Waleed Mohamed Ahmed Mouad
: Borge Maka ** May st Shoubrah El-Kheima- Cairo - Egypt.
Mobile: +201**-******* +880**********
************@*****.***
************@*****.***
******.******@**.***
GE Power Energy 20 Years Experience
From 20/3/2023 to till now Company: GE Contract
Lead Commissioning &Startup Unique Meghnaghat 588.31 MW CCPP at Sonargaon, Narayanganj, Bangladesh
• Commissioning and startup of Reduction Gas station RMS and Fuel Gas Booster compressors Ingersoll IR manufactory
• Commissioning and start up for Water Bath heater&H2 generator. Gas generator
• Commissioning and start up Multi-Shaft GT Frame 9HA.01, ST Model STF-A651, Control system (Mark Vie) and their auxiliaries.
• Built up PTW Office, Prepare procedure for Commissioning and Startup, TOP (Turnover packages),
From 20/7/2017 to 10/01/2023 Company: GE Contract
TOP Manager Waad Al-Shamal ISCPP-KSA-GE
• TOP Manager with GE at ‘Waad Al- Shamal -4 on 1 Block at 1390 MW with GE GT's 7FA.05/STG D6.4/ HRSG's and 50 MW
Integrated Solar Power Plan
From March 2017 to April 2017 Company: GE Contract
Process /Operation Lead Engineer SHOIBA Power plant-KSA-GE
• Commissioning and start up Alstom steam turbine 400MW After MI outage
• Commissioning and startup of turbine generator and their auxiliaries, such as seal oil system, Co2/H2 purging, CCW system, lube oil and hydraulic system, Brush gear test
From 15/6/2016 to 15/8/2016 Company: Shanahan Engineering Company-Alstom
Process /Operation Lead Engineer CCPP12 Power plant-KSA-GE
• Commissioning Operations Supervisor for 4 GE 7FA.05/Alstom steam turbine 345 MW on 1 Power Blocks
• Commissioning and startup HRSGS and their auxiliaries
• Commissioning and start up Alstom steam turbine
From 23/12/2012 to 15/3/2016 Company: GE Contract
Process /Operation Lead Engineer GIZA Power plant-EGYPT-GE
• Lead operation engineer for (6*250 MW) GE - MS 9001FA gas turbine, Control system (Mark VIe)
• Commissioning and startup of turbine generator and their auxiliaries
• Commissioning and start up for water bath heater
From 24/12/2010 to 14/11/2012 Company: GE Contract
TOP /Operation Lead Engineer Sabiya CCGT Project-Kuwait-GE
• TOP Coordinator
• Commissioning Operations Supervisor for 3 GE 9FA/D11 2 on 1 Power Blocks
• Provided detailed daily reports on BOP system during construction stage
From 2/05/2010 to 31/10/2010 Company: GRANITE SERVICES INTERNATIONAL INC. GSII-GE
Coordinator Engineer Eslam workshop LNG Adecco project
From 15/10/08 to 5/12/2009 Company: GRANITE SERVICES INTERNATIONAL INC. GSII-GE
Shift Charge Operation Engineer Upper Egypt electricity Production Company, El Kureimat III project, Beni suef Egypt
• Shift operation engineer for (2*250 MW) GE - MS 9001FA gas turbine, Control system (Mark VI)
• Commissioning and startup of turbine generator and their auxiliaries
• Commissioning and start up for water bath heater
From 02/10/07 to 15/10/08 Company: GRANITE SERVICES INTERNATIONAL INC. GSII-GE
Shift Charge Operation Engineer Ras abou fontas project - Qatar, Doha
• Shift operation engineer for (3*250 MW) GE - MS 9001FA gas turbine, Control system (Mark VI)
• Commissioning and startup of turbine generator and their auxiliaries
• Commissioning and start up for performance heater&H2 generator cell& evaporative cooler
• Make Work permit & LOTO required
• Emergency diesel generator 1.8 MW (EDG)
• Black star diesel generator 17.8 MW (BSDG)
From 16/6/2006 to 02/10/2006 Company: Cairo electricity Production Company Cairo north power station.
Lead Operation Engineer Combined cycle project (Module II) 750 MW - EGYPT
• Shift operation engineer for (2*250 MW) GE - MS 9001FA gas turbine
• Control system (mark VI)
• Steam Turbine (1*250 MW) Alstom Power
• 3 Gas compressors (screw type), one stage, compression ratio 31:42 bar
• Two heat recovery steam generators (HRSG) Manufactured by NEM
• DCS control (Mark VI-E)
• Switchgear & electrical control room (GIS) & central control room (CCR)
From 26/3/2006 to 16/6/2006 Company: General Electric
Operation Engineer Cairo north power station – EGYPT
• Phase 2 during commissioning and startup of turbine generator and their auxiliaries
From 5/3/2003 to 26/3/2006 Company: Cairo electricity Production Company Cairo north power station
Operation Engineer Combined cycle project (Module I&II) 750 MW – EGYPT
• Commissioning and start up & operation for (2*250 MW) General Electric MS 9001FA gas turbine
• Mitsubishi gas turbine (2 x250 MW– Japan) & Netmation control
• Hitachi steam turbine (1 x250 MW– Japan) & Mark VI
• DCS control Foxboro
• Two heat recovery steam generators (HRSG) Manufactured by NEM
• 3 Gas compressors (screw type), two stages, compression ratio 28:42 bar
TRAINING COURSES
1. General electrical Company (4 weeks in USA): (250MW Power Station) Date: August 2005
- Gas turbine – Generator operations program
- NETDAHS Basic training
2. NEM company (1 weeks in Site Cairo north power station) Date: October 2005
- Job site operation training for HRSG.
3. KSB company (1 weeks in Site Cairo north power station) Date: April 2005
- Safe operation & maintenance for pumps.
4. Hitachi ltd company (2 weeks in Site Cairo north power station) Date: January 2006
- Plant operation of 259.5 MW Hitachi steam turbine generator
5. Bechtel company (4 months on Shoubrah El-Kheima training center) Date: November 2003
- Basics and site-specific training course constituting a program of concentrated study of power plant equipment and system theory and application.
6. Bechtel company (1 Weeks on Shoubrah El-Kheima training center) Date: April 2003
- Operation in Black Start
7. Cegelec company (1 weeks in Site Cairo north power station) Date: September 2004
- Operation & maintenance for protection system.
PERSONAL INFORMATION
• Marital Status: Married
• Nationality: Egyptian
• Date of Birth: January 24, 1977
• Phone: EGYPT : +201**-*******
• Mobile: Bangladesh: +880**********
• E-mail: ************@*****.***;************@*****.*** ;******.******@**.***
• Address: Borge Maka 15 May st - Shoubrah El-Kheima Cairo EGYPT
• Language: Arabic (Native) English (V. Good)
EDUCATION
B.Sc. of automatic control & measurement Faculty of Engineering at Benha 2002