Post Job Free

Resume

Sign in

Construction Manager Project Management

Location:
Dubai, United Arab Emirates
Posted:
February 08, 2024

Contact this candidate

Resume:

RUDRA NARAYAN MOHANTY

Construction Manager- Highway and Bridges,Oil and Gas, Substation and Building, Civil & Infrastructures,Industrial, Thermal power,Irrigation Projects

An accomplished professional with the merit of executing prestigious projects of large magnitude, within strict time schedules, cost & quality; targeting to express potential in strategic level roles in Construction Management and Project Management in an esteemed organization

+971*********

+971*********

ad3hch@r.postjobfree.com

Dubai

PROFILE SUMMARY

A competent professional with over 24 years of experience in Construction, Planning, Scheduling, Initiating, Monitoring and Controlling Projects along time, cost & quality including technical & techno-commercial coordination with all stakeholders

Spearheaded the entire gamut of tasks right from Construction,planning, monitoring, controlling phases of project lifecycle to overall inter-discipline coordination, administration and resource planning

Strong relationship management skills with Project Members, Consultants, Engineers, Clients, Vendors, Suppliers, Subcontractors, and so on for framing structural parameters as well as the technical & commercial specifications

Leveraged capabilities in performing activities including estimation, site inspections, techno-commercial negotiations, settlement of bills, checking & obtaining approvals to ensure maximum profitability; managed Civil, Mechanical, Electricals Structural & Interior Fit-Out work in various project, with innate proficiency in Site Administration & Vendor Management

Expertise in execution, planning,engineering coordination,shop drawing,monitoring and scheduling and spearheading as well as involvent in method engineering / method statement, development, contract administration & resource planning

Skilled in monitoring project status during periodic project review meetings; participating in project meetings for evaluating project progress including ensuring adherence to quality & safety norms

A strategic planner with expertise in executing of projects with a flair for adopting modern methodologies; complying with quality standards.

Tracking & analyzing project activities with a key emphasis on quality, project drawings, specifications, standards & codes; reviewing schedule & managing budget for cash flow requirements

CORE COMPETENCIES

Site & Construction Management

Project Planning & Management

Budgetary & Cost Control

Quality Assurance & Compliance

Resource Management & Optimization

Inventory & Stock Management

Progress Monitoring & Tracking

Vendor Evaluation & Management

Risk Assessment & Mitigation

Client & Stakeholder Relationship Management

HSE Management

Team Management & Leadership

Cross-Functional Coordination

Educational Qualifications :

Bachelor’s Degree in Civil Engineering

Diploma in Civil Engineering

Professional Qualifications / Courses Attended :

Safety Training Program from ADNOC, DEWA

Project Management Professional (PMP)

High Strength Concrete (Mix design of M60) Design Mix

CAREER TIMELINE

WORK EXPERIENCE

Present Employer :

ROBT STONE (ME) LLC

Position : Construction Manager(Approved in ADNOC Onshore) – MOT Fujairah

Period : May 2021 to Till Date

Project : EPC for Fire Water Ring Replacement at MOT & MPS

Client : Abu Dhabi National Oil Company ADNOC (Onshore)

Project Overview:

Replacement of existing GRVE underground piping with new 300# above ground carbon steel piping with internal FBE coating for tank farm and utility area.

Replacement of existing GRVE underground piping with new 300# under ground carbon steel piping with internal FBE coating for loading pumps and fiscal metering facilities.

Installation of new Pressure reduction valves at seven locations.

Installation of 20 no’s of 24” new Isolation valves and utilizing the existing butterfly valves.

Tie-ins to the FW pump house headers and the new firewater header(s) Tank Farm Area shall be tied into the existing fire water piping.

Tie-in provisions for future installations.

Associated Civil works including Micro piling,pipe bridge,pipe support,foundations etc.

Associated Steel Structural, Electrical and Instrumentation works.

Overal 35Km of piping works.

Demolition of existing facilities and reinstate of Bund walls.

11 km internal Service Roads

Previous Employer :

GHANTOOT TRANSPORT AND GENERAL CONTRACTING LLC

Position : Construction Manager

Period : Jan 2015 to April 2021

Project 1 : 400/132 KV Canal Garden Substation Project

Client : Dubai Electricity & Water Authority (DEWA)

Position : Sr Project Engineer

Project 2 : Mafraq to Al Ghwaifat Border Post Highway-Construction of New Ruwais Bypass

Client : Department of Transport Abu Dhabi (DOT)

Project-1 Overview:

Grass root Complex for 400kv/132kv substation building including roads and underground systems

GIS & Relay Rooms

4 units of ICT transformers units

4 Units of Reactor Units

Control Room Units and other utilities

Gantry foundation,switchyard foundation etc.

Steel structure with enclosure works of transformer and reactors.

Roads, underground networks, etc.

Project-2 Overview:

Design & Construction of 55km New Freeway and 12km four lane divided new link flexible pavements roads, one trumpet interchange, four dumbbell, interchange, one major bridge, 5 Minor Bridges, six underpasses, Culverts, underpasses etc. with existing services, street light, road marking and signs.

GAMMON INDIA LTD

Position : Deputy Project Manager

Period : Oct 2010 to Jan 2015

Project : 2X500MW Thermal Power Project, Tuticorin, Tamilnadu

Client : NLC TAMILNADU POWER LTD (NTPL)

Project Overview:

Construction of 2 Nos. of Natural draft 150mtr height cooling tower of 2x500MW power plant

275mtr RCC Chimney

Main substation,Turbine, Boiler Foundation and complete structures

Switch gear room, Buildings,Cold water outlet pump house.

Fabrication and erection of steel structure.

Internal structures, Roads and internal utilities

AL ASAB GEN. CONTRACTING.

Position : Deputy Construction Manager

Period : Aug 2009 to Sep 2010

Project : Abu Dhabi crude oil pipe line project(ADCOP) at MPS MP21 Stations, Habshan

Client : CPECC

Project Overview:

Electrical substation building, control building, Administration building

Fire pump house, MOL Pump House with steel structure & enclosure

Oil Tank, Civil foundation of pipe line with steel structure works

Internal roads, Bund wall, Pavements of Main pumping station

Underground drainage systems, electrical trenches

5KM Internal plant service road

GAMMON INDIA LTD

Position : Assistant Manager

Period : Sept 2006 to Aug 2009

Project : 2x500MW thermal power projects, Neyveli,Tamilnadu

Client : NLC TAMILNADU POWER LTD (NTPL)

Project Overview: :

Construction of 2Nos of Natural draft 150mtr height cooling tower of 2X500MW power plant

2No 275 M height bi flu Chimney

Main Substation with TG foundation and structures, Transformer foundation, Boiler foundation, etc.

Switch gear room, Pump house, other buildings and internal roads and utilities

Fabrication and erection of steel structures

Electrical and Instrumentation works

Internal roads and underground utilities

25KM highway road from Neyveli Town ship to Thermal Power Plant and 7KM internal Plant Road Including Minor Bridges,culverts and Under passes.

ENGINEERS INDIA LTD

Position : Field Inspector

Period : May 2005 to Sep 2006

Project : Sardar Sarovar Narmada Nigam Limited.

Client : Government of Gujarat

Project Overview:

SSNNL Canal project at Gujarat.

Third party inspection of 20KM canal construction works including syphon and bridges and Roads.

Testing of all construction materials

SADBHAV ENGINEERING LTD

Position : Senior Engineer

Project 1 : Strengthening and paving of shoulders of SH-7 (from Viramgam to Halvad (Km 58+825 to 151+500)

Period : Apr 2004 to May 2005

Client : State Highways Authority of Gujrat

Position : Project Engineer

Project 2 : Widening to 4/6 lanes and strengthening of existing 2 –lanes carriageway of NH 5 from KM 61.00 TP 136.500(Chandikhol to Bhadrak ) OR II

Period : Sep 2001 to Mar 2004

Client : National Highways Authority of India

Position : Civil Engineer

Project 1 : 4/6 lanes of Sayla- Chotilla Highway Project NH 8A,Km 135-000 to 171+000.

Period : Feb 1999 to Aug 2001

Client : National Highways Authority of India

Project Overview:

Consrtuction of National Highways and State highways including Roads and structure works.

Major Bridges,Minor bridges, fly overs, culverts, underpasses and retaining walls and etc of National Highways and State Highwayas.

Grade separated Inter change,Intersection Roads etc..

Toll plaza and utilities

ROB and infrastrure works.

PERSONAL DETAILS

Date of Birth: 15th March, 1980

Languages Known: English & Hindi

Permanent Address: Cuttack, Odisha

Present Address: Dubai

Passport No: S 9820682

Date of Issue: 24th March 2019

Date of Expiry: 23th March 2029

Marital Status : Married

Certification by the Candidate

I, the undersigned, Rudra Narayan Mohanty, Passport #: S 9820682 undertake that this CV correctly describes myself, my qualifications and my experience for my assignment. I will be available for the entire duration of the current project.

Name of Expert: Rudra Narayan Mohanty Signature

Date:



Contact this candidate