Post Job Free

Resume

Sign in

Project Manager Construction Management

Location:
Phoenix, AZ
Posted:
January 23, 2024

Contact this candidate

Resume:

R. Wayne Faulkner

*** *** **.

Truth or Consequences, NM 87901

915-***-****

ad20ta@r.postjobfree.com

EDUCATION

**** ** **** ********* *** Bachelor of Science in Civil Engineering New Mexico State University, Las Cruces, New Mexico 1983 to 1985 Mechanical Drafter (D.O.T. No. 017.281-010) Detailer (D.O.T. No. 007.261-018)

Somerset State Vocational Technical School, Somerset, Kentucky PROFESSIONAL EXPERIENCE

08/18 to 2022 Danny Sander Construction

Project Manager – El Paso, Texas

Construction management on various water, wastewater and storm drain projects.

Desert Acceptance (Square Dance) Wastewater Collection System

Install 14,030 LF 21” PVC sewer pipe

Install 29,170 LF 12” PVC sewer pipe

Install 2,300 LF 12” PVC sewer pipe

Install 17,010 LF PVC sewer pipe

Install 255 EA 4” wastewater service connections

Decommission 255 on site sewer systems

Install 141 EA sewer manholes

Processed all change orders +/- $600,000

Sam Snead Storm Drain System

2,365 LF 10’ x 6’ cast in place concrete box

culvert

645 LF 7’ x 4’ cast in place/ precast concrete box culvert

12 concrete inlet structures

4,450LF concrete curb and gutter along with

sidewalks and driveways

11,820 SY 2.5” HMAC

Install 3000 LF 21”, 18”, 15” and 8” sewer lines

Install 37 sewer manholes

Install 1,000 LF 20” and 16” ductile iron force

mains

Processed all change orders +/- $1.7M

01/06 to 04/18 R.M. Wright Construction

Project Manager-El Paso, Texas

Construction management on various waste water and water projects.

City of Sunland Park, N.M. waste water treatment plant Phase II

City of Santa Teresa water reservoir

City of Horizon reverse osmosis booster pump station

EPWU-equipping 8 Airport wells

Fort Bliss lift station

City of Carlsbad, N.M.-Church Street lift station

Fred Hervey Water Reclamation Plant- Addition of new lime Recarbonation Unit.

EPWU- Easy Way Lift Station & Strahan Interceptor Project

City of Tornillo-Sewage lift station

Fabens WWTP

South Laredo Interim Improvements Project

City of Sonora, Texas WWTP Improvements

Total projects with RMWCO - 67

07/02 to 12/05 Molzen-Corbin & Associates

On Site Construction Management and Observation

City of Sunland Park Phase I and Phase II

Phase I- Aerobic Digesters, 2 clarifiers, U.V. disinfection Chamber, Blower Complex, Pump Building, all piping and electrical controls attached.

Phase II- Additional Digesters, MCC building, all piping and electrical controls attached.

City Of Albuquerque Sanitary Sewer Lift Station

Improvements

18 different lift station upgrades: piping, odor control systems, electrical controls, and HVAC.

City of Belen Airport Lighting

Updated runway lighting and signage

02/98 to 03/02 Robert E. Rivera Construction

Quality Control Representative-Las Cruces, New Mexico

Las Cruces Flood Control Project-Phase I & II for the U.S. Army Corps of Engineers.

All Paperwork involved-daily reports, prepatory, initial and final inspections, along with submittals and as-builts

Utility work consisted of 12” water lines, 4”-21” Vylon sewer lines, gas lines, 36”& 42” RCP storm water lines along with all major manholes.

Placed 10,000+/- c.y. of structural concrete-drainage structures, box culverts, and transverse road inlets.

Inspected and field verified all material and work as per plans and specifications. 06/96 to 11/97 B&W commercial Contractors

Construction Superintendent – Morenci, Arizona

Phelps Dodge

LIX Storage facility – Structural concrete, stainless steel piping and associated structures.

Conveyor rehabilitation and maintenance.

Maintenance work at SX plant (Solvent Extraction). 10/94 to 5/96 Wilger Enterprises, Inc.

Construction Superintendent – Albuquerque, New Mexico

Walgreen’s

Two Walgreen’s stores in El Paso, Texas. 90 days from placing footings to turning the store over for equipment and material installation. Concrete tilt-up panels.

Hollywood Video – Refurbished/updated 5 stores in the Albuquerque area.

Furrs Supermarket – Assisted Superintendent meet critical milestones in construction schedule.

First Security Cash Vault – Assisted Superintendent meet critical milestones in construction schedule.

*** OSHA 30 Certified

R. Wayne Faulkner

919 Ivy St

Truth or Consequences, NM 87901

(915)- 217-8317

PROFESSIONAL REFERENCES

Mr. Shawn Sander, Owner

Danny Sander Construction

El Paso, Texas

(915) – 497-4272

Mr. Randy Wright, Owner

RM Wright Construction

El Paso, Texas

(915) – 526-6891

Jose Machado, Owner

J&C Remodel and Construction

El Paso, Texas

915-***-****

Gary Grub, Instrumentation specialist

Alterman Electric

El Paso, Texas

915-***-****



Contact this candidate