** **** ***** ** ********** in construction of oil and gas (upstream, midstream, and downstream), refining, petrochemical,
industrial chemical facilities and paper mills. Accustomed to assuming total responsibility for large, complex civil, mechanical,
structural, piping, electrical installations. Proven record as an effective manager of direct hire craft personnel. Routinely handles the
heavy responsibilities associated with construction projects, including safety, supervision of trades, materials coordination, quality,
and scheduling. As a project manager or construction manager, the total responsibility for safety, construction and management of
the work performed including coordinating and monitoring all direct hire and subcontractor activities, supervision of field
construction personnel and the implementation and support of execution plans, such as mobilization and startup, as required to
ensure adherence to the project schedule. Additionally, responsible for maintenance of the schedule and budgets, conformance to
contractual requirements, continuous monitoring of the projects with respect to relations and the quality of the work.
PERSONAL
Plan, coordinate, and execute projects from start to finish, keeping the safety of all personnel in mind in every plan, decision and
action made. Accurately analyze and measure project completion against schedules and budgets. Adjust work forces, resources and
production efforts to meet or exceed schedules and budgets. Know and understand client's needs, wants and expectations at the
beginning of a project and documenting change as it relates to cost and schedule. I lead by example and expect all team members to
be responsible and accountable for their actions and commitments.
PROFESSIONAL EXPERIENCE:
Evergreen Packaging, Canton NC
Now)
Construction/Project Manager
(June 2020 –
Responsible for complete construction of $17-million-dollar project including engineering, civil, structural, piping, electrical,
instruments and programming.
Manage multiple capital projects throughout the mill.
Goals of the White Liquor Optimization Project are improving the operations of the Causticizing and Lime Kiln areas with a cost
savings of $25000 per month.
Nutrien, Lima OH
Construction Manager/Coordinator
(Jan 2019 – May 2020)
•
Responsible for directing, overseeing and providing support on multiple capital projects (most projects are in the 2MM range),
between 2 and 4 at a time from concept to completion. Many different projects completed throughout the plant within all sectors,
infrastructure, utilities, and process. Developed work scope, project documentation, drawings, etc. that meet company
standards/good engineering practice, and regulatory requirements. Handling contractual issues, conflicts and making sure safety
compliance is adhered to. AS ALWAYS---SAFETY FIRST. Appropriate and timely reporting of project progress up to and including
project closeouts.
Austin Ind.
General Superintendent
Freeport, Texas
(Aug. 2018-Dec. 2018)
•
Managed all civil activities and setting of all equipment, including, cold box(cryogenic services)oxygen tower, argon tower,
pre-purifiers, process towers, process skids, pipe modules and storage vessels. Assisted in managing all phases of project
and safety.
$15 million New Construction
•
KBR Agrium(UREA) Lone Star Project
April 2017)
(Sept.2016-
KBR Construction Supervisor
Borger, Texas
•
Managed 150 craftsmen for the fabrication and installation of all piping including underground and above ground
process, utility, and steam pipe for construction.
Signing off on piping test packages and assisting in commissioning phase.
$800 Million New Construction Urea Expansion
•
•
LyonDellBasell CCO Debottleneck Turnaround
LYB Construction Coordinator
Corpus Christi, Texas
(Jan.2016- July 2016)
•
Administer contractor performance for all projects and ensure compliance to all agreements and assist in various new and
rebuild projects.
•
•
Coordinate all construction activities for major contractor (Turner Ind.)
Manage multiple construction projects at one given time and prepare construction progress reports for all projects on
everyday basis and manage all communication with contractors and project manager.
Collaborate with other construction managers and resolve all queries for construction progress and ensure compliance to all
safety procedures at site.
•
•
Prepare various documents for all implementation of activities and ensure approval for same and assist to distribute all final
documents.
•
•
Participate in various project meetings and maintain records of all construction dates and project costs.
Assist project manager and prepare schedule for all projects and assist in close out process and ensure appropriate filing of
all paperwork.
•
$1.2 Billion De-Bottleneck Expansion
Cital USA
Project Manager
Corpus Christi, Texas
(June 2015- Jan.2016)
•
•
•
•
•
Defined the scope of the project in collaboration with senior management.
Created a detailed work plan, which identified and sequenced the activities needed to successfully complete the project.
Determined the resources (time, money, equipment, etc.) required to complete the project.
Developed a schedule for project completion that effectively allocated the resources to the activities.
Reviewed the project schedule with senior management and all other staff that will be affected by the project activities,
revised the schedule as required.
•
•
Determined the objectives and measures upon which the project will be evaluated at its completion.
$32 million (carbon steel and duplex tanks) New Construction
Cubit Contracting
Construction Manager
Corpus Christi, Texas
Commercial Projects ranging from $700 thousand to $13 million.
(Feb.2015-June 2015)
(Mar.2013-Jan.2015)
•
•
Determined the resources (time, money, equipment, etc.) required to complete the projects.
Developed a schedule for project completion that effectively allocated the resources to the activities.
CB&I
Construction Manager
Cartagena, Colombia- Reficar
•
Management responsibilities include client relations, direct project control, scheduling and cost management, contract
review, input to contract and implementation.
•
Responsible for the administration of all contract requirements and implementation as well as administration of sub-
contractor activities to fulfill contract requirements, monitoring and enforcing company and safety policies and procedures,
monitoring quality of installation as well as managing and directing various craft tradesmen.
Responsible for writing and implementing piping hydro testing program (punch package included Iso's, Ortho's, P&ID's) to
ensure quality workmanship completed to design specifications.
•
•
Responsible for all hydro and pneumatic testing within grass roots expansion. This performed in the construction of a grass
roots expansion of existing Ecopotrol Refinery.
Integrated Crude Vacuum, Saturated Gas, Butamer and Fuel Gas units. Capacity 150,000 bpd unit.
•
PCL
Piping Superintendent
(2012-2013)
Freeport TX.-DOW Chem.
•
Responsible for all steel and pipe fabrication and erection of expansion project. Working collaboratively with project owners,
client representatives, and internal senior management on ensuring project progress.
•
Establishing basic work plans for engineering, procurement, project control, construction planning, commissioning, and QA
in line with the client expectations.
New Construction Expansion for Samsung
•
COI
Construction Superintendent
San Antonio, TX.-Kelly AFB
(2010-2012)
•
•
•
Overseeing all pipe fabrication and installation for Air Force Cyber Command. Assist in design of mechanical rooms,
electrical rooms, hydronic piping, chillers and compressors, generators, buffer tanks, and handlers.
Verified setting of all equipment per engineered drawing. Assisting in Control and Balance of dual systems and
commissioning.
Estimating various piping drawings for future work.
Mustang General Contractors
(2008-2010)
Construction Manager
San Antonio, TX.
•
Management responsibilities include client relations, direct project control, scheduling and cost management, contract
review, input to contract and implementation.
•
Responsible for the administration of all contract requirements and implementation as well as administration of sub-
contractor activities to fulfill contract requirements, monitoring and enforcing company and safety policies and procedures,
monitoring quality of installation as well as managing and directing various craft tradesmen.
(2006-2008)
TDI
General Supervisor
Piping Round Rock, TX.
•
•
Responsible for all steel and pipe fabrication and erection of multiple projects simultaneously.
Working collaboratively with project owners, client representatives, and internal senior management on ensuring project
progress.
Establishing basic work plans for engineering, procurement, project control, construction planning, commissioning, and QA
in line with the client expectations.
•
Dynamic Solutions Inc.
•
(2003-2006)
Research and Development (Partial Owner) Inventing and developing a freestanding fluid measurement unit for the oil and
gas industry.
•
•
Responsible for all fabrication involving all stainless piping and tubing using GTAW welding process.
Project was completed and we hold three patents on the units. I am on the Board and actively hold shares of the company.
ABB Lummus Global
QA/QC Supervisor
Norco, LA.
(1999-2001)
•
•
•
Responsible for quality and installation of a Gas Cracking Furnace capable of processing an Ethane feed of 65,000-lb/hr and
operational flexibility to handle two additional hydrogen rich paraffinic dry gases (100,000-lb/hr)
Managing all non-destructive examinations, testing and certification of welders, setting and alignment of equipment,
maintain control of material handling and tracking.
Overseeing all sub-contract work including installation of electrical wiring and trays, installing all ATS transformers and
disconnects, all instruments, tubing, data and fiber optic cable, setting of all equipment, setting up radiographic and heat
treatment sub- contractors. Installation of all insulation.
•
•
Maintaining quality workmanship with strict attention to design and client needs.
Overseeing all pipe fabrication and installation for Air Force Cyber Command. Assist in design of mechanical rooms,
electrical rooms, hydronic piping, chillers and compressors, generators, buffer tanks, and handlers.
Verified setting of all equipment per engineered drawing. Assisting in Control and Balance of dual systems and
commissioning.
•
•
Estimating various piping drawings for future work.
A&B Builders Inc. QC Supervisor
Exxon-Debottlenecking Mobile-Train
Valero-Alkie Unit
(1997-2003)
•
Developed and maintained all associated up to date documentation to be used in governing on site audits, conducted
reviews and acceptance of quality procedures, shop surveillance, welder testing program, hydro-test package program and
final systems turnover. Developed weld-tracking systems for various projects.
.ABB Lummus Global
(1996-1997)
Area Superintendent
Westlake, LA.
•
Responsible for writing and implementing piping punch program (punch package included Iso's, Ortho's, P&ID's) to ensure
quality workmanship completed to design specifications.
•
Responsible for all P&ID walk downs, hydro and pneumatic testing with schedule impact. This performed in the construction
of a 1.1 BPA ethylene unit with 5 Lummus SRT III cracking furnaces and associated equipment.
EDUCATION AND TRAINING
CQM Management, N. Florida University
SAP Project Management
Contract Services Administrations and Reporting
Sexual Harassment Training
Radiographic Film Interpretation Course
Visual Inspection Course
Haz-Mat Training
OSHA 10 Training
Safety Awareness Training Management
Safety Awareness Training
Primavera P3E and P5
E Take-Off Program
Project Management Refresher
First Responder Training
Basic CAD Course
Microsoft Word, Excel, Power Point, Outlook
NCCER Certified Plus Pipefitter
Certified SMAW and GTAW Welder