Randell Baker
Lillington, NC 27546
Passport: 160463395
Domestic Phone: 919-***-****
International Phone: 011-234-705-***-****
ad27io@r.postjobfree.com
BARGE SUPERINTENDENT
PROFESSIONAL EXPERIENCE
Twenty years of offshore construction experience as Tower Operator, Anchor Foreman, Barge Foreman, Asst. Superintendent/Superintendent laying pipelines of various sizes, installing jackets, piles, deck sections, riser installations, cable laying and working with SAT divers performing subsea tie-ins.
2023 April – Till Date Barge Superintendent, NPCC barge DLB-1000 Saudi Arabia
CRPO# 87 - 14 JACKETS IN MNIF (IK) (ARAMCO)
2023 January – 2023 April Barge Superintendent, NPCC barge PLB-648 Saudi Arabia
CRPO # 52 - ABSF EDP, ABSF (2) New PDF & (4) BRRI Platforms Upgrade - IK (ARAMCO)
2022 November to 2022 December Barge Superintendent, NPCC barge DLB-750 Abu Dhabi
Belbazem Block Development Project (ADNOC / Al Yasat Petroleum)
2022 March to 2022 August Barge Superintendent, NPCC barge DLB-750 Saudi Arabia
CRPO for Ju'aymah Offshore Platform-Bypass System Project. (ARAMCO)
2021 June to 2022 January Barge Superintendent, NPCC barge DLS-4200 Saudi Arabia
CRPO 51 - LTA for Offshore Facilities Zulf EDP, (3) Slipovers & (12) Platforms Upgrade Project. (ARAMCO)
2019 November to 2020 November Barge Superintendent, NPCC barge PLB-648 Saudi Arabia
LTA-CRPO Safaniya Slipover Platform with Associated Pipelines & Cables Project-IK. (ARAMCO)
2019 April to 2019 August Barge Foreman, NPCC barge DLS-4200 Saudi Arabia
Installation of 10 Oil & Gas Jackets in Marjan, Safaniya, Abu Safah & LWHH Fields-IK (ARAMCO)
2017 to 2018 Assistant Barge Superintendent, Valentine/Subsea 7 Saudi Arabia
Construction/installation of 4 topsides 1,000 tons+ for Aramco Oil Company in Safaniya field.
- Worked as Barge Forman on DLB-1600
- Supervised anchor handling operations and worked with Aramco Marine Advisor
2015 to 2017 Barge Superintendent, Valentine Martime Gulf Mumbai High, India
• Supervised the laying of 48’’ & 26’’ pipeline while working in the ADMA field
• Also laying 14’’ & 8’’ pipeline
• Installed 6’’ and 20’’ flares and 48’’ over the side tie-in spool with PLEM.
2011 to 2015 Barge Foreman/Superintendent, Kaztec Engineering Ltd (RapidLink) DLB Ekulo Cheyenne/Anchor Barge
• Oversee the laying of various size pipelines (6”, 8”, 12’’, 16’’)
• Deck installations: 3 pile / 4 pile
• Subsea tie-ins, spools, expansions, etc
2010 to 2011 Anchor Foreman/Tower Operator, Sea Trucks Group Nigeria Barge Jascon 2
• Performing pipe-lay operations and beach-pull off the coast of Esquavos for a shallow water job (3-5 meters in depth)
• The above operations occurred during monsoon season making for a challenging environment
• Also oversaw the tie-ins for this install while coordinating with divers
• Pipeline was 24’’ concrete coated with three concrete thickness transitions (46, 66, 76 mm coating)
2006 to 2009 Barge Foreman/Anchor Foreman Offshore Specialties
• Worked on the D.B. William Kallop combination lay/derrick bridge
• Worked mostly in the tower while laying lines of various sizes.
• Broke out as leader man to assist both foreman’s as needed’
• Worked with SAT divers doing sub-sea tie-ins.
• Also completed many additions to existing structures.
• Have worked mobile on tugs doing various hook-up work
Completed salvage projects from lifts ranging up to 800 tons
• Installed and removed various sized deck sections & jackets
• Laid various sizes of pipelines from 6” to 32”
• Installed various sizes from four pile jackets to monopods eight pile and tripods
• Installed several packages ranging from living quarters to additions to extensions on platforms ranging from 100 tons to 1375 tons.
• Assisted divers with all hook-ups and salvage of all sorts Jackets and downed Platforms. Have worked with regular length pipelines as well as double Joint systems.
2005 to 2006 Leader Man / Tower Operator, McDermott Middle East / Dubai
A tier-one leader in project engineering, design, procurement, fabrication and delivery for the offshore and subsea markets, McDermott serves a diversified client base of independent, international and national oil companies.
McDermott’s strategic success begins, and ends, with our customers. We build long-standing client relationships through three operating areas (Americas, Europe & Africa, Middle East and Asia) with an unwavering focus on operational excellence and client engagement to deliver the best solution.
• Installed FPSO’s
• Installed Anchor chains and piles for tankers.
• Worked on KP-1 & DB-26 laying various size pipelines.
• Laid some lines wet.
• Made beach pulls and worked on beach running crews on winch and building cofferdams.
• Completed a wide variety of crossings from pipelines to electric feeds from beach.
• In charge of Anchor placement and work closely w/ inspectors & survey crew.
• Worked on several Tugs doing pigging work and touch-up work to complete punch list items.
• Worked closely w/SAT divers
• Made lifts ranging from 200 Ton to 1600
2002 to 2004 Leader Man / Tower Operator, Chet Morrison Contracting LB-CM2 Gulf of Mexico
Chet Morrison Contractors is a leader in providing comprehensive construction, maintenance and abandonment services to the oil and gas industry for land, offshore and shallow-water projects across the globe. Leveraging over three decades of experience and a wide range of specialized resources, we have developed a reputation as an industry- leading solutions provider.
• Laid various size line from 4”-16”
• Dual lines pipe and umbilical
• Laid umbilical cables from platform to platform
• Riser installations, sub-sea tie-ins
• Expansion joint installations
1991 to 2001 Owner / Operator, R&B Logging Inc North Carolina
• Land clearing
• Select cutting of trees
• Heavy equipment operator
• Truck Driver
Education:
- High school
Certificates:
- BOSIET with HUET and EBS
- Rigger Safety Training API RP 2D
- TWIC
- H2S
- TUV (lifting supervisor training course)