Post Job Free

Resume

Sign in

Installation Technician Heavy Equipment

Location:
Leland, NC
Posted:
January 13, 2024

Contact this candidate

Resume:

Synopsis of Resume of:

Tracy P. Savage

*** ******** **

S. Bolivia, NC 28422

Phone: 413-***-**** Cell

JOB OBJECTIVE

Telecommunications Technician I Supervisor

EMPLOYMENT

**/*/**** ******* ***lor Davis Construction

Heavy equipment transport for Trac loaders, Excavators, Rollers and pavers Equipment maintained, facilities maintained

Was unemployed due to covid reasons.

4/9/2018 to 11/07/2020 MGM Resorts

Install, maintain and program Gaming equipment 9 different manufactures. 9/01/2009 – 5/1/2017 Ericsson SUS, 400 Taylor Street, Springfield, MA 01105 Installation Technician I Engineer.

Same responsibilities as Sprint Communications; see below. 4/1/1996- 9/1/2009 Sprint Communications, 400 Taylor Street, Springfield, MA 01105 Installation Technician I Engineer.

Supervising and installing communications equipment for wire line and wireless locations throughout New England.

SOSC NOS 3 Senior Technician .

Specialist in difficult installation turn ups, 4 Walls technician familiar or highly experienced on everything within site. Served as trainer to Region 1 sites. Provided a working knowledge and taught classes for RTMS system for site techs and supervisors. 6/1/1995 – 4/1/1996 Aerotech, Inc., 6835 Deerpath Road, Baltimore, MD 21227 Contract labor for Sprint Communications.

Install and turn up sonnet fiber optic rings, Frame relay equipment and other fiber optic terminal equipment.

3/1993 – 05/01/1995 Pierson Industries, 17 Wilson Street, Palmer MA 01069 Second shift Industrial Electrician.

Electrically maintained 21 plastic extruders and their associated control systems, solved electrical and electronic problems, and machine shop experience. 03/1991 - 01/1993 Cascades H.B.A., First Street, Palmer, MA 01069 Electronic and electrical maintenance and design of web manufacturing line. PLC programming and design on Siemans and Modicon systems. AutoCAD drafting of electrical circuits and their associated mechanical parts.

Miscellaneous Employment

03/01/1995 – 04/01/1996 Valley Communications, First Street, Chicopee, MA Install and service voice and data lines.

Part time.

03/1989-10/1990 Ludlow Savings Bank, 33 Center Street, Ludlow, MA Computer Operator- Evening Supervisor

Part time.

Education

1991-1994 Springfield Technical Community College, Springfield, MA Electrician's Licensing Courses

AutoCAD Version 12 Levels 1 &2

1996-present Sprint Communications ( see amplification of resume)

/

Amplified Resume:

4/9/18 to 11/07/2020 MGM Resorts

Install, maintain and program Gaming equipment.

Move and connect new and existing games. Configure games to Massachusetts parameters. Tier 2 support for customer issues and discussions.

09/2009-05/01/2017 ERICSSON SUS

Tracy P. Savage

EMPLOYMENT HIGHLIGHTS

9/09-present: Reassigned to Ericsson from Sprint. Continuing with installation and more responsibilities for

project management and execution. Currently finishing a 15 node reconfigure from Cisco ONS to Ciena

CN4200.

04/01/1996-09/01/2009

SPRINT COMMUNICATIONS

04/1996-09/1997: Site Technician Springfield. New circuit turn up,Tl testing, and DS3 turn up and test.

Rearranges to sonnet rings from asynchronous equipment. 09/1997-09/1999: SOSC remote technician. Trouble ticket and new circuit turn up. Special team performing MF to SS7 conversion for whole Sprint PCS network nationwide. The PCS project team was given the liberty to execute the conversions as we saw fit, therefore expediting the process. 09/1999-2000: Brought back to site 1 day a week initially to set up site computers and train site technicians and supervisor in the use of RTMS. Later brought back to site to hold down RTMS site functions. Requests were made to train other sites. I have traveled to other sites training technicians and supervisors in all functions of RTMS.

2000- 2017: Install, configure, and turn up the following: Telabs 532, 5500, and 6500; SME 5500 and 6500; Cisco 6509, 6513, 7500, and 12000 routers; Cisco 15454 and associated subsystems

(SME); Battery plant builds, additions, and supervising vender installation; Supervised my own contract installation crews of eight plus. Responsible for thirty plus projects simultaneously. Training at Sprint Communications

04/1996 Nortel DMS 250 switch training

06/01/1999 Telabs 6500 installation & operations training 02/2000 Cisco 15454 installation & programming

05/2004 Ciena core stream installation & programming 06/01/1995-04/01/1996

AEROTEK. INC.

Contract labor for Sprint Communications starting in Springfield, MA installing Frame relays. Performing

power, DS 1 wiring and required steel work. Agreed to travel in New England and became involved sonnet ring installation, configuration, and testing. I was doing start to finish on sonnet rings. Supervised

battery work in various locations in NE.

03/1993-05/1995

PIERSON INDUSTRIES

Hired as an electrician on second shift to resolve any electrical and small mechanical problems that may

arise. Responsibilities included replacing aging treater and extruder drives, and bench testing of drives

and heat controls for repair. In 1994, was responsible for installing a quarter million dollar project to add

PLC driven blenders.

03/1991-01/1993

CASCADES H.B.A.

Hired as an electrical and electronic technician who maintained web process converting lines which manufactured adult disposable diapers. Responsibilities included the maintenance, design, and modification of Siemens and Modicon PLCs, AC and DC drives, hot melt glue systems, and automated

packaging equipment. Used AutoCAD to design small parts and electrical drawings. Was placed in charge of the electrical and electronic portions of a $70,000 machine move and automation improvements on this line. Had direct control of purchasing electrical parts and computers. During the summer of 1992, supervised the electrical portion of a $250,000 overhaul of a machine. Supervised crews of six or more for weekend maintenance. Used jet lathe, Bridgeport, band saws, Arc welders, and various other tools for fabricating of machine parts. Training at Cascades H.B.A.

06/1991 Allen Bradley AC frequency drives seminar

06/1991 Modicon training Pl 90 programmer & 884 PLC 07/1991 Siemens training P875 programmer & 100 series PLC 09/1991 Allen Bradley DC servo and control seminar 07/1992 Siemens PLC programming at Siemens Training Center, Atlanta, GA Miscellaneous Employment Highlights

03/01/1995-04/01/1996

VALLEY COMMUNICATIONS

Install and service data communications services, systems such as Novel. Telephone installation and Maintenance for NEC Systems.

03/1989-10/1990

LUDLOW SAVINGS BANK

Evening computer supervisor responsible for printing reports and statements, and backing up system.

/

REFERENCES

On Request



Contact this candidate