Post Job Free

Resume

Sign in

Quality Control Assembly Tech

Location:
Junrejo, East Java, 65323, Indonesia
Posted:
January 20, 2024

Contact this candidate

Resume:

Jeremy Joy

*** * ****** *******, ** ***** 660-***-****

ad2ycs@r.postjobfree.com

Education

State Fair Community College Associates in Machine Tool Technology in 2001

Employment

Gardner Denver Inc. Sedalia, Mo Nov 2013 to Aug 2015

Assembly Tech

Assemble bare blower units

Visually inspect all components used to build bare unit

Interpret clearances need for assembly using micrometers, feeler gages and calipers

Time all units using feeler gages to ensure proper operation in the field

Fill out all necessary paperwork and stamp serial on units

Ensure area is clean and free of UN-needed debris to maintain 5s compliance

Nov 2010 to Nov 2013

Assembly Tech

Assemble oil tank receivers to mount on industrial air compressors.

Setup the motors for electrical systems installation.

Cut and bend steel tubing for application to units.

Perform quality control checks to ensure product meets Bill of Material specifications.

Enclose units based on Quality Measurement System.

Set belts and align sheaves for belt driven units.

Gather tools and materials from in-house supermarket of materials for daily usage needs.

Housing Machine Tech Aug 2004 to Oct 2010

Used a Remote Guided Vehicle to operate a conglomerate of 6 horizontal machine centers.

Swapped out machine tool settings for differing products.

Inspected Flexible Machining System for correct tools required for daily production needs.

Interpret Ziess, or Coordinate Measuring Machine report to make adjustments as well as run zeiss if operator not available

Made adjustments that consisted of numerous setups, wear compensations, and tool lengths.

Promoted to Master Tech for my shift. This lead took responsibility for all production during my shifts.

Stahls Kingsville, Mo Sept 2002 – Aug 2004

Machine Operator

Performed quality control checks on finished products.

Monitored product during the machining process.

Poured molds for product parts.

Removed flaws from parts after the molding process was complete.

Loaded and unloaded parts from fixtures and set up new parts as well

Daycom Clinton, Mo Aug 1999-Sept 2002

Telemarketer

Talked to over 700 people per day while being curtious and up beat

Consistently maintained company average on cold calls

Promoted to Assistant Office manager

Trained all new employees in art of “over the phone sales”

Consistently maintained an 80% collection rate on new business

Education

Calhoun R V-III graduated obtaining my high school diploma May 1999

State Fair Community College Sedalia Mo graduated with my Associates in Applied Science Degree July 2001

References

1.Cody Frazon Supervisor, Gardner Denver 660-***-****

2.Alan Bozworth Lead man, Gardner Denver 660-***-****

3.Dale Trolinger Master Tech, Gardner Denver 660-***-**** xt 7726

4.Russ Hayworth Supervisor, Gardner Denver 660-***-****



Contact this candidate