Post Job Free

Resume

Sign in

Room attendant

Location:
Reno, NV
Salary:
40000
Posted:
January 10, 2024

Contact this candidate

Resume:

BRIEF PROFILE

Name : RAMESH KUMAR.

Date of Birth : 04.04.1957.

Nationality : Indian.

Email Id. : ad2noc@r.postjobfree.com

Contact No. : +1-916-***-****

Discipline : Electrical

Languages known : English,Hindi, Punjabi

Experience : 22 years 6 month

Period

Company/Project

Position

Duration

Location

May 2012~

March 16

Hanwha Eng.& Cont. Co. Kuwait.

(Up-gradation of fire alarm and gas suppression

Systems in KNPC Mina Abdulla Refinery)

Electrical

Supervisor

3 Y 10 M

Kuwait

April 2010~

Feb. 2011

Daewoo E & C Co. Ltd. Doha, Qatar.

(Nakilat Ship repair yard project)

Electrical

Supervisor

11 M

Qatar

April 2009~

LolApril 2010

Daewoo E & C Co. Ltd. Doha, Qatar.

Q- Chemical ll (Ethylene Derivatives project)

Electrical

Foreman

1 Y

Qatar

Aug. 2007~

March 2009

Daewoo E & C Co. Ltd. Doha, Qatar.

(Laffan Refinery project)

Electrical

Foreman

1 Y 8 M

Qatar

Oct. 2004~

April 2006

Hyundai E & C Co. Ltd, Libya.

( NC – 41, Western Libya Gas project)

Plant

Electrician

1 Y 7 M

Libya

May 2001~

Aug. 2004

Verma Electrical Workshop, Khanna,

Punjab, India.

Plant

Electrician

3 Y 4 M

India

Dec. 1998~

April 2001

Middle East Eng.& Dev. Co.Ltd, Saudi Arabia.

(Central Power Plant Extension project)

Plant

Electrician

2 Y 5 M

K.S.A.

June 1996~!

April 1998

Hyundai E & C Co. Ltd, Libya.

( Substation project)

Plant

Electrician

2 Y

Libya

Feb. 1994~

Jan 1996

Middle East Engg& Dev. Co.Ltd, Saudi Arabia.

(132 KV Substation project)

Plant

Electrician

2 Y

K.S.A.

May 1990~

April 1992

Hyundai E & C Co. Ltd, Saudi Arabia.

( Makkah-Taif Power station project)

Plant

Electrician

2 Y

K.S.A.

July 1988~

March 1990

Hyundai E & C Co. Ltd, Saudi Arabia.

( Makkah-TaifPower station project)

Plant

Electrician

1 Y 9 M

K.S.A.

TOTAL

22 Y 6 M

Name : RAMESHKUMAR.

Contact No. : +91-911*******.

Email Id. : ad2noc@r.postjobfree.com

Objectives and Goals.

Expecting a challenging and dynamic career in Electrical site supervising where I can apply my knowledge and skill development. To work in a company with an effective environment conductive for personnel success, intellectual growth, career advancement and to achieve a position that would offer job satisfaction and channels for knowledge gained.

List of Function.

●Approved as an Electrical Construction Supervisor from KNPC project department.

●Holding KNPC work permit awareness card.

●Approved as a confined space entrant.

Educational Qualification.

●Diploma in Electrical Engineering.

●High school certificate from Punjab School Education Board, Chandigarh, Punjab, India.

Summary of Professional Experience.

11 .Project handled:

Worked with Hanwha Eng. & Const. Co. (Korea) at KUWAIT for Up-gradation of Obsolete Fire Detection, Alarm and suppression systems including phase-out of halonat Kuwait National Petroleum Co. (KNPC) Refineries as an Electrical Supervisor from May 2012 to March 2016.

Duties and Responsibilities:

●Preparing site working schedules and work permits.

●Executing work as per KNPC safe work practices and giving prime priority on safety.

●Giving daily tool box talk to co-workers regarding work related hazards and its precautions.

●Independently follow up site construction works with client, safety department and vendor.

●Assist Engineering design team for updating drawings as per site condition.

● U/G cable route marking with co-ordinates, u/g cable laying and cable termination as per KNPC standard.

●Laying of Fiber Optic cables for fire alarm communication network.

●Rigid conduiting works in process plants, substations and control rooms.

●Installation of Explosion proof Junction boxes, sirens and its termination in process plants.

●Installation of Fire alarm panels, gas suppression system panels, Aspirating high sensitivity smoke sensing systems panels and its wiring.

●Installation of Explosion proof UV/IR detectors and manual call points in process plants.

●Installation and termination of smoke detectors, heat detectors, manual call points, sounder strobes, controlling modules in substation, control rooms & buildings.

●Assist commissioning team for the function test of fire alarm, gas suppression and aspirating systems.

●Reporting to senior for daily achievements and upcoming expected targets.

●Preparing as built drawings as per site condition.

●Loop checking and troubleshooting of fire alarm system.

10 .Project handled:

Worked with Daewoo E & C Co. Ltd (Korea) as an Electrical Supervisor for Nakilat Ship Repair yard project at Doha, Qatar. from April 2010 to February 2011.

Duties and Responsibilities:

●Installation of 6.6 KV switchgears and low voltage panels.

●Fabrication &Installation of cable trays for power and control cables.

●Cable laying, cable glanding & termination of medium voltage cables.

●Trouble shooting of switch gear and control panels.

●Carried out function test of power transformers and switch gears.

●Installation of power receptacles and its cable termination.

●Installation of bus bars and bus ducts.

●Preparation and Installation of earthing system.

9 .Project handled:

Worked with Daewoo E & C Co. Ltd (Korea) as an Electrical Foreman in Chemical plant of Q-chemical ll, Doha, Qatar for Ethylene Derivatives project fromApril 2009 toApril 2010.

Duties and Responsibilities:

●Fabrication and fixing of cable trays with accessories & supports.

●Laying of U/G cables, testing and termination.

●Rigid conduiting works and installation of EP type JB’s.

●Cable glanding, termination and control wiring as per the drawings.

●Erection of lighting poles and installation of light fittings.

●Giving brief speech to workers for their job and daily target.

●Preparing progress report on daily basis.

●Follow up inspection activities with QA/QC personnel’s and client.

8 .Project handled:

Worked with Daewoo E & C Co. Ltd (Korea) as an Electrical Foreman for Laffan Refinery Project at Doha, Qatar. from August 2007 to March 2009.

Duties and Responsibilities:

●Fabrication & Installation of cable trays for power and control cables with supports.

●Installation of conduits for controls, lighting and fire alarm systems.

●Installation of raceway for lighting.

●Installation of explosion proof type lighting, power and instrument receptacles.

●Preparation and Installation of grid earthing system in the process plant.

●Installation of switch gears, panels and bus ducts inside substation.

●Preparing schedule for daily and weekly activities.

●Arranging materials as per site requirement.

●Reporting to senior for daily achieved target.

●Assist design team to prepare as built drawings.

7 .Project handled:

Worked with Hyundai E & C Co. Ltd. (Korea) as Plant Electrician in Libya for NC-41 Western Libya Gas Project from October2004 to April 2006.

Duties and Responsibilities:

●Assist engineers for pre-commissioning activities of medium voltage switch gears and low voltage panels.

●Maintenance of UPS systems, station batteries in control rooms and substation.

●Operation & Maintenance of electrical motors, air compressors and motor starters.

●Preparing daily activity log of medium voltage substation.

●Periodic maintenance of power transformers and switchgears.

●Energizing/de-energizing HT/LT motors & control valves as per client requirement after getting proper work permits.

●Trouble shooting of control circuits.

●Periodic checking of plant earthing system and measuring grid values.

●Preparing schedule for shutdown maintenance works.

●Close monitoring of substation functions.

●Co-coordinating with other maintenance department for timely rectification of break down equipment’s.

●Attending safety refreshment classes.

●Routine maintenance of substation DG sets.

6 .Project handled:

Worked with Verma Electrical Workshop as a Plant Electrician at Punjab, India. from May 2001 to August 2004.

Duties and Responsibilities:

●Installation conduits, cable trays, bus ducts for multi- storied commercial buildings and shopping malls.

●Erection of Power transformers with associated controls, testing and commissioning.

●Installation of fire alarm/fire protection systems, wiring and fixing of lighting panels in multi-storied buildings, commercial complexes, shopping malls, multi-plexes, warehouses and cold storages.

●Overhauling of electric motors.

5 .Project handled:

Worked with Middle East Engineering & Development Co. Ltd. as a Plant Electrician in Saudi Arabia for Central Power Plant Extension Project from December 1998 to April 2001.

Duties and Responsibilities:

●U/G cable laying, dressing, tagging as per the drawings and schedules.

●Assist QC personals and client for Inspection.

●Rigid conduiting and installation of plant JB’s for lighting, fire alarm & instrument controls.

●Installation of grid earthing and cad welding.

●Wiring and termination of light fixtures, fire alarm devices.

●Cable glanding, testing and termination for power & control cables.

4 .Project handled:

Worked with Hyundai E & C Co. Ltd. (Korea) as a Plant Electrician in Libya for substation Project from June 1996 to April 1998.

Duties and Responsibilities:

●Fabrication & Installation of cable trays for power and control cables.

●Installation of power receptacles and its cable termination.

●Installation of bus bars and bus ducts.

●Preparation and Installation of earthing system.

●Rigid conduiting works in process plants, substations and control rooms.

●Installation of Explosion proof Junction boxes, sirens and its termination in process plants.

●Cable glanding, testing and termination for power & control cables.

●Control wiring as per drawings & schedules.

3 .Project handled:

Worked with Middle East Engineering & Development Co. Ltd. as a Plant Electrician in Saudi Arabia for 132 KV Substation Project from February 1994 to January 1996.

Duties and Responsibilities:

●Installation and pre-commissioning of Gas insulated switchgears.

●Erection of Power transformers.

●Control cable termination as per drawings and schedules.

●Power cable laying, testing, glanding& termination.

●Installation of substation earthing system.

●Installation of substation bus ducts.

●Rigid conduiting for lighting, fire alarm and control cables.

●Fabrication and fixing of cable trays with accessories & supports.

●Installation of grid earthing and cad welding.

2 .Project handled:

Worked with Hyundai E & C Co. Ltd. (Korea) as a Plant Electrician in Saudi Arabia for Makkah - Taif Power & Desalination PlantProject fromMay 1990 to April 1992.

Duties and Responsibilities:

●Operation and maintenance of HT/LT motors & overhead cranes.

●Maintenance & trouble shooting of sum-pumps.

●Checking of plant earthing system and measuring grid values.

●Assist engineers for commissioning activities.

●Operation & maintenance of diesel generators.

1 .Project handled:

Worked with Hyundai E & C Co. Ltd. (Korea) as a Plant Electrician in Saudi Arabia for Makkah-Taif Power & Desalination Plant Project fromJuly 1988 to March 1990.

Duties and Responsibilities:

●Installation of main earthing system & Cad welding.

●Erection of power transformers.

●Installation of HV/LV panels and switchgears.

●Cable glanding, testing and termination for power & control cables.

●Rigid conduiting and installation of plant JB’s for lighting, fire alarm & instrument controls.

●Control cable termination as per drawings and schedules.

Training Courses Attended.

●Work permit awareness of KNPC.

●Confined Space Entry &Attendant in KNPC.

●Scaffolding safety and work at height.

●H2S awareness.

●Excavation safety.

●BBS, Sub standard act & Sub standard condition.

Declaration:

I hereby declare that the above mentioned details about me are true and correct to the best of my knowledge and belief.

Yours faithfully,

RAMESH KUMAR.



Contact this candidate