Post Job Free

Resume

Sign in

Metrorail and Monorail/Bridges/Highway/Building Construction

Location:
Rani Chennamma Nagar, Karnataka, India
Salary:
Negotiable
Posted:
February 14, 2024

Contact this candidate

Resume:

-

PROFILE

I have ** Years of experience in execution and management of all civil works involved

in construction of Metrorail and Monorail/Bridges/Highways/Building Construction. Expert in project execution, Supervision and Interface, working with multi-disciplinary professionals from all over the world. Having a good analytical and problem-solving skill. Taking professional responsibility in all matters. Lead and supervise the team of multi-Engineering disciplinary staff and an experienced Multi-national Contractor within contract period.

CAREER

Additional Resident Engineer October 2021-January 2024 NKDM Association-JV of -Nippon Koei-DMRC- Mott MacDonald Project: Dhaka Metro Project, Dhaka Bangladesh

Client: Dhaka Mass Transit Company Limited

Detailed project description:

Line 6 of Dhaka Metro, 20 kms elevated line with 16 stations and a terminal Depot under construction in Dhaka, the capital and the busiest city of Bangladesh. Project cost $2.8 Billion, funding by JICA.

Detailed experience:

Responsible for managing and supervising overall activities of Metro Stations and Viaduct related to Civil & Architectural Constructions, MEP works and Interface with other Contractors. Prepare clear, complete, and accurate working plans. Evaluate and monitor the work progress in accordance with submitted work programme. Managing the Supervision staff for different packages. Maintains liaison with units within the organization and individuals inside and outside of the organization. Preparation Extension of Time. Coordinate with the Project Managers and other staffs of the Contractor to ensure works are completed. Coordinate with Employer for the ongoing works, any additional requirements or changes. Manage group of engineers and/or technicians, coordinating activities of the unit. Attend Employer’s site related meetings. Establish and maintain project engineering records. Selection of materials and finishes. Handling everyday site coordination meetings on different issues. Approving the RIWs, As-built, FCR, NCR. Monitor construction site progress and manage issues that arose. Coordinate with different Authorities to expedite Permits and Approvals etc. Work effectively in co-ordinating activities and complex tasks. Oversee the Taking Over process and Tests on Completion.

Assistant Resident Engineer December 2014 – December 2020 SYSTRA

Project: Riyadh Metro Project, Riyadh Saudi Arabia Client: Royal Commission for Riyadh City

ILYAS A BAGBAN

Additional Resident Engineer

EDUCATION

1. Year 1990-1994

Diploma in Civil Engineering

2. Year 2005-2008

Bachelor of Technology (Civil)

TOTAL YEARS OF EXPERIENCE: 26

Years

Railway Experience: 14 Years

Roads, Highways and Buildings:

12 Years

International: 8 Years

PROFESSIONAL AFFILIATIONS

Saudi Council of Engineers

SOFTWARE

Primavera, MS Word and MS

Excel

PROFESSIONAL AWARDS

1. Year: 2015 Quality

Management System - Riyadh

Metro Project

2. Year: 2019 Health, Safety &

Environmental - Riyadh Metro

Project

3. Year 2023 Certificate of

Appreciation – Dhaka Metro

Project

179, Rani Channamma Nagar, 1st Stage, Channamma Garden, Belgaum, Karnataka, India

+91-951******* ad3l67@r.postjobfree.com

ad3l67@r.postjobfree.com

Detailed project description:

The Riyadh Metro Project is the Rapid Transit system under construction in the city of Riyadh. The project will cost $22.5 billion to build 6 metro lines of total length of 176 Km with 85 stations.

Detailed experience:

Responsible for the Construction supervision of viaduct, elevated stations and Park and Ride for elevated metro alignment. Coordinate with Authorities to expedite Permits and Approvals. Handling site coordination meetings and quality assurance of the work carried out at the site. Review of work statements. All Utilities, enabling works and implementation of traffic control plans on site. Claims analysis. Correspondence with Contractor. Solving the technical problems that may arise during construction. Monitor safe work practices in compliance of site safety procedures and standards. Coordinate and communicate effectively with Contractor and client. Attending progress review meetings. Maintaining program and progress records. Preparation and ensure that the construction works are executed in accordance with the technical specifications and other Works Contract documents. Implementation of Traffic management plan on site. Senior Construction Engineer April 2009 – December 2014 SCOMI (Malaysia) and L&T JV

Project: Mumbai Monorail Project, Mumbai

Client: Mumbai Metropolitan Region Development Authority Detailed project description:

Mumbai Monorail is a monorail system in the city of Mumbai built as part of a major expansion of public transport in the city. It is a fifth-largest monorail system in the world. It is a Straddle-beam monorail which having 4 coaches. It has 18 Stations. Train run within 15 minutes headway.

Detailed experience:

Proper interface between civil and rolling stocks contractors. Works in close cooperation with System Engineering Managers, Safety Manager, RAM Manager, Integration Managers, other Interface Manager, Project Control Manager. Is responsible for ensuring adequate and timely answers to all interface queries (RFI) initiated by Employer on technical matters after consulting involved Engineers in the Engineering Team. Ensures that queries/clarification from the Local team are attended to on a priority basis to allow for smooth information flow. Centralizes all interface queries from the Engineering Team to be addressed to Employer and/or other Contractors. Identifies limit of SOW among the other Contractors and precise responsibility Matrix. Manages all the activities concerning potential technical Variations of SOW, which could be raised in relation to activity. Participates to Project Meetings (internal and external: with the Employer, subcontractors and other entities) when scheduled and/or requested.

Resident Engineer June 2008 – April 2009

Shirish Patel and Associates Pvt, Ltd.

Project: Construction of Eastern Express Highway at Mumbai 1. Construction of Flyover between Eastern Express Highway and V.N. Purav Marg at Suman Nagar Junction Mumbai. 2. Widening and Construction of Eastern Express Highway, Mumbai 009*********** ad3l67@r.postjobfree.com

Client: Mumbai Metropolitan Region Development Authority, Mumbai Detailed experience:

Monitoring and supervision of all construction activities for Voided slab Flyover Bridge over Express Highway. Representing review meetings with Clients/Independent Engineer/Contractor. Coordinate and communicate effectively with contractor and client. Liaison with client for requirements. Coordinate with Authorities to expedite Permits and Approvals. Establish and maintain project engineering records. Construction supervision of Express highway. Work includes preconstruction activities like liaison & coordination with local authorities for land acquisition, shifting of utilities, Relocation

& Re habitation of Project Affected Persons (PAPs) & religious structures, checking contractors work programme, approval of working & supplementary drawings, checking measurements and contractor’s bills, certifying interim payment, implementing process for laying of pavement layers, asphalt and concrete works, quality control, documentation. Senior Site Engineer August 2003- Feb 2005

Tarmat Infrastructural and Engineering P. Ltd.

Project: Karnataka State Highway Improvement Project Location: Karnataka Construction of highway between Yargatti to sankeshwar, part of Hydrabad Goa Highway. Client: Public Works Division Government of Karnataka Detailed Experience:

Managing highway-related projects from conceptual stages through all phases of pre- and post-contract activities. Establishment of site offices, Bituminous Hot Mix Plant at Construction site. Construction and establishment of site QC laboratory. Clearance of construction site area and Enabling works. Execute construction activities from beginning to completion in accordance with contract conditions. Execution of granular and bituminous pavement coarses using sensor pavers. Work with other managers, project engineers and discipline Heads to develop schedules and plans for the various elements of the project. Handling and distribution of resources & labour to achieve required target within a time.

Senior Engineer January 2001- August 2003

R.N. Shetty & Co. and Sunway Construction Co. (Malaysia) JV Project: Golden Quadrilateral Project-Four Laning of National Highway 4, km 433/00 to km 515/00 includes Belgaum Bypass.

Client: National Highway Authority of India, Delhi Detailed project description:

National Highway No. 4, Part of Golden Quadrilateral Project connecting to the India’s 4 Metropolitan cities Delhi-Mumbai-Chennai-Kolkata, 4 lane project of Flexible as well as Rigid pavement construction with modern technology. Detailed experience:

Concrete Pavement by Writgen-850 slip form paver. Execution of granular and bituminous pavement coarses using sensor pavers. Handling and distribution of resources & labour to achieve required target within a time. Verification of Quality of material at site. Earthwork deep cutting and filling. Construction and establishment of site QC laboratory. Ensuring safety standards in construction area. Responsible for executing the work in accordance ILYAS ABDUL RAZAK BAGBAN

with working/shop drawings and specifications, target & construction programmes, Method Statements. Directing and controlling the whole field construction activities. Resolves site issues. Assigns responsibility to key subordinates in their respective fields of expertise. Work with other managers, project engineers and discipline Heads to develop schedules and plans for the various elements of the project.

Consulting Engineer and Government Contractor April 1994 - January 2001 Detailed project description:

Construction activities for Residential and Commercial Buildings and Road construction works for Public Works Division, Government of India.

Detailed experience:

Entire site management. Work planning and execution at the site. Responsible for all paperwork and report generation. Execution of Earthwork in Excavation and filling. Execution of various pavements for road construction work including Water Bound macadam, Bituminous Bound Macadam and Premix Carpet. Execution of road drainage works. Preparation of detailed architectural and design drawings. Rate analysis, Estimation and costing, bill of Quantities. Preparation of Bar Bending Schedule. Entire site management. Work planning and execution at the



Contact this candidate