Post Job Free
Sign in

Start Up Lead Engineer

Location:
Nobigonj, Dhaka Division, Bangladesh
Salary:
7000 USD
Posted:
December 04, 2023

Contact this candidate

Resume:

Waleed Mohamed Ahmed Mouad

: Borge Maka ** May st Shoubrah El-Kheima- Cairo - Egypt.

Mobile: +201**-******* +880**********

************@*****.***

************@*****.***

******.******@**.***

GE Power Energy 20 Years Experience

From 20/3/2023 to till now Company: GE Contract

Lead Commissioning &Startup Unique Meghnaghat 588.31 MW CCPP at Sonargaon, Narayanganj, Bangladesh

• Commissioning and startup of Reduction Gas station RMS and Fuel Gas Booster compressors Ingersoll IR manufactory

• Commissioning and start up for Water Bath heater&H2 generator. Gas generator

• Commissioning and start up Multi-Shaft GT Frame 9HA.01, ST Model STF-A651, Control system (Mark Vie) and their auxiliaries.

• Built up PTW Office, Prepare procedure for Commissioning and Startup, TOP (Turnover packages),

From 20/7/2017 to 10/01/2023 Company: GE Contract

TOP Manager Waad Al-Shamal ISCPP-KSA-GE

• TOP Manager with GE at ‘Waad Al- Shamal -4 on 1 Block at 1390 MW with GE GT's 7FA.05/STG D6.4/ HRSG's and 50 MW

Integrated Solar Power Plan

From March 2017 to April 2017 Company: GE Contract

Process /Operation Lead Engineer SHOIBA Power plant-KSA-GE

• Commissioning and start up Alstom steam turbine 400MW After MI outage

• Commissioning and startup of turbine generator and their auxiliaries, such as seal oil system, Co2/H2 purging, CCW system, lube oil and hydraulic system, Brush gear test

From 15/6/2016 to 15/8/2016 Company: Shanahan Engineering Company-Alstom

Process /Operation Lead Engineer CCPP12 Power plant-KSA-GE

• Commissioning Operations Supervisor for 4 GE 7FA.05/Alstom steam turbine 345 MW on 1 Power Blocks

• Commissioning and startup HRSGS and their auxiliaries

• Commissioning and start up Alstom steam turbine

From 23/12/2012 to 15/3/2016 Company: GE Contract

Process /Operation Lead Engineer GIZA Power plant-EGYPT-GE

• Lead operation engineer for (6*250 MW) GE - MS 9001FA gas turbine, Control system (Mark VIe)

• Commissioning and startup of turbine generator and their auxiliaries

• Commissioning and start up for water bath heater

From 24/12/2010 to 14/11/2012 Company: GE Contract

TOP /Operation Lead Engineer Sabiya CCGT Project-Kuwait-GE

• TOP Coordinator

• Commissioning Operations Supervisor for 3 GE 9FA/D11 2 on 1 Power Blocks

• Provided detailed daily reports on BOP system during construction stage

From 2/05/2010 to 31/10/2010 Company: GRANITE SERVICES INTERNATIONAL INC. GSII-GE

Coordinator Engineer Eslam workshop LNG Adecco project

From 15/10/08 to 5/12/2009 Company: GRANITE SERVICES INTERNATIONAL INC. GSII-GE

Shift Charge Operation Engineer Upper Egypt electricity Production Company, El Kureimat III project, Beni suef Egypt

• Shift operation engineer for (2*250 MW) GE - MS 9001FA gas turbine, Control system (Mark VI)

• Commissioning and startup of turbine generator and their auxiliaries

• Commissioning and start up for water bath heater

From 02/10/07 to 15/10/08 Company: GRANITE SERVICES INTERNATIONAL INC. GSII-GE

Shift Charge Operation Engineer Ras abou fontas project - Qatar, Doha

• Shift operation engineer for (3*250 MW) GE - MS 9001FA gas turbine, Control system (Mark VI)

• Commissioning and startup of turbine generator and their auxiliaries

• Commissioning and start up for performance heater&H2 generator cell& evaporative cooler

• Make Work permit & LOTO required

• Emergency diesel generator 1.8 MW (EDG)

• Black star diesel generator 17.8 MW (BSDG)

From 16/6/2006 to 02/10/2006 Company: Cairo electricity Production Company Cairo north power station.

Lead Operation Engineer Combined cycle project (Module II) 750 MW - EGYPT

• Shift operation engineer for (2*250 MW) GE - MS 9001FA gas turbine

• Control system (mark VI)

• Steam Turbine (1*250 MW) Alstom Power

• 3 Gas compressors (screw type), one stage, compression ratio 31:42 bar

• Two heat recovery steam generators (HRSG) Manufactured by NEM

• DCS control (Mark VI-E)

• Switchgear & electrical control room (GIS) & central control room (CCR)

From 26/3/2006 to 16/6/2006 Company: General Electric

Operation Engineer Cairo north power station – EGYPT

• Phase 2 during commissioning and startup of turbine generator and their auxiliaries

From 5/3/2003 to 26/3/2006 Company: Cairo electricity Production Company Cairo north power station

Operation Engineer Combined cycle project (Module I&II) 750 MW – EGYPT

• Commissioning and start up & operation for (2*250 MW) General Electric MS 9001FA gas turbine

• Mitsubishi gas turbine (2 x250 MW– Japan) & Netmation control

• Hitachi steam turbine (1 x250 MW– Japan) & Mark VI

• DCS control Foxboro

• Two heat recovery steam generators (HRSG) Manufactured by NEM

• 3 Gas compressors (screw type), two stages, compression ratio 28:42 bar

TRAINING COURSES

1. General electrical Company (4 weeks in USA): (250MW Power Station) Date: August 2005

- Gas turbine – Generator operations program

- NETDAHS Basic training

2. NEM company (1 weeks in Site Cairo north power station) Date: October 2005

- Job site operation training for HRSG.

3. KSB company (1 weeks in Site Cairo north power station) Date: April 2005

- Safe operation & maintenance for pumps.

4. Hitachi ltd company (2 weeks in Site Cairo north power station) Date: January 2006

- Plant operation of 259.5 MW Hitachi steam turbine generator

5. Bechtel company (4 months on Shoubrah El-Kheima training center) Date: November 2003

- Basics and site-specific training course constituting a program of concentrated study of power plant equipment and system theory and application.

6. Bechtel company (1 Weeks on Shoubrah El-Kheima training center) Date: April 2003

- Operation in Black Start

7. Cegelec company (1 weeks in Site Cairo north power station) Date: September 2004

- Operation & maintenance for protection system.

PERSONAL INFORMATION

• Marital Status: Married

• Nationality: Egyptian

• Date of Birth: January 24, 1977

• Phone: EGYPT : +201**-*******

• Mobile: Bangladesh: +880**********

• E-mail: ************@*****.***;************@*****.*** ;******.******@**.***

• Address: Borge Maka 15 May st - Shoubrah El-Kheima Cairo EGYPT

• Language: Arabic (Native) English (V. Good)

EDUCATION

B.Sc. of automatic control & measurement Faculty of Engineering at Benha 2002



Contact this candidate