Post Job Free

Resume

Sign in

Preventive Maintenance Overhead Crane

Location:
Talavera, Nueva Ecija, Philippines
Posted:
February 26, 2024

Contact this candidate

Resume:

ENRIQUE POBLETE DELA ROSA

Address : #***, ******, *** ****, *****, Bataan 2113 Philippines

Mobile No. : 098********

Email : ad3xqk@r.postjobfree.com

Passport # : P8193861A

Expiry Date: 01 Aug 2028

CAREER OBJECTIVE

To get an opportunity where I can make the best of my potential and contribute to the organization's growth. Seeking a full-time position in your company where I can launch my career and build a valuable skill set.

SPECIAL SKILLS

Electrical Layout

Iron Works Fabrication

Welding Jobs

Concrete and Metal Painting

Masonry

WORK EXPERIENCE

ELECTRICIAN Sept. 2009 – Present

Arab Drilling and Workover Company ADWOC 103A Base, Masa Elbrega, Libya

Contact Person: Salbador Reyes

Duties and Responsibilities:

Operation and maintenance utilities department

Shutdown rig unit that needs to be restored and repaired

Check all status conditions of rig generators, mini-camp generators and main camp generators

Check all MCC room panels, stop/start control and circuit breaker conditions

Preventive maintenance for all AC motor winding and bearing, and testing with power whether it needs a change of bearing

Check all existing core cable in their insulation, size capacity and its plugs

Install new trunking or conduit following wiring installation, feeder to hoffman box with bus bar or main distribution panel, feeder line to/for kitchen, laundry, sleeping rm.

Responsible for computing the ampacity of wire circuit breaker rating, and the load unit

Yard responsible, preventive maintenance for generator air compressor, overhead crane, and AC units, hand tools and machines, and troubleshooting.

ELECTRICAL HEAD MAINTENANCE May 2000 – Mar. 2009

Tomas del Rosario College Balanga, Bataan

Duties and Responsibilities:

All emergency trouble needed concerned in electrical shall be responded urgently.

Standby generator should always be in good condition, checking gear oil level and all gauge accessories and monitoring engine conditions, ensuring that the output voltage or cycle reading in required balance for when the local power company cause unexpected power failures.

Constant monitoring for the fluctuation of the supplied power to the secondary output in the current transformer.

All H2O pump motor units should be monitored and maintained in good condition and repaired if required.

Repairs of convenience outlet, air condition outlet, special purpose outlet, and any other that requires electric power supply.

Ensures that Fire Alarm System and Emergency Lights are prepared and in working condition.

Responsible for Electric Wiring System and even the Mechanical System Control.

Maintenance of all fan blowers; to repair or request new units if needed.

Construct load computation estimates and required electric materials bill if an additional load is needed.

Design an electrical plan in request of new transformer service including entrance wire, feeder wire, panel board mounting and branches, indicating if it is single phase or 3 phase secondary side.

Terminating feeder wire to main distribution and emergency main breaker to generator output terminal lugs.

Fabricating wire gutter, panel board, support branches, and cable tray.

LEADMAN BUILDING ELECTRICIAN Oct. 1989 – Dec. 1995

RBP Electrical Service Makati City, Metro Manila

Duties and Responsibilities:

Implement supervision and safety precaution before working.

Handling a copy of electrical plan from building permit.

Piping layout or conduit depend on rise building progress.

Lighting layout, power layout, auxiliary layout, telephone and TV cable.

Feeder piping layout if possible to install.

Clearly inform any personnel assigned on main distribution and electrical room.

Wiring after piping layout has been completed.

Installation of light fixtures and panel board mounting.

Terminating of feeder line and circuit branches.

Completion of project depends to as-built plan.

PERSONAL INFORMATION

Date of Birth : January 10, 1968

Place of Birth : Samal, Bataan

Civil Status : Married

Citizenship : Filipino

Religion : Roman Catholic

Height : 5’8

Weight : 60kg

Language Spoken : English, Filipino

Name of Spouse : Maria Bella A. Dela Rosa

Number of Children : 4

Name of Children : Ma. Elisha A. Dela Rosa

John Matthew A. Dela Rosa

Mark Joseph A. Dela Rosa

Hannah Grace A Dela Rosa

EDUCATIONAL ATTAINMENT

Tertiary : Technological Institute of the Philippines

Certificate in Marine Engineering

Manila

1991 – 1993

Bataan Educational Institution

Electrical Power Technology

Orani, Bataan

1985 – 1988

Secondary : Saint Catherine of Siena Academy

Samal, Bataan

1981 – 1985

Primary : Samal North Elementary School

Samal, Bataan

1975 – 1981

TRAININGS ATTENDED

On-the-Job Training Instrumentation and Control

National Power Corporation

Bataan Thermal Powerplant

Limay, Bataan

April 11, 1998 – May 11, 1998

TRAINING COURSES

oFire and Safety

oCustomer Relation

oEarthquake Drill Training

PERSON TO BE NOTIFIED IN CASE OF EMERGENCY:

Name : Maria Bella A. Dela Rosa

Address : 421 Banlic, San Juan, Samal, Bataan 2113 Philippines

Contact No. : 090********

Relation : Wife

CHARACTER REFERENCES

Mr. Reynaldo Hualda Electrical Supervisor RBPoblete Makati, Manila

Rev. Gie Tuazon Church Pastor, Kingdom of God Lalawigan, Samal, Bataan

Miss Alma Poblete School Principal Samal, Bataan

SSS No. : 02-1105197-4

TIN No. : 928-808-767

Pag-ibig No. : 9112530

I HEREBY CERTIFY THAT ALL INFORMATION CONTAINED HERE INTO THE BEST OF MY KNOWLEDGE IS TRUE AND CORRECT.

Enrique P. Dela Rosa

Applicant



Contact this candidate