Rolando P. Aganap Jr.

Block ** Lot * Johndorf Subd. Barra, Opol Mis. Or.

Philippines

ad2y9v@r.postjobfree.com

Mobile: TM 0997-574

****/**** ****-***-

3112

Profile

o Strong foundation in Power plant Installation and Operation. o Multi-skilled and goal oriented

o Strong analytical skills, proactive and assertive o Excellent team player with good leadership skills. Education

Xavier University (Ateneo de Cagayan) Cagayan de Oro City Philippines. Bachelor of Science in Electrical Engineering. Board exam passer for Electrical Engineering, Registered Electrical Engineer (REE), licensed no: 0012983.

Experience

July 30, 2022 up to the present

ELECTRICAL SITE ENGINEER, CUN-AL ENTERPRISES.

SHORE POWER PROJECT inside Philippine Navy Headquarter located WESMINCOM Upper Calarian, Zamboanga City.

o Lead and supervise the layout of embedded 4” PVC pipe 100m long.

o Execute the cable pulling of 3 core 250mm2 royal cord cable. o Lead and execute the installation on shore power cabinet and panel boards.

o Lead and execute the installation of 30KVA AVR.

August 10, 2022 to March 20,2023

EECTRICAL ENGINEER, CUN-AL Enterprises.

Contractor of Electro- Mechanical Rehabilitation for SYNTEK AGRI-BIO CORPORATION automated layer poultry house.

o Lead and supervise the lay out and fabrication of RSC pipe support 500 meters long for the new Electrical control piping and wiring. o Execute Alarm rewiring of motor controls and motor cabling for motor conveyor and elevator.

o Roughing-ins of RSC and liquid tight conduit for the new electrical installation.

o Cable pulling of control and power cable 500 meters span. o Execute daily activity report, incident report and progress billing computation.

February 22, 2022 June 12, 2022

Team Leader, Rich world Infra Solution Corporation. Sub-Contractor of NOKIA Philippines as vendor for Globe Telecommunications. o Liaise with the Client regarding NOKIA radio and antenna installation for cellular sites.

o Execute Alarm of clearing cell sites radio connectivity failure and rectify and replace equipment failure.

o Execute upgrading and replacement of obsolete radio and antenna equipment.

o Carry out installation of new rectifier and batteries to upgrade power in different areas.

o Execute commissioning and integration of newly installed NOKIA radio equipment.

o Liaise and coordinate with the stake holders covering project update and logistics availability.

August 17, 2020 up May 15, 2021

Electrical Project In-Charge, LMA trading and Services. Sub-Contractor of 23.3 MW Bantayan Bunker Diesel Power Plant located at Brgy. Kabangbang, Bantayan, Bantayan Island Cebu.

o Liaise with the Client regarding electrical work activities, progress and electrical materials specifications and delivery.

o Give direct task to Electrical Supervisors and Foreman for their daily task and responsibilities.

Particularly:

-Installation of Grid and equipment grounding system.

-Electrical Lighting and CO roughing-ins and cabling.

-Installation of Fire alarm and Detection System.

-Installation of MV and LV switch gears Control Panels and Power Transformers.

-Cable pulling and termination of MV and LV XLPE cables.

-Installation of MV and LV switch gears Control Panels and Power Transformers.

-Installation of MV and LV switch gears Control Panels and Power Transformers.

-Tank Instrument installation and cabling.

-Installation of VFD and Panel boards for radiator power supply.

-Non Commissioning and Commissioning of auxiliary motors and sensors.

-Hi-pot and megger testing of Medium and low voltage cables.

-SCADA installation and interfacing.

-Installation of fiber optic for Switchgear signals and command.

-Cable Termination for Engine terminal to Switchgear.

-Cable Termination for auxiliary modules and control panel

January 2020 up to July 2020.

Project Engineer, LMA trading and Services.-

GLOBE TELECOM TOWER PROJECT:

(40 METER 3 LEGGED SELF SUPPORTING TOWER) Located at Poblacion Manticao, Misamis Oriental

(50 METER 3- LEGGED SELF SUPPORTING TOWER) Located at Lapuyan, Zamboanga Del Sur.

o Responsible for the construction of Globe telecommunication tower construction

o Give direct task for the laying out of tower foundation for excavation. o Supervise team from the tower foundation lean concreting up to footing and pedestal rebar and concrete pouring.

o Supervise team for the construction of tower perimeter fence. o Responsible for the erection of tower elements

o Supervision of microwave antenna installation and cabling. o Supervision of telecom integration and commissioning. o Responsible for microwave antenna alignment and panning.

March 17, 2019 to October 20, 2019

Electrical Project In-Charge, LMA trading and Services.- 5MW 8ZAL405 ZULSER Genset Rehabilitation Project located at Lapu-Lapu City, Cebu.

o Give direct task to Electrical foreman for the Cable laying and installation of medium, low voltage, control and instrument cables and wires. o Responsible for the Electrical installation of MV and LV switchgears Control Panels and Power Transformers.

o Responsible for the installation of equipment and system power plant grounding.

o Supervise team for the Hi-pot and megger testing of Medium and Low voltage cables.

o Responsible for the Installation of Fiber Optic Cable 1800M long from substation to power plant.

o Supervision of cable tray installation for medium and low voltage cable.

March 17, 2018 to January 20, 2019

Electrical Project In-Charge, LMA trading and Services.- 2.7MW Wartsila W6L32b Genset Installation Project located at 9 Mountain Drive, LISP II, Brgy. La Mesa, 4072 Calamba City (January 15, 2018 up October 2018).

5.5 MW Wartsila PGPRC Power Plant Expansion Located at PGPRC Powerhouse, Bgy. Puro, Aroroy Masbate (March 15 to October 21, 2017) o Responsible for the Quantity take off and Estimate for the Electrical and FDAS Installation Materials.

o Responsible for the Electrical Design and Drawing for Electrical revisions and modifications.

o Give direct task to Electrical foreman for the Cable laying and installation of medium, low voltage, control and instrument cables and wires. o Responsible for the Electrical installation of MV and LV switchgears Control Panels and Power Transformers.

o Responsible for the installation of equipment and system power plant grounding.

o Supervise team for the Hi-pot and megger testing of Medium and Low voltage cables.

November 11, 2015 to March 15, 2017

Electro-Mechanical/MEPF Supervisor, Sta. Clara International Corp. ManoloFortich 2 – Hydro Power Plant Project, Manolo Fortich Bukidnon. o Responsible for Electro- Mechanical works such as dewatering of water seepage for the construction of the weir, conveyance and desander using 30hp submersible pump wye-delta motor.

o Supervise teams for the installation of transmission line for the electrical power supply for the operation of Inlet tunnel area.

o Supervise team for the installation of power supply using 2 units of 500kVA Diesel Generator sets for tunnel operation using 30 units of 30kw blowers w/ VFD, 10 units submersible pump, compressed air for the supply of equipments such as jumbo drill, shotcrete machine and boring equipment. o Responsible for the Quantity take-off and installation for the roughing-ins for the Powerhouse and Switchyard construction.

o Responsible for the installation of grounding system of the 25.4MW powerhouse and substation.

o Prepare daily activity reports and submit to the manager any incident that may occur.

February 27, 2013 to November 5, 2015

Electrical Engineer, PMM Works Inc. PMM Bldg. 200 Carnation St. Don Gregorio Avenue Almanza 1, Las Pinas City Philippines.

(CONSTRUCTION OF MEGC 15MW ZULCHER DIESEL POWER PLANT IN ILIGAN CITY AND ASELCO 5.2 MW WARTSILA DIESEL POWER PLANT IN SAN FRANCISCO AGUSAN DEL SUR)

o Responsible for electrical drawings, specifications, calculations, charts and graphs.

o Preparing Electrical Plans and Design using ACAD design software. o Carry out Estimate and Quantity take-off for Electrical Materials, Grounding System, Fire Alarm System, Telephone system and Emergency lights. o Handled teams of skilled people for the implementation of Electrical lay out, Fire alarm system and Telecommunication system etc. o Responsible for the planning and supervision for the installation of MV switchgear, MCC, Synchronizing panel, Station Transformer, Control Panel. o Preparing cable schedule for cable pulling and termination for instrument, control, LV, relaying and metering cables.

o Initiate Hi-pot testing for MV cable and insulation testing for all of the auxiliary motors.

Summary:

Registered Electrical Engineer with experience in the construction and commissioning of Diesel Power Plant. Switchgears and Systems, Earth Grid Systems, Uninterruptible Power and Battery Systems. Specialties: Power Systems like HV/MV Vacuum type Switchgears & Circuit Breakers, LV Switchboards, Motor Control Centers, Power & Distribution Transformers, Insulated-Phase Buses, UPS & Battery Systems, Power Factor Correction, Harmonic Filters, Power Cable Systems & Raceways, Earthling & Lightning Protection, HV/MV/LV 3-phase Induction & DC Motors & Generators, LV Variable Frequency Drives.

March 10, 2010 to March 10, 2012

Assistant Engineer, United Premas Limited, 750 Chai Chee Road #01-01, SINGAPORE 469000. Holder of FIN # G6400660L.

Managing Agent of SINGTEL DATA CENTER 2 at Kim Chuan road, PayaLebar SINGAPORE.

o Responsible for the operation and maintenance of HVAC particularly water-cooled chillers and Air-cooled chillers.

o Responsible for the operation and Maintenance for the Cooling Towers and air-cooled chiller condenser.

o Responsible for the monitoring the temperature and humidity of the entire SINSTEL DATA CENTER TIER 4 Building clients using BMS and manual testing.

o Responsible for the operation and maintenance of MV switchgear, MCC, Synchronizing panel, Station Transformer, Control Panel. o Responsible for the Preventive & Breakdown maintenance of HT/LT Panels and Switchgears.

o Planning and implementing preventive maintenance schedules of various machineries and instruments to increase machine up time equipment reliability. o Proactively identify areas of obstruction/breakdowns and take steps to rectify the equipment’s through application of trouble shooting tools. o Executing cost saving and energy saving techniques/measures and modifications to achieve substantial reduction in Operation & Maintenance expenditures. Proactively identify areas of obstruction/breakdowns and take steps to rectify

the equipment’s through application of trouble shooting tools. o Executing cost saving and energy saving techniques/measures and modifications to achieve substantial reduction in Operation & Maintenance

December- 2006 to October 2009

Telecom Engineer,Cititel Technologies Incorporated, Rm. 1505 15th floor, Jolibee Condominium Corp., Emerald Ave., Ortigas Center, Pasig City, Philippines. o Responsible for the LOS survey using spectrum analyzer. o Responsible for the installation of Telecom RF cable for IBS project. o Perform the carry out of Electrical and Mechanical installation for the Telecommunication Equipment.

o Responsible for the Installation of Microwave antenna, Omni antenna and panel antenna.

o Responsible for the testing and commissioning of Transceiver and microwave radio equipment.

o Perform the installation for the safety and security alarms for the radio equipment room and link to SCADA system.

o Responsible for the installation of power equipment for Telecommunication such as Rectifier, UPS and Battery bank.

December- 2002 to October 2006

Telecom Engineer, Powertel Construction Corporation, Coronadal South Cotabato o Contractor for Globe Telecom and Suncell Telecom. o Responsible for the microwave survey, Sun cellular HUAWEI 3G AND LTE SURVEY.

o Responsible for the LOS survey using spectrum analyzer. o Responsible for the installation of Telecom RF cable for IBS project. o Perform the carry out of Electrical and Mechanical installation for the Telecommunication Equipment.

o Responsible for the Installation of Microwave antenna, Omni antenna and panel antenna.

o Responsible for the testing and commissioning of Transceiver and microwave radio equipment.

October 2001 to October 2002

Facility Maintenance Technician, PHILCOM CORPORATION (presently PLDT) o Responsible for the Installation and Repair of HVAC, AHU, condenser and evaporator.

o Responsible for the recharging of refrigerant for the split type and window type ACU.

o Responsible for the installation of Evaporator and Condenser Unit particularly copper tube, vacuum and charging of refrigerant. o Perform the Installation of power supply for the evaporator and condenser unit.

o Responsible for the cleaning of evaporator and condenser using aluminum cleaner.

o Responsible for maintenance and repair for the entire HVAC for the entire building.

September 1997 to April 2000

Power System Engineer, Italtel Philippine Branch, Ortigas Center, Pasig City Philippines.

o Main Contractor for DICT NTC-3.National Telecommunication Project for Mindanao Area.

o Perform equipment alarm sensors and security alarms for the automation of the Telecom equipment.

o Responsible for the Installation of Microwave antenna. o Responsible for Microwave antenna panning and alignment. o Implement Job Safety Analysis and Procedures.

o Evaluate and solve problems by eliminating root causes using root cause analysis.

January 20, 1996 to January 20, 1997

Plant Maintenance Electrician, Coca Cola Bottlers Philippines, Lapasan highway, Cagayan de Oro, Philippines.

o Perform the Operation and Maintenance of the Electrical, Electronic and mechanical components (PLC, motor, switchgears, gauge system, etc.) o Carry out trouble-shooting of bottle cleaners, motor for conveyors, line sensors, limit switches and sensors.

o .Plan and redesign hard wire motor controls.

October 02, 1995 to January 16, 1996

Building Construction Electrician, Ultra-tech Construction Corp. Philippine Communication Bldg., Carmen, Cagayan de Oro, Philippines. o Perform Laying out of electrical cables for the power point and lighting for the building construction. Carry out the installation of conduits for the electrical cable passage.

o Install the rough-in ends of auxiliary circuits i.e., fire alarm system and CCTV.

Character Reference: