Abdul Hafeez
Current Position : Assistant Resident Engineer(ARE)
Structure & Architecture Finishes Elevated Stations RIYADH METRO PROJECT KSA
1. Personal details:
D.O.B : March 2nd 1982
SCE Reg No. 279496/ Engineering Technologist
Contact # 009**-*********, 581095828
Whatsapp # 009**-**-*******
Email ID: ad33id@r.postjobfree.com
2. Career Summary:
· Reinstatements work, landscaping, temporary & permanent urban utilities disposition at Riyadh Metro Project.
3. Key Skill:
· Tunneling
· Underground Structures construction
· Multistory building structure work & architecture finishes
· Urban utilities disposition
4. Academic Qualifications:
· Master degree in project Management ZABIST Islamabad Pakistan
· B.Tech(Hons) Civil Engineering Preston Islamabad Pakistan
· B.Tech(Pass) University of Engineering & Technology Peshawar Pakistan 5. Work History:
Assistant Resident Engineer(ARE)
Structure & Architecture Finishes Elevated Stations July 2017 – To date
Egis Rail, Riyadh, Saudi Arabia
Project: Riyadh Metro Project
Client: RCRC
Responsibilities:
· OBC (Olaya Batha Corridor) Reinstatement/Landscaping Paving work, Temporary & permanent utilities disposition & permanent utilities connection installation.
· Invoice review, tracking of schedule activities & Recommendations for tracking milestone.
· As-built drawing review & snagging (Punch listing)
· Shop drawing review.
· Millstone tracking & interface with T&C.
· Inspection of active & passive fire life safety and implementation of scenario based testing
· Minutes of meeting, daily & weekly reporting
· Drawing redline markup & As-built drawing review.
· Having experience more than 15 years with multinational
· Three tunneling projects having 9/Nine years of experience in TBM Tunneling (Gripper & EPB Machine) as well as Conventional(D&B) tunneling method and underground structures construction.
· Having work experience on Drill & blast tunneling include NATM & Q-System method
· Structure & Architecture finishes work experience at Riyadh metro project in Elevated stations. Civil Engineer (Tunnel)
TBM tunnel construction & 1st stage of stage of invert concrete Jun 2015 – Jun 2017
Egis Rail, Riyadh, Saudi Arabia
Project: Riyadh Metro Project
Client: RCRC
Responsibilities:
· 1st stage invert concrete placement & tunnel handed over to track team for 2nd stage & track placement.
· Monthly invoice review & procedure development for reconciliation
· Review and analysis of interface station with tunnel alignment
· Review of submitted method statement.
· Review of installed support “Ring building, annulus grouting” and comparative analysis with baseline
· TBM technical data review and comparative analysis with base line
· Format and procedure development for QA/QC Inspection and verification
· Defect mapping with their classification and remedial measure recommendation
· Defect repairing, Secondary grouting monitoring and analysis for their effectiveness.
· Responsible for implementation of Health and Safety management plan during TBM assembling & disassembling, mining period and 1st stage invert concrete.
· Construction supervision of tunneling work (Excavation & Support) by TBM (EPB: Earth pressure balancing tunnel boring machine)
· Reporting: Daily, weekly and monthly progress report Tunnel Engineer
TBM Tunneling
April 2011 – May 2015
National Development Consultant
Project: Neelum Jhelum Hydro Electric Project
Client: WAPDA
Responsibilities:
· Drawing review of TBM assembling chamber and review of construction method statements, construction supervision
· Review of SOPs for TBM tunnel and recommendation for TBM support drawing
· Documentation: Weekly and Monthly progress report, TBM utilization, comparative analysis b/w actual progress and base line programme
· BOQ review and analysis b/w actual cost and cost base line (Variations)
· Review and analysis of cutter head maintenance reports and recommendations
· Review of IPC (Interim payment certificate)
· Minutes of meeting
Tunnel Engineer
Tunneling by Drill & Blast(NATM)
January 2008 – March 2011
GEOCONSULT (AUSTRIAN CONSULTANTS)
Project: Lowari Rail Tunnel Project
Client: National Highway Authority
Responsibilities:
· Support recommendation for existing tunnel excavated by F.W.O in 1976
· Portal excavation, Supervision of Tunnel Excavation and support installation
· Checking and Quality control of shot Crete
· Monitoring toxic gases concentration
· Checking dewatering layout
· Analysis of equipment performance
· Monitoring Tunnel Deformations and Rock Bolts Pull out tests
· Review of Blast pattern as per the prevailing geological condition
· Noting Break down of contractor’s Tunnel Equipment
· Preparation of weekly and Monthly progress report
· Supervision of slope cut and support installation in platform area
· Installation supervision of swellex, S.D.A and SN Rock bolts Note: References will be provided on demand