panels and control boxes.
ELECTRICIAN
JCK USA / Lancaster, TX / Jul 2022 - Mar 2023
Worked for KNAPP AG & ISS Automation at NG3 Walmart’s fulfillment centers.
•Installation of all the devices of conveyor and sorter systems (power supply, disconnect, vfd's, scanners, encoders, e-stops, etc.).
•Internet installation using profinet cables.
•Running and termination of AS-i and AUX cables.
•Integration of all modules (G20 & G10) of the conveyor belt on AS-i cable and SUP cables.
•Air station assembly and connection for conveyor systems.
•E-stop installation and termination.
•Motor assembly and electrical termination.
•Assembly and installation of cable trays and wire channels.
•Installed cables, conductors and wire trays and completed necessary hook-ups for primary power lines.
•Worked extensively on three-phase, 277/480-volt power distribution systems.
•Interpreted schematics, blueprints and diagrams to complete projects on time.
•Interpreted blueprints and technical drawings to correctly assemble main panels, sub-panels and control boxes.
MECHANICAL INSTALLER
JCK USA / Moreno Valley, CA / Jul 2021 - Jan 2022 Worked for KNAPP AG at Skechers warehouse.
•Conveyor belts installation for KNAPP.
•Alignment and leveling of conveyor belts.
•Installation, leveling, anchorage of lifts (elevators) on the racks.
•Installation of box shuttles system into the rails of the racks.
•Layout on the floor for all the conveyor belts.
•Installation of fence and band on the side of the conveyors.
REFERENCES
RENDA OJEDA
General supervisor at jck USA
T: 407-***-****
FRANCISCO ARMADO
OSR Supervisor at JCK USA
T: 407-***-****
HERMAN GULARTE
Floor Supervisor at JCK USA
T: 720-***-****