Post Job Free

Resume

Sign in

Medium Voltage Project Management

Location:
Cairo, Gharbia, Egypt
Posted:
February 13, 2024

Contact this candidate

Resume:

*

CV

Hussein Mamdouh Ali Abdel Halem

Address: Dar Misr, First stage, Apartment 34, Shorouk City, Cairo, Egypt. Tel: 02 20381790

Mobile: +2-011******** 012********

E-mail: ad3k6o@r.postjobfree.com

OBJECTIVE:

Seeking new challenges in (occupation) which effectively utilizes (professional experience). Education:

B.Sc., Electrical Power and Machines Engineering, Ain Shams University, 2002 Accumulative Degree: Very Good.

Graduation project degree: Excellent.

Extra Education (training):

ABB ARAB (panel boards, Medium voltage equipment, & transformers manufacturing).

ELMACO transformers manufacturing.

Radio & TV Building (electricity distribution and power continuity in administration buildings).

Al Delta for Steel (electricity distribution, PLC and SCADA systems). Extra Courses:

Installation and maintenance of transformers (Egyptian Engineers Association).

Electrical installations according to the Electrical Egyptian Code (Egyptian Engineers Association).

Electrical Distribution (Engineering Syndicate).

Bases in earthing and bonding systems.

Bases of electrical fire system (NFPA).

PMP course (project management professional) (ANEDEST).

Mat lab (for several arithmetic Operations & draw Curves) (AIN SHAMS UNIVERSITY).

Rivet 2014 (designing of electrical networks) (KEMET). Key Qualifications:

2

I have over 19 years’ experience in the field of electrical engineering.

I have worked on variety buildings projects such as banks, Hotels, Airports, residential, Industrial & Administrative buildings and etc

I have special experience in the following:

i) Design electrical networks (medium voltage, low voltage, lighting, systems, and light current).

ii) Design infrastructure networks (medium voltage, low voltage, light current, & street lighting).

iii) Design review & comments according to the local, international & FM global standards & codes.

iv) Supervision on the previous items.

v) Cost estimation & quantity survey.

vi) Quality control, Quality assurance.

vii) Preparing of material submittals.

viii)Preparing of projects shop drawings.

ix) Preparing of prices analysis and cost breakdowns. Professional Experience:

12-10-2021 to Present: Shaker consulting group:

Supervision and Inspection of Electrical works in buildings & inspection of material delivered to site (NEW GIZA University)

Approval for technical data, catalogues, & samples submittals.

Revision for contractor invoices.

Holding of meetings on site.

Revision & Approval for work shop drawings.

Positive & negative variation orders

Projects

NEW GIZA University Phase 2

28-2-2021 to Present: EHAF consulting group:

Senior supervision electrical engineer:

Supervision and Inspection of Electrical works in buildings & inspection of material delivered to site (Cairo Festival City mall extension).

Approval for technical data, catalogues, & samples submittals. 3

Revision for contractor invoices.

Holding of meetings on site.

Revision & Approval for work shop drawings.

Positive & negative variation orders

Projects

Cairo Festival City mall extension

29-12-2019 to 25-2-2021: AMG (Al Amar consulting group): Principle design electrical engineer:

Design packages for the following project: design and design review and preparation of calculations (voltage drop, short circuit, lux calculations), specs and BOQ's. o Porto Cairo (all systems for apartments and infrastructure). o Azadeer.

o Celia (all systems for apartments, admin buildings, and infrastructure). o Porto Pheonice (all systems for apartments, admin buildings, and infrastructure). o Madenty B8 district (all systems for apartments). o Saint Armani School (all systems for buildings, and infrastructure). o MUST (Misr university for science and technology): (preparing shop drawing package).

o Andalusia hospital (Maadi).

o Andalusia hospital (October).

o El Banna Hospital (Maadi).

o New City {HARAM city} (all systems for apartments and infrastructure). o Toshka Farms and admin buildings (all systems for buildings, and infrastructure). o El Khour Abu Sombol ASWAN (all systems for buildings, and infrastructure). o Sadat Food factory (all systems for buildings, and infrastructure). o Satellite in (HIKESTEB and QENA): (all systems for buildings, data center design

{TEIR 3 based}, and infrastructure).

o West Mark (Infrastructure and landscape works).

Technical office works: material submittals review and approval, shop drawings review and approval, reply to contractors queries.

4

8-2015 to 12-2019: EHAF consulting group:

Senior supervision electrical engineer:

Supervision and Inspection of Electrical works in buildings and infrastructure networks

{medium, low voltage, telephone networks & street lighting} & inspection of material delivered to site (Schlumberger, Westgate, Kuwadico, and Tactical village).

Approval for technical data, catalogues, & samples submittals.

Design and design review and comments.

Revision for contractor invoices.

Holding of meetings on site.

Revision & Approval for work shop drawings.

Revision of as Built Drawings.

Revision of Snagging lists for works.

Revision for tenders submitted by contractors & all technical, financial offers.

Positive & negative variation orders

Projects

Schlumberger integrated base 6th October for petroleum services

(Supervision on electrical works and infrastructure networks {medium, low voltage, telephone networks & street lighting}), 340 Million.

West Gate Mall 6th October (one of Green Hills projects)

: (supervision on electrical works in concrete): 62 Million.

BUROUJ (Capital Group Properties): (supervision on electrical Works in concrete): 660 Million.

MIVIDA (EMAAR EGYPT): (revision of design packages, shop drawings submittals,

Material submittals for the landscape scope).

Tactical village: (supervision on electrical works in concrete + infrastructure networks): Ministry of interior.

ACUD (NN1 & NN2 {network nodes 1, 2}): (design review and supervision on electrical works in concrete and finishes + infrastructure networks).

ACUD ARAB INVESTMENT BANK HEADQUARTER: supervision on electrical works in concrete and finishes.

5

6-2014 to 8-2015: ECOTEC for engineering & trading: Technical office electrical engineer:

Design of new projects (low voltage and light current).

Technical office manager.

Cost estimation & quantity survey.

Projects manager (RAYA, CFC, APEX).

Preparing of Material Submittals.

Preparing of Projects Shop Drawings.

Preparing of Cost Analysis for positive & negative variations.

Preparing of tenders, technical & Financial Offers.

Follow-up of Sites implementation, Studying & Performing Purchase Orders. Projects

HURGHADA City Center: in HURGHADA: Mall with residential units & landscape, MEP, cost 140 Million EGP.

RAYA PLAZA Mall & administration buildings (implementation of electrical works in mall and administration building) 120 Million EGP.

Cairo Festival City (chiller & cooling Tower buildings) 175 Million EGP.

Food Factory (10th of Ramadan) administration building & factory building (Design and pricing only).

El SEWEDY School (10th of Ramadan) administration building & factory building

(Design and pricing only).

1-2011 to 5-2014: EGEC – Engineering House of Expertise, Egypt: Electrical Supervision Engineer:

Supervision and Inspection of Electrical works and infrastructure networks & inspection of material delivered to site (MIVIDA, PORTO new Cairo).

Approval for technical data, catalogues, & samples submittals.

Revision for contractor invoices.

Hold meetings on site.

Revision & Approval for work shop drawings.

Revision of as Built Drawings.

Revision of Snagging lists.

6

Revision for tenders submitted by contractors & all technical, financial offers.

Positive & negative variation orders

Projects

Porto New Cairo, AMER Group: Supervision on Residential & Commercial units with landscape & infrastructure network (new Cairo) total cost 400 Million EGP

MIVIDA, EMAAE MISR, New Cairo (one of EMAAE MISR Projects in new Cairo: 274 villas with fence works: total cost 3288 Million EGP). 2010: Altawheed for Contracting & Electrical Works: Engineering Management Manager

Design (low voltage and light current).

Technical office manager.

Cost estimation & quantity survey.

Main projects manager PALM Parks, Polaris, Smart Village networks).

Preparing of Material Submittals and document submittals.

Preparing of Projects Shop Drawings.

Preparing of cost Analysis, positive & negative variations.

Preparing of tenders, technical & Financial Offers.

Follow-up of Sites implementation, Studying & Performing Purchase Orders. Projects

Palm Parks {Implementation of electrical works and infrastructure networks} (one of PALM HILLS Projects in 6th OCTOBER): 400 building with infrastructure networks: total cost 486 Million EGP).

Polaris {Implementation of infrastructure networks} (one of Turkish villages Projects in 6th OCTOBER): infrastructure networks MV & LV & Tele: total cost 129 Million EGP).

Sofiteel Hotel (Sokhna) {Implementation} (Residential Building & GULF playgrounds: total cost 220 Million EGP).

Swan Lake October {Implementation} (one of Swan Lake Projects in 6th OCTOBER): 220 building with infrastructure networks: total cost 300 Million EGP).

Meridian Pyramids {Implementation of electrical works and infrastructure networks}

(electrical LV cables and LC systems: total cost 7 million EGP).

IBN SINA FARMA Stores {Implementation} (Alex, Damanhur, Mansoura & Sawwah)

(stores for medicines: total cost 3 million EGP each). 7

2-2009 to 5-2010: EDG Electromechanical Design Group: Design & Supervision Engineer

Design and supervision.

Approval of shop drawings

Approval for technical data, catalogues, & samples submittals.

Inspection of material delivered to site.

Revision for contractor invoices.

Hold meetings on site.

Revision for tenders submitted by contractors, positive & negative variation orders. Projects

HURGHADA Airport Extension (Supervision on electrical works & infrastructure networks) Power, Lighting, Fire Alarm, Multimedia, Sound System, & CCTV: total cost 189 million EGP).

6th Of October Villas {supervision} (Syndicate of Agriculture careers) (one of Syndicate of Agriculture Projects in 6th OCTOBER: 89 building with infrastructure networks (MV, LV networks, Telephone, & street lighting): total cost 129 Million EGP).

Millage Coffee & Restaurant (Design only).

Lena Springs Project (New Cairo) (infrastructure networks (MV, LV networks, Telephone, & street lighting): total cost 186 Million EGP). 10-2007 to 2-2009: TOC (Technical Office for Contracting): Technical Office Engineer

Technical office Manager.

Preparing of Material Submittals.

Preparing of Projects work Shop Drawings.

Preparing of cost Analysis.

Cost Estimation for new Projects Tenders & preparing of Technical & Financial Offers for Projects.

Follow-up of Sites implementation, Studying & Performing Purchase Orders. Projects

GHABBOUR Auto (Luxor) {Implementation} (workshops & Administrative buildings: total cost 65 million EGP).

8

United Nation Bank {Implementation} (replacement & installation of new electrical systems: total cost 12 million EGP).

Al Ahly Bank (Smart Village Branch) {Implementation} (replacement & installation of new electrical systems: total cost 12 million EGP).

Al Ahly Bank (Faisel Branch) {Implementation} (replacement & installation of new electrical systems: total cost 12 million EGP).

Link DSL Project {Implementation} (Smart Village Branch) (installation of electrical systems in administrative Building and infrastructure networks (MV, LV networks, Telephone, & street lighting): total cost 45 million EGP).

El Tamwel El Saudi (Dokki Branch) {Implementation} (replacement & installation of new electrical systems: total cost 15 million EGP).

El Tamwel El Saudi (Rodel Farag Branch) {Implementation} (replacement & installation of new electrical systems: total cost 15 million EGP).

Villa of Finland Ambassador {Implementation} (replacement & installation of new electrical systems: cost 5 million EGP).

10-2005 to 10-2007: ENCO (Engineering Construction Office): Electrical Engineer

Site Engineer: Implementation of Electrical Works in (HOLIDAY INN) Hotel {City Stars Group}: Power, Lighting, Fire Alarm, BMS, Multimedia, Sound System, Encoding System, & CCTV, Roads. With SHAKER CONSULTANT GROUP. Projects

(Holiday Inn) Hotel (City Stars Group) {Implementation} (installation of electrical systems: Power, Lighting, Fire Alarm, BMS, Multimedia, Sound System, Encoding System, & CCTV: total cost 180 million EGP).

10-2002 to 9- 2005: Tag Al Riyadh Trading Company (KSA): Technical Office Engineer

Technical office Manager.

Preparing of Material Submittals.

Preparing of Projects work Shop Drawings.

Preparing of cost Analysis.

Cost Estimation for Projects Tenders & preparing of Technical & Financial Offers for Projects.

Follow-up of sites, Studying & Performing Purchase Orders. Projects

9

Al Waleed Ben Abdel Malek School (Al Kharg) {SAUDI Kingdom} {Implementation}

(area 4000 sq. MT: classes & playgrounds: Total cost 18 million SR).

Shehab El Din Al Asklany School (Al Abwaa- Geddah) {SAUDI Kingdom}

{Implementation of electrical works and infrastructure networks} (area 3000 sq. MT: classes & playgrounds: Total cost 5 million SR).

Marawan Ben Al Hakam School (Saabar - Geddah) {SAUDI Kingdom} {Implementation of electrical works and infrastructure networks} (area 3000 sq. MT: classes & playgrounds: Total cost 5 million SR).

AL Emam El Boukhary School (Al Kasem) Ramah Police Station (Ramah) {SAUDI Kingdom} {Implementation of electrical works and infrastructure networks} (area 2000 sq. MT: administrative & prisons buildings: Total cost 7 million SR).

Al Hareq Police Station (Al Hareq) {SAUDI Kingdom} {Implementation of electrical works and infrastructure networks} (area 2000 sq. MT: administrative & prisons buildings: Total cost 24 million SR).

Design projects:

SAPTCO Riyadh (Design only).

Maadi Garage (Design only).

Bus station, Zayed City (Design only).

Administration Building for (La Vashe Que Rit) New Cairo (Design and pricing only).

KSA Building (Design only).

Other Skills:

The Egyptian code, IEC and NEC.

REVIT till 2021 (fair)

AutoCAD till 2023.

DIALUX, Saudi lighting, docwin, Office till 2016.

Primavera 3.

PMP course.

Mat lab (for several arithmetic Operations & draw Curves). LANGUAGES

Arabic: Mother Language.

English: Excellent

10

French: Fair

PERSONAL INFORMATION

D.O.B.: 03-08-1980

Status: Married.

Nationally: Egyptian.

References available on request.

Updated at 08-02-2024



Contact this candidate