BRIEF PROFILE
Name : RAMESH KUMAR.
Date of Birth : 04.04.1957.
Nationality : Indian.
Email Id. : ad2noc@r.postjobfree.com
Contact No. : +1-916-***-****
Discipline : Electrical
Languages known : English,Hindi, Punjabi
Experience : 22 years 6 month
Period
Company/Project
Position
Duration
Location
May 2012~
March 16
Hanwha Eng.& Cont. Co. Kuwait.
(Up-gradation of fire alarm and gas suppression
Systems in KNPC Mina Abdulla Refinery)
Electrical
Supervisor
3 Y 10 M
Kuwait
April 2010~
Feb. 2011
Daewoo E & C Co. Ltd. Doha, Qatar.
(Nakilat Ship repair yard project)
Electrical
Supervisor
11 M
Qatar
April 2009~
LolApril 2010
Daewoo E & C Co. Ltd. Doha, Qatar.
Q- Chemical ll (Ethylene Derivatives project)
Electrical
Foreman
1 Y
Qatar
Aug. 2007~
March 2009
Daewoo E & C Co. Ltd. Doha, Qatar.
(Laffan Refinery project)
Electrical
Foreman
1 Y 8 M
Qatar
Oct. 2004~
April 2006
Hyundai E & C Co. Ltd, Libya.
( NC – 41, Western Libya Gas project)
Plant
Electrician
1 Y 7 M
Libya
May 2001~
Aug. 2004
Verma Electrical Workshop, Khanna,
Punjab, India.
Plant
Electrician
3 Y 4 M
India
Dec. 1998~
April 2001
Middle East Eng.& Dev. Co.Ltd, Saudi Arabia.
(Central Power Plant Extension project)
Plant
Electrician
2 Y 5 M
K.S.A.
June 1996~!
April 1998
Hyundai E & C Co. Ltd, Libya.
( Substation project)
Plant
Electrician
2 Y
Libya
Feb. 1994~
Jan 1996
Middle East Engg& Dev. Co.Ltd, Saudi Arabia.
(132 KV Substation project)
Plant
Electrician
2 Y
K.S.A.
May 1990~
April 1992
Hyundai E & C Co. Ltd, Saudi Arabia.
( Makkah-Taif Power station project)
Plant
Electrician
2 Y
K.S.A.
July 1988~
March 1990
Hyundai E & C Co. Ltd, Saudi Arabia.
( Makkah-TaifPower station project)
Plant
Electrician
1 Y 9 M
K.S.A.
TOTAL
22 Y 6 M
Name : RAMESHKUMAR.
Contact No. : +91-911*******.
Email Id. : ad2noc@r.postjobfree.com
Objectives and Goals.
Expecting a challenging and dynamic career in Electrical site supervising where I can apply my knowledge and skill development. To work in a company with an effective environment conductive for personnel success, intellectual growth, career advancement and to achieve a position that would offer job satisfaction and channels for knowledge gained.
List of Function.
●Approved as an Electrical Construction Supervisor from KNPC project department.
●Holding KNPC work permit awareness card.
●Approved as a confined space entrant.
Educational Qualification.
●Diploma in Electrical Engineering.
●High school certificate from Punjab School Education Board, Chandigarh, Punjab, India.
Summary of Professional Experience.
11 .Project handled:
Worked with Hanwha Eng. & Const. Co. (Korea) at KUWAIT for Up-gradation of Obsolete Fire Detection, Alarm and suppression systems including phase-out of halonat Kuwait National Petroleum Co. (KNPC) Refineries as an Electrical Supervisor from May 2012 to March 2016.
Duties and Responsibilities:
●Preparing site working schedules and work permits.
●Executing work as per KNPC safe work practices and giving prime priority on safety.
●Giving daily tool box talk to co-workers regarding work related hazards and its precautions.
●Independently follow up site construction works with client, safety department and vendor.
●Assist Engineering design team for updating drawings as per site condition.
● U/G cable route marking with co-ordinates, u/g cable laying and cable termination as per KNPC standard.
●Laying of Fiber Optic cables for fire alarm communication network.
●Rigid conduiting works in process plants, substations and control rooms.
●Installation of Explosion proof Junction boxes, sirens and its termination in process plants.
●Installation of Fire alarm panels, gas suppression system panels, Aspirating high sensitivity smoke sensing systems panels and its wiring.
●Installation of Explosion proof UV/IR detectors and manual call points in process plants.
●Installation and termination of smoke detectors, heat detectors, manual call points, sounder strobes, controlling modules in substation, control rooms & buildings.
●Assist commissioning team for the function test of fire alarm, gas suppression and aspirating systems.
●Reporting to senior for daily achievements and upcoming expected targets.
●Preparing as built drawings as per site condition.
●Loop checking and troubleshooting of fire alarm system.
10 .Project handled:
Worked with Daewoo E & C Co. Ltd (Korea) as an Electrical Supervisor for Nakilat Ship Repair yard project at Doha, Qatar. from April 2010 to February 2011.
Duties and Responsibilities:
●Installation of 6.6 KV switchgears and low voltage panels.
●Fabrication &Installation of cable trays for power and control cables.
●Cable laying, cable glanding & termination of medium voltage cables.
●Trouble shooting of switch gear and control panels.
●Carried out function test of power transformers and switch gears.
●Installation of power receptacles and its cable termination.
●Installation of bus bars and bus ducts.
●Preparation and Installation of earthing system.
9 .Project handled:
Worked with Daewoo E & C Co. Ltd (Korea) as an Electrical Foreman in Chemical plant of Q-chemical ll, Doha, Qatar for Ethylene Derivatives project fromApril 2009 toApril 2010.
Duties and Responsibilities:
●Fabrication and fixing of cable trays with accessories & supports.
●Laying of U/G cables, testing and termination.
●Rigid conduiting works and installation of EP type JB’s.
●Cable glanding, termination and control wiring as per the drawings.
●Erection of lighting poles and installation of light fittings.
●Giving brief speech to workers for their job and daily target.
●Preparing progress report on daily basis.
●Follow up inspection activities with QA/QC personnel’s and client.
8 .Project handled:
Worked with Daewoo E & C Co. Ltd (Korea) as an Electrical Foreman for Laffan Refinery Project at Doha, Qatar. from August 2007 to March 2009.
Duties and Responsibilities:
●Fabrication & Installation of cable trays for power and control cables with supports.
●Installation of conduits for controls, lighting and fire alarm systems.
●Installation of raceway for lighting.
●Installation of explosion proof type lighting, power and instrument receptacles.
●Preparation and Installation of grid earthing system in the process plant.
●Installation of switch gears, panels and bus ducts inside substation.
●Preparing schedule for daily and weekly activities.
●Arranging materials as per site requirement.
●Reporting to senior for daily achieved target.
●Assist design team to prepare as built drawings.
7 .Project handled:
Worked with Hyundai E & C Co. Ltd. (Korea) as Plant Electrician in Libya for NC-41 Western Libya Gas Project from October2004 to April 2006.
Duties and Responsibilities:
●Assist engineers for pre-commissioning activities of medium voltage switch gears and low voltage panels.
●Maintenance of UPS systems, station batteries in control rooms and substation.
●Operation & Maintenance of electrical motors, air compressors and motor starters.
●Preparing daily activity log of medium voltage substation.
●Periodic maintenance of power transformers and switchgears.
●Energizing/de-energizing HT/LT motors & control valves as per client requirement after getting proper work permits.
●Trouble shooting of control circuits.
●Periodic checking of plant earthing system and measuring grid values.
●Preparing schedule for shutdown maintenance works.
●Close monitoring of substation functions.
●Co-coordinating with other maintenance department for timely rectification of break down equipment’s.
●Attending safety refreshment classes.
●Routine maintenance of substation DG sets.
6 .Project handled:
Worked with Verma Electrical Workshop as a Plant Electrician at Punjab, India. from May 2001 to August 2004.
Duties and Responsibilities:
●Installation conduits, cable trays, bus ducts for multi- storied commercial buildings and shopping malls.
●Erection of Power transformers with associated controls, testing and commissioning.
●Installation of fire alarm/fire protection systems, wiring and fixing of lighting panels in multi-storied buildings, commercial complexes, shopping malls, multi-plexes, warehouses and cold storages.
●Overhauling of electric motors.
5 .Project handled:
Worked with Middle East Engineering & Development Co. Ltd. as a Plant Electrician in Saudi Arabia for Central Power Plant Extension Project from December 1998 to April 2001.
Duties and Responsibilities:
●U/G cable laying, dressing, tagging as per the drawings and schedules.
●Assist QC personals and client for Inspection.
●Rigid conduiting and installation of plant JB’s for lighting, fire alarm & instrument controls.
●Installation of grid earthing and cad welding.
●Wiring and termination of light fixtures, fire alarm devices.
●Cable glanding, testing and termination for power & control cables.
4 .Project handled:
Worked with Hyundai E & C Co. Ltd. (Korea) as a Plant Electrician in Libya for substation Project from June 1996 to April 1998.
Duties and Responsibilities:
●Fabrication & Installation of cable trays for power and control cables.
●Installation of power receptacles and its cable termination.
●Installation of bus bars and bus ducts.
●Preparation and Installation of earthing system.
●Rigid conduiting works in process plants, substations and control rooms.
●Installation of Explosion proof Junction boxes, sirens and its termination in process plants.
●Cable glanding, testing and termination for power & control cables.
●Control wiring as per drawings & schedules.
3 .Project handled:
Worked with Middle East Engineering & Development Co. Ltd. as a Plant Electrician in Saudi Arabia for 132 KV Substation Project from February 1994 to January 1996.
Duties and Responsibilities:
●Installation and pre-commissioning of Gas insulated switchgears.
●Erection of Power transformers.
●Control cable termination as per drawings and schedules.
●Power cable laying, testing, glanding& termination.
●Installation of substation earthing system.
●Installation of substation bus ducts.
●Rigid conduiting for lighting, fire alarm and control cables.
●Fabrication and fixing of cable trays with accessories & supports.
●Installation of grid earthing and cad welding.
2 .Project handled:
Worked with Hyundai E & C Co. Ltd. (Korea) as a Plant Electrician in Saudi Arabia for Makkah - Taif Power & Desalination PlantProject fromMay 1990 to April 1992.
Duties and Responsibilities:
●Operation and maintenance of HT/LT motors & overhead cranes.
●Maintenance & trouble shooting of sum-pumps.
●Checking of plant earthing system and measuring grid values.
●Assist engineers for commissioning activities.
●Operation & maintenance of diesel generators.
1 .Project handled:
Worked with Hyundai E & C Co. Ltd. (Korea) as a Plant Electrician in Saudi Arabia for Makkah-Taif Power & Desalination Plant Project fromJuly 1988 to March 1990.
Duties and Responsibilities:
●Installation of main earthing system & Cad welding.
●Erection of power transformers.
●Installation of HV/LV panels and switchgears.
●Cable glanding, testing and termination for power & control cables.
●Rigid conduiting and installation of plant JB’s for lighting, fire alarm & instrument controls.
●Control cable termination as per drawings and schedules.
Training Courses Attended.
●Work permit awareness of KNPC.
●Confined Space Entry &Attendant in KNPC.
●Scaffolding safety and work at height.
●H2S awareness.
●Excavation safety.
●BBS, Sub standard act & Sub standard condition.
Declaration:
I hereby declare that the above mentioned details about me are true and correct to the best of my knowledge and belief.
Yours faithfully,
RAMESH KUMAR.