Self-driven, collaborative, leader with strong, task-oriented organizational skills.

QUALIFICATIONS

●25 years of experience in:

oCommercial/residential customer service

oField construction supervision including: pre-construction planning, job hazard analysis, work sequencing of all trade work, field work supervision

oImplementing policies to insure safe working environments

oAnalyzing project plans and specifications

oCoordinating work of all trades

oQuantity take-off and conceptual estimating

●Extensive knowledge of contract documents

●All-encompassing knowledge of concrete forming systems and procedures, including post tension, elevated slab forming systems, and field installation experience.

●Energetic, goal oriented team leader

●Positive demeanor in every task that is assigned

●Strong critical thinking skills

EDUCATION

1990 La Salle Catholic College Preparatory Milwaukie, OR High School Diploma

1991 Marine Corps Engineer School Camp Legume, NC

Marine Corps Combat Engineer

2008-2011 Clackamas Community College Oregon City, OR

CERTIFICATION/TRAINING

Fall Protection Trained

HAZMAT Trained

Protocol Level 4 Cleanroom Trained

Certified Rigger

OSHA 10

CIVIS Team Member

Collaborative Leadership Conference Participant

WORK EXPERIENCE

2021-present

Progress Residential

Make Ready Superintendent

Build scopes of work for make ready and rennovation scopes.

Manage projects from scope to rent ready.

Complete rent ready's and create punch lists

Manage punch lists to completion.

Use Reno-walk to create scopes.

2019-2020 Las Vegas Paving Corps

Carpenter Las Vegas, NV

Participation in the building of bridges and overpasses.

2017-2019 Kiewit Infrastructures

Carpenter Las Vegas, NV

Participation in the demolition and construction of 19 bridges during Project Neon.

2016-2017 McCarthy Builders

General Foreman Winnemucca, NV & Las Vegas, NV

Field supervision of the building process from start to finish of a water reclamation center and UNLV Hospitality building, respectively.

2015 - 2016 Skanska Construction Vancouver, WA

Field Supervisor/ Post Tension Deck foreman

Supervised different crews in the building process of three separate, concrete, multi-story buildings, including footings, columns, shear walls, and elevated post tension slabs. Daily coordination of all work between trades i.e. Ironworkers, electricians, plumbers, excavation, interior and exterior framers. Led daily pre-task planning and toolbox safety meetings. Verified, and passed down information of installation of rebar, post tension cables, embeds, and utility inserts, and inspected for quality.

2011-2014 PCI

Foreman/Nighttime Sup. Intel/Ronler Acres

Hillsboro, OR

Rigging foreman, Material Foreman, Nighttime Supervisor at Intel D1X Mod 1, Mod 1b and Mod 2. Trained all hands in PRE-TASK PLANNING and proactively supported crew in the utilization of them. Trained all hands in jobsite safety, use of aerial lifts, scissor lifts, forklifts, all terrain forklifts, working scaffolds. Maintained, supported and filed all operator certifications, inspections (i.e. daily, weekly, monthly and sometimes hourly, if task required). Trained all hands in crane safety, proper crane rigging, crane signaling, writing pre-hoist and critical pic plans, rigging safety, proper rigging inspection and storage. Supervised and supported all hands and crews in many daily critical crane picks, as well as managing daily unexpected obstacles and made appropriate adjustments. Was responsible for guiding all vendor delivery trucks onto the Ronler Acres Campus and into the proper offload dock in a safe and clean manner. Offload components, inventory, inspect for quality, clean (as per protocol) and mobilize to fab installation area via elevator, material dumbwaiter, and crane. Kept very strict inventories of all trucks, invoices and then passed on to jobsite project manager. PROTOCOL: trained all hands in cleanroom environment. Ensured all components were cleaned to protocol level specifications, passed through designated clean environments, and tracked to installation. Supported all hands in working in a safe, clean, efficient manner. Reported daily to Hoffman Superintendent, Hoffman Safety officer of manpower, crane schedule, incoming trucks and components, and kept strict records of such.

2009-2011 RSL Construction

Manager/CEO Portland, OR

Job development, cost estimation, excavation, field superintendent, contracts, customer service, quality control, pre-construction planning, scheduling, budgeting, analyzing plans and specs, and purchasing etc.

2007-2009 SAK Construction

General Foreman/Field Supt. Portland, OR

Supervised 45 man crew in all aspects of building process i.e. self-perform concrete shear walls, columns and post tension, elevated decks. Maintained a safe work environment with a proactive attitude, which translated into a positive culture amongst all crew members. Ensured quality control of all work as well as passed down information to the crew members and subcontractors. Coordinated and sequenced work amongst trades, as well as vendor deliveries and oversaw all tower crane hoisting, as well as tower crane schedule.

2005-2007 Turner Construction

Concrete Lead Form Carpenter Portland, OR

Set and stripped concrete formwork, columns, shear walls, and elevated post tension deck formwork. Rigged and hoisted loads as needed, including alumna-systems flyer tables. Established and executed layout for edge of slab, embeds as well as grade and post tension tendons. Worked with a positive, proactive, safe attitude

2004-2005 Howard S. Wright

Concrete Form Carpenter Portland, OR

1999-2004 CECO Concrete Construction

Carpenter Foreman/ Field Supt. Portland, OR/Seattle, WA

Lead crew in all field operations that involved the concrete structural building process from footing foundation to concrete top off. Oversaw all formwork and stripping of shear walls, elevator cores, columns, and post tension elevated decks. Detailed formwork, embeds, slab edge, block outs and post tension tendon layouts. Lead crew in daily safety meetings, crane hoisting and crane schedule.

1999-1999 Walsh Construction

Concrete Carpenter Portland, OR

Established and executed building layout, elevated post tension slab and vertical concrete form work, rebar template layout, job site safety inspections, company/union relations, and tower crane rigging and signaling

1998-1999 McClone Construction

Carpenter Foreman Seattle, WA

Supervised crews specializing in post tension, elevated slab, vertical column and shear wall forming, pouring and stripping. Executed crane schedule, material movement, quality control, time sheets, and implemented safety measures.

1990-1998

United States Marine Corps Reserves Camp Pendleton, CA

Combat Engineer Camp legume, NC

Trained in combat operations, demolition/explosive ordinances, minefield warfare, security operations, leadership, construction, core values, physical training and overall combat readiness.

ACTIVITIES

1996 & 1997

Oregon Golden Gloves Champion

1997-2007

Professional Boxer

2007-Present U.S. Mission

Holiday Volunteer

2007-Present Grace, Mercy, and Favor Ministries

Board Member

Volunteer Las Vegas Rescue Mission

2016 - Present

PROJECT EXPERIENCE LIST:

Intel: D1D, D1X, D1X Mod 1 & Mod 1B, DIX Mod 2

Rose Garden Arena

Hilton Hotel-Portland

Microsoft-Seattle

Tanner Place-Portland

Streetcar Lofts-Portland

Kirkland Manor-Portland

Seattle-Tacoma Prison

Seattle-Tacoma Airport

REI

Ladd Tower

Clackamas Light Rail Project

**FOR A COMPLETE LIST PLEASE EMAIL OR CALL**