OBJECTIVE To work as a Senior Piping Designer, 3D Designer, with emphasis on Chemical, Petrochemical, Refineries, Pulp & Paper, plant, and Offshore Platforms layout and design.
EDUCATION Associate of Applied Science Degree in
Engineering Graphics and Design.
HONORS Member of Phi Theta Kappa (PTK). An international honor
society for two year colleges.
WORK EXPERIENCE
10/22 to Date Jacobs Engineering, Greenville, S.C.
Discipline Specialist, assigned to Pulp and Paper FEED Project, Equipment and Plan Layout, modeled all equipment in S3D .(Navisworks)
03/22 to 10/22 Fluor Enterprises Inc, Sugar Land, Texas
Sr. Pipe Designer/Checker, assigned to Intel Lynx Project, Module Coordinator, Plan Layout and Detail Design.S3D.(Navisworks)
12/18 to 06/21 Hargrove Engineers & Constructors
Piping Design Leader, Responsible for multiple piping design projects at Olin, in Freeport Texas, OCD, installed a new reactor R-2110, Plant A, New scrubbers and new pumps, NT-300 tower, replaced with new tower. (CADWorx) Laser Scan.
01/12 to 12/18 Fluor Enterprises Inc, Sugar Land, Texas
Sr. Pipe Designer/Checker, assigned to Iraq West Qurna I Project, Basra Iraq, Three
New Degasification Units, (Feed) layout, detail and design.(PDS)
(Smart Plan Review); Reliance Jamnagar Gasification Project, (SP3D).
Sasol Ziegler Project SP3D, SLM Project SP3D, Marathon Star Project SP3D.
09/11 to 01/12 Jacobs Engineering Group, Houston, Texas
Sr. Pipe Designer/Checker, assigned to a Confidential (Polysillicon) Poject, responsible for equipment and piping layout and design,
08/10 to 9/11 CB&I Inc, Houston, Texas
Sr. Pipe Designer/Checker, assigned to Cartagena Refinery Project, Tank Farm (Area Lead) Responsible for Tie-in Points location and verification with client approval, new and existing piping and tanks layout and design.(PDS) (Smart Plan Review)
1/08 to 08/10 Fluor Enterprises Inc, Sugar Land, Texas
Sr. Pipe Designer, assigned to Marathon Project, Coker unit, layout and design.
assigned to Texas Eastman, Gasification Project. (Feed).
assigned to Total Project, Port Arthur Texas, Tank Farm and ACU2 areas, install
new tanks and pumps; Check various areas of the project.(PDS)
(Smart Plan Review)
9/05 to 1/08 CDI Engineering Solution, Houston, Texas
Sr. Pipe Designer, assigned to DuPont, responsible for multiple piping design projects. (PDMS) Assigned to MEMC and Huntsman Projects as a checker, Pipe coordinator, to Houston and Tampico, Mexico offices. (PDS) (Smart Plan Review)
3/04 to 9/05 S&B Brazosport, LTD. Clute, Texas
Sr. Pipe Designer, responsible for multiple piping design projects at Dow Chemical, in Freeport, Texas. (PASCE)
5/01 to 3/04 Mustang Engineering Inc., Houston, Texas
Sr. Pipe Designer, Assigned to Valero, in Texas City, Texas,
Coker Offsite Project. Install new spheres tanks and pumps.
HF Alky Unit Exp. Tie-in to existing systems. Layout and design
Exchangers & pumps. Field work, dimensions & elevations.
Assigned to Griffin L.L.C. project. Layout and design of reactors, pumps, and various other equipment. Assigned to Offshore, Thunder Horse Project.
(PDMS) (PDS)
5/00 to 5/01 CDI Engineering Group, Freeport, Texas
Sr. Pipe Designer, responsible for multiple piping design projects at BASF, in Freeport, Texas. (Microstation SE). Work included OSBL piping, installation of pumps, exchangers, filters various other equipment. In Caprolactam, Syngas, Benzene and acid systems. Also responsible for field work (dimensioning, as build, and elevation surveys).
10/98 to 5/00 Jacobs Engineering Group, Houston, Texas
Sr. Pipe Designer, Assigned to BASF, in Freeport, Texas,
HDO-CLO Expansion project. Truck & railcar loading facilities,
Tie-in to existing systems. Relocate existing Propylene filtering
System, design numerous tanks & pumps.(CAD-PIPE)
9/97 to 10/98 CDI Engineering Group, Freeport, Texas
Sr. Pipe Designer, responsible for multiple piping design projects at BASF, in Freeport, Texas. (Microstation 5 & 95). Work included OSBL piping, installation of pumps, exchangers, filters various other equipment. In Oximation, Anone, Benzene and acid systems. Also responsible for field work (dimensioning, as build, and elevation surveys).
8/95 to 9/97 Taylor & Hill, Pearland, Texas
Pipe Designer, Assigned to Amoco Chocolate Bayou, in Alvin, Texas, working with the Hazop Team. Duties include: working on P&ID’s, creating ISO’s, field routing, dimensioning and field sketches. Piping plan and elevation dwgs. (CAD-PIPE)
04/90 to 8/95 Chemic Engineers, Hitchcock, Texas
Pipe Designer, working with piping designers developing isometrics. Field routing, dimensioning, surveying, and shooting elevations. Assigned to Rhone Poulenc and BASF, in Freeport, Texas where I was responsible for creating ISO’s, flow sheets, P&ID’s, plan view drawings, sections view drawings, bills of material. Also responsible for field work, shooting elevations and field sketches. (Pro-Pipe and Pro-ISO, Microstation Omni-ISO)
COMPUTER
SKILLS AutoCAD 12, 13, 14, 2000- Pro-Pipe and Pro-ISO, CADPIPE, Flex Cad.
Microstation 4.0, 4.3, 5.0, 95, SE, Omni-Iso, PASCE, PDS-1.
PDS-2 & ISOGEN, PDMS, SmartPlan Review.SP3D.
REFERENCES Furnished upon request
PROFESSIONAL
ORGANIZATIONS I am a member of SPED (Society of Piping Engineers and
Designers) PROCESS PLANT LAYOUT AND PIPING DESIGN
COURSE. (CERTIFICATE)