Post Job Free

Resume

Sign in

First Class Highway Engineer

Location:
Coimbatore, Tamil Nadu, India
Posted:
January 06, 2024

Contact this candidate

Resume:

CURRICULAM – VITAE

Proposed Position : Highway Engineer

Name : P.Devaraji

Date of Birth : 02-07-1973 (49 yr.’s)

Specialization : Highway Engineering

Education : B. Tech (Civil Engineering)

Years of Experience : 32 Years

E Mail : ad2hs2@r.postjobfree.com,

ad2hs2@r.postjobfree.com

Mobile no : 902-***-****, 850-***-****

Languages Known : English, Tamil, Hindi and Telugu

Educational Qualification

Name of Exams Passed/ year

University/Board

% of Marks/Class Obtained

SSLC (1987)

Secondary Board of Education

62% - First Class

DCE (1991)

Technical Board, Chennai

73% - First Class

B.TECH (2010)

RVD University, Udaipur

67% - First Class

Key Qualification:

In Highway Engineering as specialization, having 32 years of professional experience-( Diploma With 19 years & B.tech with 13 Years) in the field of Construction supervision of Roads, Bridges, CD works and other civil works of Projects funded by ADB,World Bank, Self-financing as DBFOT and BOQ packages. I have been extensively engaged in construction supervision, quality control and material testing for Road works, by conducting various tests as per procedures and specifications. Major thrust area comes under various components of flexible and rigid pavement such as, Embankment, Subgrade, sub Base, Base course and bituminous works, DLC and PQC with advance equipments and automatic sensor paver finishers confirming to MORT&H specifications.

My professional experience also covers quantity calculation, cost estimation, work verification as per contract agreement and specification and monitoring the execution of works, quality assurance and conducting various tests as per specifications. Well conversant with IS, IRC guidelines, MORT&H specifications and FIDIC conditions of contract.

Some of the major assignments are:

1)Authority Engineer in Upgradation of Tiruchendur-Palayamkottai-Ambsamudram section of SH 40I under CKICP in EPC mode- Km 0+750 to Km 51+340 ( Including Bypass from Km 25/600 to Km 39/500) – 533.24 crs.- ADB Funded

2)Authority Engineer in Up Gradation of Vriddhachalam – Ulundurpettai Road of SH 69 in Tamil Nadu under EPC mode of CKICP- Km 0+000 to km 21+400-Asian Development Bank Aided project-Cost- 162.50 Crores.

3)Authority Engineer in Up Gradation of Vriddhachalam – Parangipettai Road of SH 70 in Tamil Nadu under EPC mode of TNRSP- Km 0+000 to km 35+800-World Bank Aided project-Cost- 162.43 Crores.

4)Built, Operate and Transfer ( DBFOT )-IE SERVICES - FOUR LANNING OF TIRUPATI - TIRUTANI - CHENNAI SECTION OF NH-205 FROM KM. 274+800 TO KM 341+600 IN THE STATE OF ANDHRA PRADESH AND FROM KM 0+000 TO KM 59+600 IN THE STATE OF TAMIL NADU ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) TOLL BASIS- Project Cost – 434.26 Crores.

5)Built, Operate and Transfer ( DBFOT) –IE SERVICES - concessionaire – Navayuga Dichpally Toll way Private Limited- Client : NHAI)FourLanningDesign,Engineering,Finance,Construction, Operation and Maintenance of Four lanning of Armoor – Adloor Yella Reddy section in Nagpur – Hyderabad of NH 44 from Km 308.000 to Km 368.000 in the state of Andhra Pradesh under NHDP phase – II, DBFOT Basis. Total Length of the Project road – 68.0 Kms.

6)World Bank Funded Project (World Bank) – Construction of Roads and Storm water drains in Tiruvannamalai Municipality under assistance from World Bank Fund in TNUIFSL in Tamil Nadu. Total Length of roads – 15.65 Kms (Roads- 130 Nos & Storm Water Drains – 70 Nos.)

Employment Record:

HIGHWAY ENGINEER- : Tiruchendur-Palayamkottai-Ambsamudram section of SH 40I under CKICP in EPC mode - ( August 2021 to Till Date)

Responsibilities:

1)Review of Plan and Profile drawings and ensure as per Contract.

2)Conducting regular site inspection for the Highway Stretch and list out various shortfalls and rectifications required.

3)Conducting necessary test required for the Highway during execution.

4)Assist Resident Engineer and Team Leader in preparing reports and site investigation requires.

HIGHWAY ENGINEER- : Upgradation of Vriddhachalam-Ulundurpettai Road SH 69 in EPC mode - (Jan 2021 to July 2021)

Responsibilities:

1)Review of Plan and Profile drawings and ensure as per Contract.

2)Conducting regular site inspection for the Highway Stretch and list out various shortfalls and rectifications required.

3)Conducting necessary test required for the Highway during execution.

4)Assist Resident Engineer and Team Leader in preparing reports and site investigation requires.

HIGHWAY ENGINEER- : Upgradation of Vriddhachalam-Parangipettai Road SH 70 in EPC mode - (Dec 2015 to Dec 2020)

Responsibilities:

5)Review of Plan and Profile drawings and ensure as per Contract.

6)Conducting regular site inspection for the Highway Stretch and list out various shortfalls and rectifications required.

7)Conducting necessary test required for the Highway during execution.

8)Assist Resident Engineer and Team Leader in preparing reports and site investigation requires.

Assistant Highway Engineer: Operation & Maintenance of Palanpur- Radhanpur-Samakhyali sect ion of NH 14 & NH15 ( Km 360.000 to Km 601.000) – ( May 2015 to Nov 2015)

Responsibilities:

1.Assist Highway Maintenance Engineer in preparing Various Reports as per the Maintenance Contract.

2.Conducting monthly site inspection for the Highway Stretch and list out various shortfalls and rectifications required.

3.Conducting necessary test required for the Highway in terms of Maintenance.

4.Assist Team Leader in preparing reports and site investigation requires.

Assistant Highway Engineer:, Independent Services for Four Lanning of Tirupati – Tiruthani-Chennai Package from Km 274.800 to Km 338.400 in AndhraPradesh and From Km 0.00 to 61.47 in the State of TamilNadu under DBFOT basis . Client – National Highway Authority of India (May 2013 to April 2015)

Responsibilities:

1.Assist senior quality / Material expert in reviewing test results of quarry and borrow area material.

2.Assist senior quality / Material expert in determining strength and characteristics of material and their suitability for use in pavement construction.

3.Assist senior quality / Material expert in inspecting concessionaires field laboratories to ensure they are adequately equipped and capable of performing all specified testing requirements of contract.

4.Assist senior quality / Material expert in ensuring that the materials delivered to sites comply with standards and specification.

5.Ensure and implement quality control and assurance in all construction works.

6.Assist senior quality / Material expert in setting up concessionaires crusher and bituminous mixing plants to ensure the specified requirements for such equipments are fully met.

7.Assist Team Leader in preparation of various project reports.

Assistant Highway Engineer, : Independent Services for Four Lanning of Armoor – Adloor Yella Reddy section from Km 308.000 to Km 367.000 on Nagpur – Hyderabad section of NH 7 in the state of Andhra Pradesh (Package No. NS 2/BOT/AP -01) on DBFOT basis under NHDP – Phase – II. Client – National Highway Authority of India (Feb 2011 to April 2013)

Responsibilities:

1)Assist senior quality / Material expert in reviewing test results of quarry and borrow area material.

2)Assist senior quality / Material expert in determining strength and characteristics of material and their suitability for use in pavement construction.

3)Assist senior quality / Material expert in inspecting concessionaires field laboratories to ensure they are adequately equipped and capable of performing all specified testing requirements of contract.

4)Assist senior quality / Material expert in ensuring that the materials delivered to sites comply with standards and specification.

5)Ensure and implement quality control and assurance in all construction works.

6)Assist senior quality / Material expert in setting up concessionaire’s crusher and bituminous mixing plants to ensure the specified requirements for such equipments are fully met.

7)Assist Team Leader in preparation of various project reports.

Assistant Engineer – Wilbur Smith Associates Private Limited.

Project Management Consultancy services for Construction supervision of Widening and improvements of A.P. Border to Ramasamudra road ( Via, Gurmitkal ) in Gulbarga district of Karnataka State; Project Length – 46.00 Kms, Project Cost : 53.00 Crores, Client : Karnataka Road Development Corporation (August 2006 to Dec 2007 )

Assitant Engineer – Wilbur Smith Associates Private Limited.

Project Management Consultancy services for Construction of IT Expressway in Chennai under TNRDC from Madhya Kailash to Siruseri of OMR from Km 0/0 to 21/0.Length of the Road: 21 Kms. Project Cost for the Maintenance: INR ; 130 crores. (January 2005 to July 2006)

Field Engineer – Wilbur Smith Associates Private Limited.

Project Management Consultancy services for Construction of Roads and Storm water Drains in Tiruvannamalai Municipality under the World Bank fund; Client – TNUIFSL ( Tamil Nadu Urban Infrastructure Financing Services Limited ) ; Total Cost of the Project : 4.89 Crores . Length of Roads: 20 .0 Kms(December2003 to December 2004)

Field Engineer – Wilbur Smith Associates Private Limited.

Independent Technical Consultant for the Quality Inspection of Roads in Tamil Nadu under TNRSP. ( Tamil Nadu Road Sector Project ), Total Length of the Roads Covered – 1600 kms, Project Cost – INR : 200 Crores.(January’2003 to November 2003)

Field Engineer – Wilbur Smith Associates Private Limited.

Third Party Technical consultancy for the Quality assurance of works in Chennai Corporation ; in construction Roads and Storm water drain Woks( TNUFISL) funding Project – Total Length of Road – 450 Kms; Project Cost – 150 Crores; ( September 2001 to December 2002 )

Field Engineer – Wilbur Smith Associates Private Limited.

Independent Technical consultancy for the Quality assurance of works in Kolar District under KRDCL. ( Karnataka Road Development Project ), Total Length of Roads – 310 Kms, Cost of the Project : INR : 20 Crores; (June 2000 to August 2001)

Field Engineer – Wilbur Smith Associates Private Limited.

Independent Technical consultancy for the preparation of DPR for the construction of Hyderabad outer Ring road under R& B. – Total Length of the Project Alignment - 210 Kms, Cost for DPR – INR : 1.50 Crores: (April 1999 to May 2000)

List of Responsibilities:

Fixing of proposed alignment using GPS.

Co coordinating with the Survey team in taking the detailed topo and various details required for the DPR project.

Testing of various construction materials in the lab as well as field tests to assess the quality of materials used in Project road

Maintenance of daily records of all activities and of the site diaries and in respect to the contract structures.

Monitor actual programmed with the concurrence of the contractor.

Reviewing the contractors submitted investigation report on materials and documents.

Field Engineer – Wilbur Smith Associates Private Limited.

Independent Technical consultancy for the preparation of DPR project report for the widening and improvements to the ECR road in Chennai .Total Length of the Project Alignment - 110 Kms, Cost for DPR – INR : 80 Lakhs: (June 1998 to March 1999)

List of Responsibilities:

Interacting with client.

Co coordinating with the Survey team in taking the detailed topo and various details required for the DPR project.

Testing of various construction materials in the lab as well as field tests to assess the quality of materials used in Project road

Maintenance of daily records of all activities and of the site diaries and in respect to the contract structures.

Monitor actual programmed with the concurrence of the contractor.

Reviewing the contractors submitted investigation report on materials and documents.

Supervising the sub contracts team .

Senior Site Engineer – M/s. Rengaraj ( Firm ), Chennai.

Construction of Roads and Storm Water Drains in the Pondicherry power corporation Limited, Karaikal, Client : Bharat Heavy Electricals Limited, Pondicherry, Length of the Road: 10 Kms, Project Cost of the work: 7 Crores .(September 1995 to May 1998)

Responsibilities:

Reviewing project construction drawings, specifications and the method statements.

Checking of surface levels as per the tolerance levels.

Conducting the required field tests for Earthwork in Embankment, sub-base, base course and wearing course in Flexible and rigid pavements, as per MORTH,IRC and IS specifications etc

Assist the Project Manger in coordinating varies activities.

Monitor the quality and progress of work for timely completion of the project.

Maintaining construction records and measurements of completed works.

Preparation of Weekly & Monthly progress reports.

Preparing bills and Preparation of R.A.Bill.

Preparation of Completion Reports & Revised Estimates of Road Packages.

Senior Site Engineer – M/s. NAPC Limited, Chennai.

Construction of Roads and Storm Water Drains in the Manali and Cuddlaore Indusrial SIPCOT’s, for the Petrochemical and Pharmaceutical Industries.Length of the Road: 40 Kms, Project Cost of the work: 25 Crores (September 1991 to August 1995)

Responsibilities:

Checking of surface levels as per the tolerance levels.

Conducting the required field tests for Earthwork in Embankment, sub-base, base course and wearing course in Flexible and rigid pavements, as per MORTH,IRC and IS specifications etc

Assist the Senior Site Engineer in coordinating varies activities.

Monitor the quality and progress of work for timely completion of the project.

Maintaining construction records and measurements of completed works.

Preparation of Weekly & Monthly progress reports.

Preparing bills for Sub Contractors and Preparation of R.A.Bill.

Languages Known

Speak Read Write

English Excellent Excellent Excellent

Tamil Excellent Excellent Excellent

Hindi Good - -

Telugu Good Fair -

Declaration:

I, the undersigned, certify that to the best of my knowledge and belief, these data correctly described by me, my qualification, and my experience.

( P.Devaraji )



Contact this candidate