Semiconductor QA/QC EPC Inspector 01/2023 to Current CTCI-AMERICA – Phoenix AZ
Inspected products, components, and materials for defects and compliance with tolerance standards.
Completed precise measurements using special tools. Communicated with production team members about quality issues. Performed visual inspections and non-destructive tests on subgrades and concrete samples. Reported repeated issues to supervisors and other departments, collaborating to identify issue roots and rectify problems.
Collaborated with production staff to establish and meet quality standards. Utilized quality control software to track and analyze product data. Trained other workers in inspection and testing procedures. Inspected rebars, verified workmanship, made sure work coordinated with plan, specs, and submittals for semiconductor plant.
Visual examinations
Sampling procedures
Inspection protocols
Blueprint understanding
Blueprint reading
Reporting and analysis
Teambuilding
Production expertise
Recordkeeping
Employee supervision
Flexible and Adaptable
Written Communication
PPE Compliance
Trowel machinery
Jointers and edgers
Power saws
Truck chute operation
Construction management
Residential construction
Budgeting
Commercial construction
Stormwater management
Cement and pavement
Microsoft Office Suite
Semiconductor Construction
BIM360
Microsoft 360
GOMACO curb machines
Coordinated with onsite testers on backfill, compaction test and concrete breaks. Construction Superintendent 05/2021 to 01/2023
BEUSING Civil EPC Construction – Phoenix
Supervised field crews to maximize quality and work efficiency. Coordinated required inspections with local jurisdictions to identify and quickly resolve any code concerns.
Delegated assignments based on plans, project needs, and knowledge of individual team members.
Collaborated with management and fellow supervisors to organize operations and achieve demanding schedule targets.
Supervised material usage and contractor man-hours to keep projects in line with budgetary restrictions.
Identified and reviewed proposed change order requests. Identified and eliminated safety risks through additional training. Delivered reports to construction manager to detail project updates and likely completion dates, noting delays, and causes.
Assistant Superintendent 05/2019 to 05/2021
Horizontal boring – Phoenix
Supported project coordination and smooth workflow by coordinating materials, inspections, and contractor actions.
Supervised staff by checking work against project expectations. Reviewed plans and inspected ongoing construction to keep work in line with project goals. Instructed personnel on use and maintenance of equipment and immediately notified supervisor of needed repairs.
Assisted in scheduling inspections for job sites and projects. Communicated and documented expectations to subcontractors during weekly meetings. Contributed to development, implementation, and execution of maintenance programs. Kept a watchful eye on equipment inventories, optimizing work readiness and aligning supplies with specifications for each job.
Shrunk knowledge gaps with ongoing training and close employee mentoring for new and less experienced team members.
Concrete Foreman 05/2012 to 05/2019
TEMCON Construction – Tempe
Measured precise amounts of concrete and verified levelness to improve quality of finished product.
Confirmed employee timecards and handled payroll of 15-person construction team. Applied concrete fabrication techniques to achieve desired project specifications, quality, and code standards.
Maintained clean, safe worksite for team safety and to help keep projects on-track. Leveled, smoothed, and finished surfaces of poured concrete for construction projects. Demolished and repaired old concrete surfaces.
Met with engineers to plan layouts and timeframes for jobs. Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.
Installed rebar and molded expansion joints and edges for concrete projects. Set wood and other forming materials to prepare for concrete pours. Adapted concrete pouring and mixing plans to daily weather and climate. Provided feedback to workers on job performance and safety procedures. Assisted in recruiting and hiring new construction and extraction workers. Oversaw daily operations at site, keeping team production moving at optimal pace. Sourced suppliers and purchased necessary materials for work. Concrete Superintendent 05/2005 to 05/2012
Select build – Glendale.
Set wood and other forming materials to prepare for concrete pours. Measured precise amounts of concrete and verified levelness to improve quality of finished product.
Maintained clean, safe worksite for team safety and to help keep projects on-track. Wore correct clothing and protective equipment for jobs. Installed rebar and molded expansion joints and edges for concrete projects. Applied concrete fabrication techniques to achieve desired project specifications, quality, and code standards.
Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.
Developed and maintained positive relationships with clients and other stakeholders. Prepared and submitted reports on job progress and safety conditions to upper management. Established and enforced safety regulations, procedures and standards for construction and extraction workers.
Trained workers in proper methods, equipment operation and safety procedures. Documented construction and extraction workers' hours, wages and other pertinent information. Oversaw daily operations at site, keeping team production moving at optimal pace. Assistant Superintendent 05/1994 to 05/2005
Michael J Valente Contracting – Phoenix
Reviewed plans and inspected ongoing construction to keep work in line with project goals. Supported project coordination and smooth workflow by coordinating materials, inspections, and contractor actions.
Instructed personnel on use and maintenance of equipment and immediately notified supervisor of needed repairs.
Communicated and documented expectations to subcontractors during weekly meetings. Remained aware of project costs and notified project team of anticipated exceptions to estimates.
Created and maintained daily and weekly reports for upper management. Shoveled materials such as dirt, gravel, concrete. Set wood and other forming materials to prepare for concrete pours. Measured precise amounts of concrete and verified levelness to improve quality of finished product.
Installed rebar and molded expansion joints and edges for concrete projects. Wore correct clothing and protective equipment for jobs. Education
Tolleson Union High School – Tolleson AZ