R. Wayne Faulkner
Truth or Consequences, NM 87901
ad20ta@r.postjobfree.com
EDUCATION
**** ** **** ********* *** Bachelor of Science in Civil Engineering New Mexico State University, Las Cruces, New Mexico 1983 to 1985 Mechanical Drafter (D.O.T. No. 017.281-010) Detailer (D.O.T. No. 007.261-018)
Somerset State Vocational Technical School, Somerset, Kentucky PROFESSIONAL EXPERIENCE
08/18 to 2022 Danny Sander Construction
Project Manager – El Paso, Texas
Construction management on various water, wastewater and storm drain projects.
Desert Acceptance (Square Dance) Wastewater Collection System
Install 14,030 LF 21” PVC sewer pipe
Install 29,170 LF 12” PVC sewer pipe
Install 2,300 LF 12” PVC sewer pipe
Install 17,010 LF PVC sewer pipe
Install 255 EA 4” wastewater service connections
Decommission 255 on site sewer systems
Install 141 EA sewer manholes
Processed all change orders +/- $600,000
Sam Snead Storm Drain System
2,365 LF 10’ x 6’ cast in place concrete box
culvert
645 LF 7’ x 4’ cast in place/ precast concrete box culvert
12 concrete inlet structures
4,450LF concrete curb and gutter along with
sidewalks and driveways
11,820 SY 2.5” HMAC
Install 3000 LF 21”, 18”, 15” and 8” sewer lines
Install 37 sewer manholes
Install 1,000 LF 20” and 16” ductile iron force
mains
Processed all change orders +/- $1.7M
01/06 to 04/18 R.M. Wright Construction
Project Manager-El Paso, Texas
Construction management on various waste water and water projects.
City of Sunland Park, N.M. waste water treatment plant Phase II
City of Santa Teresa water reservoir
City of Horizon reverse osmosis booster pump station
EPWU-equipping 8 Airport wells
Fort Bliss lift station
City of Carlsbad, N.M.-Church Street lift station
Fred Hervey Water Reclamation Plant- Addition of new lime Recarbonation Unit.
EPWU- Easy Way Lift Station & Strahan Interceptor Project
City of Tornillo-Sewage lift station
Fabens WWTP
South Laredo Interim Improvements Project
City of Sonora, Texas WWTP Improvements
Total projects with RMWCO - 67
07/02 to 12/05 Molzen-Corbin & Associates
On Site Construction Management and Observation
City of Sunland Park Phase I and Phase II
Phase I- Aerobic Digesters, 2 clarifiers, U.V. disinfection Chamber, Blower Complex, Pump Building, all piping and electrical controls attached.
Phase II- Additional Digesters, MCC building, all piping and electrical controls attached.
City Of Albuquerque Sanitary Sewer Lift Station
Improvements
18 different lift station upgrades: piping, odor control systems, electrical controls, and HVAC.
City of Belen Airport Lighting
Updated runway lighting and signage
02/98 to 03/02 Robert E. Rivera Construction
Quality Control Representative-Las Cruces, New Mexico
Las Cruces Flood Control Project-Phase I & II for the U.S. Army Corps of Engineers.
All Paperwork involved-daily reports, prepatory, initial and final inspections, along with submittals and as-builts
Utility work consisted of 12” water lines, 4”-21” Vylon sewer lines, gas lines, 36”& 42” RCP storm water lines along with all major manholes.
Placed 10,000+/- c.y. of structural concrete-drainage structures, box culverts, and transverse road inlets.
Inspected and field verified all material and work as per plans and specifications. 06/96 to 11/97 B&W commercial Contractors
Construction Superintendent – Morenci, Arizona
Phelps Dodge
LIX Storage facility – Structural concrete, stainless steel piping and associated structures.
Conveyor rehabilitation and maintenance.
Maintenance work at SX plant (Solvent Extraction). 10/94 to 5/96 Wilger Enterprises, Inc.
Construction Superintendent – Albuquerque, New Mexico
Walgreen’s
Two Walgreen’s stores in El Paso, Texas. 90 days from placing footings to turning the store over for equipment and material installation. Concrete tilt-up panels.
Hollywood Video – Refurbished/updated 5 stores in the Albuquerque area.
Furrs Supermarket – Assisted Superintendent meet critical milestones in construction schedule.
First Security Cash Vault – Assisted Superintendent meet critical milestones in construction schedule.
*** OSHA 30 Certified
R. Wayne Faulkner
919 Ivy St
Truth or Consequences, NM 87901
(915)- 217-8317
PROFESSIONAL REFERENCES
Mr. Shawn Sander, Owner
Danny Sander Construction
El Paso, Texas
(915) – 497-4272
Mr. Randy Wright, Owner
RM Wright Construction
El Paso, Texas
(915) – 526-6891
Jose Machado, Owner
J&C Remodel and Construction
El Paso, Texas
Gary Grub, Instrumentation specialist
Alterman Electric
El Paso, Texas