B. Sasikumar,
**/** * ********* **** street
Sathuvachari,
Vellore-632009,
*********.******@*****.***,
Career Objective
To utilize my expertise in the field of electrical engineering and implement my innovative ideas and creative mind towards the area of specialization.
Responsibilities:-
About 20 years’ experience in operation and maintenance, Fault finding and rectification, testing and commissioning, condition motoring, Preventive and breakdown maintenance of electrical equipment (HV and LV).
To ensure smooth functioning of electrical installation through effective and efficient maintenance management of system.
Optimize the KVAH units, to maintain the power factor and conduct the periodical harmonics study to the plant entire plant .
Maximum availability and reliability of electrical system for process operation and control with desired safety of man, machine and environment.(Increase MTBF and reduce the MTTR)
Time bound implementation of new modification and projects with key initiatives like resource conservation and safety.
Optimization of departmental inventory, budgetary planning.
Well versed with legal & statutory requirements of HT/LT electrical system with desired protection and safety standards applicable to power plant and steel plant.
Practices modern electrical maintenance techniques for better efficiency of electrical installations.
Protective relays and protection scheme for primary and secondary distribution system.
Short circuit study, relay setting and relay co-ordination of electrical system includes motor, feeders and CRP panel.
Modification of scheme and energy saving as per system requirement.
Prepare and approved the SOP, Annual PM Schedule, change over procedure and related documents.
To conduct the training for Engineer and Technician of operation and maintenance of 220 KV AIS substation equipment (like Transformer, CT, PT, CB and Isolator), HT/LT switch gear, DOL starter and AC/DC Cranes. Career Summary
Employer Designation Summary
Maharashtra seamless ltd DY Manager Jun-2016 to Still Now L&T Shipbuilding Sr. Engineer Sep-2013 to Jun-2016 Alp consultant (ABB LTD) Commissioning Engineer July 2011 to sep-2013 Premiere wind tech services Electrical Engineer Mar 2011 to July 2011 Voltech Engineer Pvt Ltd Commissioning Engineer Mar 2009 to Mar 2011 RRB Energy LTD Electrical Supervisor OCT 2005 to Feb 2009 Sri Venkateswara granite and decors Electrical Supervisor Jan 2002 to Sep 2005 Projects Handled
Organization Project Project profile Duration
Maharashtra
Seamless Ltd
3.5MW roof solar plant &
renovation of 220KV (3
bay)
Monitoring the installation, commissioning of the
entire system.220KV 2 no of transformer bay and
01 no of incomer, cable schedule preparation,
cable laying and termination, control scheme
checking and commissioning.
L&T Shipbuilding Shop & Building MCC & Panel, Lighting, Equipment Installation. Sep-2013 to Mar-2014
Sterlite industries
india ltd
2X 80 MW CPP Tuticorin Commissioning of E-Bop and Installation and Commissioning coordination for UPS & Battery,
LMS system
July 2011 to
Sep-2013
Facor power ltd 2X45 MW CPP
Bhadrak,Orissa
132 KV C & R panel, HT < switchgear Testing
and commissioning
June 2010 to
Mar 2011
RRUVNL UNIT#7 KSTPS, Kota,
Rajasthan.
HT < switchgear Testing and commissioning May 2009 to June 2010
Educational Details:
Sr no School & Institute Name Duration Percentage
1 SSLC Govt Hr Sec School 1998 63.33%
2 DEEE Sri Venkateswara Polytechnic 1998-2001 74.5% Personal Details
Father’s Name : Mr. P.Baskar
Gender : Male
Date of Birth : 31.07.1983
Marital status : Married
Nationality : Indian
Mother Toque : Tamil
Language Profile : English, Telugu & Hindi
I hereby declare that all the information furnished above is true to the best of my knowledge and belief. Place : Vellore, India Signature
Date : (SASIKUMAR.B)