RAYMOND SANCHEZ
ad23vl@r.postjobfree.com
*-******* ***** ***** *** Casino Las Vegas/Mechanical/Plumbing /Dewatering Project (2021) New Construction General Contractor-WA Richardson
In the three years as a Project Manager for Bombard Mechanical I managed
the installation of.
The Dewatering, Hydronic and Plumbing Systems throughout the Podium, Managed the approval and purchasing of Material, Equipment, and Fixtures.
Managed proper installation of piping and equipment. Answer all question
from FEA (engineer) or WA Richardson (contractor) on scheduling of our work.
Involved in commissioning and training of our equipment.
2-Columbia University Central Energy Plant/Mind Brain Behavior Building
56 Million Dollar Mechanical/Plumbing Project (2016) New Construction NYC
General Contractor-Lendlease.
As a Project Manager managed the installation of;
Building Management System, 2-150-Ton York Chillers, 23-Air Handlers, 2-150# High Pressure Cleaver Brooks Boilers, Pressure Reducing Stations, Hot and Chill Water Systems, High Pressure Steam System, High Pressure Gas. Domestic Water Pumping System.
Storm and Domestic Waste System, Steam/Hot Water Heat Exchangers, Plate and Frame Exchangers,
Rigging and installation of 4-Marley Cooling Towers. Commissioning of Equipment and Punch lists.
3-New York Columbia Presbyterian Hospital (Nov.2014) As a Project Manager managed a 16-million-dollar Project (Existing Building) NYC
General Contractor-Turner Construction
A-The installation two economizers (100% X-Ray Built in Place) two steam turbines on two existing 150# High Pressure Steam Boilers.
B-Removal of the Existing #6 fuel oil system and replaced it with a #2 oil system for all four boilers.
C-Removed refurbish and replace 4 existing fuel oil storage tanks (16000 gallons each)
D-Replacement of existing high pressure steam valves (30) 16”and down
4-Hamilton Ave Transfer Station (Feb-2012) As a Project Manager managed a 5 Million Dollar Project
Prime contractor for the Department of Sanitation for the City of New York
(New Construction)
A-Installation of stainless steel spiral ductwork exhaust system (60” down).
B-28 inline exhaust fans with starters and disconnects (all stainless steel)
C-8 Air Handlers with DX coils and associated refrigeration piping.
Raymond Sanchez
Las Vegas Nevada
ad23vl@r.postjobfree.com
Seeking a position as a Mechanical/Plumbing Project Manager.
Qualifications
Diplomatic Management Skills.
Communication Skills in Spanish and English.
Working knowledge in Word, Excel, Windows XP.
30 Years of Mechanical Construction Management.
Major Multi-Million Dollar Project Experience
Keen eye for unexperienced labor and workmanship
Experience
Hotel Construction, Ritz Carlton Washington DC, City Center Las Vegas NV.
Albert Einstein Medical Center Boiler Plant NYC, High Rise Residential Towers NYC
Please refer to the attached sheet for completed projects.
Should you need additional Project experience, it will be furnished upon request.
Employment History
Bombard Mechanical Las Vegas September 2018-November-2021
Small HVAC Contractor Las Vegas Area Jan 2017-Sept-2017
Fresh Meadow Mechanical 1990-2016
WDF Mechanical 1983-1990