SIGNIFICANT EXPERIENCE:
** ***** ** ********** / ******* management encompassing the development, migration, implementation, and support of Cerner information technology systems in single net and multi-net multi-facility rollouts.
Technical manager for multi-tiered systems including: Intel, Citrix, Oracle, AIX, Print Services, and FSI/MDI
Certified class instructor for Cerner Millennium: Architecture, Troubleshooting, and Issue Management
CERTIFICATES
ITIL V3 FOUNDATION – Issued Aug 2019
SCRUM MASTER CERTIFIED Issued Nov 2019
SIX SIGMA YELLOW BELT – Issued Aug 2019
ACHIEVEMENTS
Received Cerner Top Gun Award (only awarded to top 5% of the company)
Received 2000 Hour Consulting Award from Health Data Specialists, LLC
Primary driver of Navigator Solutions. Led the charge to solve issues one time and create knowledge articles that could be posted and searched on corporate website for both associates and clients. Proved concept with pilot group and reduced overall incoming issues to the support organization saving the company valuable time and money.
Architect and creator of Drive Layouts. Designed and developed software and documentation on how to install Cerner Millennium on AIX and VMS systems. Consulted with resident experts and documented how the system should be laid down for optimal performance and stability. The implementation by subsequent system engineers saved rework that was prevalent across the company saving clients and Cerner time and money to implement Cerner Millennium with high satisfaction.
Worked directly with the CIO of Cerner in order to design and implement a tracking and accountability process between two critical organizations at Cerner, the Immediate Response Center (IRC) and SolutionWorks (SWx), ultimately reducing the number of after hour pages to associates that had already put in a full day. This process enhanced the knowledge of the IRC and solved critical issues faster than in previous years.
Designed and developed internal measures using Business Objects to hold support associates accountable to key metrics. Implemented these measures on current team and was recognized by leadership for results. Implementation of these measures was then input into other teams, establishing a common measuring system that ultimately enhanced the annual review process and made it more subjective.
EMPLOYMENT
Nordic Consulting to CGH Medical Center
Cerner Senior System Engineer
September 2023 – present
ATIM Instructor
Upgrade from 2018.04.03 to 2018.16.03
TATA Consulting Services
Cerner Programmer - Analyst
May 2021 – August 2023
Interface/MDI Support
oiCommand – Container creation, device creation/updates, cycling of backend software.
oPhoenix
Incident reduction committee
ATIM Instructor
Domain refreshes
Websphere XR
Wellsky Consulting Services
Programmer - Analyst
November 2022 – May 2023
Developed custom Cerner Classic Blood Bank Extracts to import into Wellsky database
MedSys Group – Cerner – Department of Veterans Affairs
Technical Team Lead
Jun 2020 – November 2020
Technical Lead interfacing to patient kiosk for Department of Defense.
University of Tennessee Medical Center
Cerner Analyst
Sep 2019 – May 2021
MPage Creation / Support / Testing
DA2 report writing
PerfectServe Integration
Lights On compliance - Purges
Health IT Specialist LLC
Owner and System Engineer/Programmer for multiple 1099 contracts.
Feb 2016 – Aug 2019
Enterprise Data Warehouse (EDW)
Cerner Classic extract via CCL
Business Objects and SQL
Liberty Solutions to Trinity Healthcare (100% remote) Aug 2018 – March 2019
Cerner System Engineer
Production support for Printing, Performance, XR, LightsOn, Olympus configuration
Production ccl / sql updates
Mock refresh – Operations Job management
MQ upgrades, manage channels, monitor and troubleshoot stalled or backlogged queues.
System Engineer training / mentoring
Cumberland Consulting Group to Huntsville Hospital, AL – (100% remote) Aug 2018 – Dec 2018
Cerner CCL/DA2 Developer
Developed DA2 Infusion Billing Report for documenting patients with an infusion before discharge
Developed CCL Anticoagualtion Education Report- List of patients who are on an anticoagulant.
Performance improvement on system and reports
VACO to Gillette Childrens in St. Paul, MN (100% on-site) Mar 2018 - Jul 2018
Cerner System Engineer
Reviewed packages and system logs for performance
Reviewed Lights On to ensure data uploading correctly
Mentored System Engineers
Health IT Specialists to Forward Health Group – (100% remote) Feb 2017 - Nov 2017
Cerner CCL Developer
Correct CCL reports written prior to extract data around colonoscopies, smoking secession.
Healthcare Performance Group (HPG) to Spectrum Health (95% on-site) (Feb 2016 – Dec 2016)
Cerner System Engineer
Production support for 724Access, Printing, Performance, XR, and RHO coordination
Production ccl / sql updates
724 Rollout – Installation and deployment including new FirstNet module for Citrix
Mock refresh – Operations Job management
Developing solution documents, presentations, or other client-facing documents.
Liberty Solutions to Trinity Healthcare (100% remote) Mar 2017 – Mar 2018
Cerner System Engineer
Production support for Printing, Performance, XR, LightsOn, Olympus configuration
Mock refresh – Operations Job management
MQ upgrades, Manage channels, monitor and troubleshoot stalled or backlogged queues.
System Engineer training / mentoring
Insight Global LLC to HCA (100% Telecommute) (Remote Hosted) Dec 2015 – Feb 2016
Cerner CCL Developer
Created demographics file to be used as input file to pull EKG and Surgery cancelations.
Report writer for reimbursement of funds using Discernvisualdevloper and Operations.
Created state regulated report for reimbursement
S&P Consulting to below June 2012 – June 2015
Cerner Senior System Engineer
Provincial Health Services Authority (90% Telecommute) (Client Hosted)
Vancouver, Canada
Provided management and maintenance: Extendible Reporting (XR), IBM Websphere, Cerner Millennium, Olympus, CAMM / Content360 (Formally Cerner ProVision Document Imaging (CPDI)), domain refreshes, package installs, domain scrambles, FSI/MDI and downtime planning
Mentored new system engineer(s) that allowed me to exit knowing that the system would be managed in a stable fashion.
Health Data Specialists, LLC
Cerner Senior System Engineer
July 2009 – August 2013
Adventist Healthcare (25% Telecommute) (Client Hosted)
Covenant Healthcare (90% Telecommute) (Client Hosted)
Lakeland Regional Medical Center (25% Telecommute) (Cerner RHO)
Medstar Health (25% Telecommute) (Cerner RHO)
Sentara Healthcare (25% Telecommute) (Client Hosted)
System Engineer Responsibilities (for all above clientele)
PowerInsight (Business Objects) administrator and developer of clinical outcome reports for improving patient care.
Developer of CCL reports using DVDEV and CCL.
Application and hardware maintenance, performance improvement, high availability, and upgrades of application, OS, Oracle, and Olympus
Maintained security to data within the architecture of Cerner Millennium using P2Sentinel audits and backend login audits.
Management of multiple RS/6000 AIX nodes, Citrix Presentation Servers, Linux servers, and Oracle / MYSQL databases
Cerner 724Access install and management with emphasis on security and availability
Client advocate in a Cerner Millennium Remote Hosted (RHO) system
Citrix performance improvements, file system cleanup, Cerner Millennium troubleshooting
Hospital-wide printer configuration and deployment
Developing solution documents, presentations, or other client-facing documents
Oxford Consulting April 2012 – June 2012
Cerner Senior System Engineer
Trinity Healthcare (90% Telecommute)
Developed custom Cerner Data Extracts in PL/SQL and CCL
Dell Inc - August 2011 – August 2012
Cerner Technical Manager (100% Telecommute) (Dell hosted)
Technical Resource Manager overseeing system administration, capacity planning, upgrade planning/implementation, printer configuration and troubleshooting
Responsible for all technical aspects of Cerner Millennium for Hub2 and Hub4 at Tenet Health
Cerner Corporation June 1995 – April 2009
Senior Consultant, Support
January 2008 – April 2009
Business analysis for operational improvement to delight clients and reduce response times on service records by writing jscript, html, with drill-downs using Business Objects / Crystal Reports
oAllowed managers to effectively see statistics on their associates and compare across teams for better performance reviews.
Project Leader, Orders Support
April 2007 – January 2008
Resourced, escalated, and queue management for Order Management
Improved support experience to clients by driving polite, knowledgeable, and quick response to issues
Solution Group Manager (SGM), Support
April 2006 – April 2007
Technology support manager for AIX/VMS, Foundations, End User Computing, Oracle, Database Architecture, Print Services, Remote Report Distribution, and FSI/MDI
40+ resources, 8 teams
Led SGMs in all statistics for support organization
Established turnover process with consulting organization
Project Manager, Performance Lab
July 2004 – April 2006
Reduced performance time and improved test accuracy by automating prep and collection of data
Developed kornshell and dcl scripts on both AIX and VMS to automate preparation of tests and data collection
Tested Cerner Millennium code for functionality through WinRunner scripts and measured test response times with RTMS data (compared this with client data in Lights On)
Operations Manager, Technologies, Foundations, FirstNet, Orders Support
October 2002 – July 2004
Resourced, escalated, and queued management for core infrastructure of a 3-tier client-server Cerner system
Developed skilled resources that provided call support to consultants and clients
Process Architect, Operations
November 2000 – October 2002
Developed drive layouts for system installations on IBM for more efficient sales and installations (received Top Gun Award, the top 5% of the company)
Coded compiled help (.chm) manual for system administrators managing Cerner Millennium system
System Engineer, Consulting
August 1997 – November 2000
Planned and performed VMS to AIX migration of 3-tier client-server system
Secured client loyalty by stabilizing system and increasing system effectiveness
Taught clients troubleshooting and performance management techniques on Cerner’s 3-tier architecture
Ensured interfaces to other vendors were operating correctly through Open Engine and Open Port
Support Specialist, Support
June 1995 – August 1997
Cerner classic phone support for Client Accounting and Charge Services (Revenue Cycle), Infection Control, Microbiology, Service Management, and Management Reporting.
Wrote electronic billing interfaces (EBI) for multiple sites based on government specifications for payment to the hospital.
Balanced Aged Trial Balance for clients by analyzing the AD file with CCL reports
TOOLS AND SOFTWARE
Operating Systems: AIX (HACMP), Linux, HP-UX, MacOS, Windows, and Android
Ticketing Systems: ServiceDesk, ServiceNow, and Remedy
Microsoft: Excel, PowerPoint, Access, Publisher, Project, Outlook, OneNote, BitBlocker
Virtual Services: Citrix, VMWare, Virtual Desktop
Scripting: PowerShell 2.0, Korn Shell, BASH, PERL, CCL,
SQL
Shared Storage Technologies: LUN, RAID, SAN
Network Technologies: DNS, DHCP, VPN, Routers, Switches, IIS,
Active Directory
Security: Firewalls, filtering, Add/Modify/Delete accounts, sftp, private and public key.
Collaborative Technologies: Microsoft Exchange, Office365, Skype, Lynk, Trillian, Synergy, WinZip
Performance: CPU, I/O, Memory, Network monitoring and fixes, F5 Load Balancer
Adobe Acrobat
HTML, Jscript, IIS, Enterprise Data Warehouse (EDW)
MS Windows Server
McAfee Anti-Virus
IBM Websphere MQ
Crystal Reports
Business Objects
EDUCATION
B.A., Computer Science, Central Methodist College, 1995