Post Job Free

Resume

Sign in

Mechanical Engineer Project Management

Location:
Winnipeg, MB, Canada
Posted:
December 01, 2023

Contact this candidate

Resume:

Resume

Page * of *

ROSHAN THAPA, EIT

*** ****** ***. ********, ********

Tel. : 431-***-****

Email: ad1mc5@r.postjobfree.com

Overview: Thorough Mechanical Engineer with strong attention to detail & skill in Project management of HVAC (Heating, Ventilation and Air Conditioning) system for residential and commercial buildings with efficient communication and co-ordination with concerned stack holders for successful output of the given task. . I am sociable, approachable and have a proven ability to work with all demographics, as well as with an internal team. Manage technical documents, Specifications and drawings with organized approach. I wish my professional experience in this regard will be adding value to your reputed Company. Work Experience

From - To Title Company Location Duties & Responsibilities May 15,2023

to18

Sept.2023

PM/Estimator (Mech) Ice Age

Mechanical

Ltd

Winnipeg,

Manitoba,

Canada

Check the new Tenders

through various web sites(

MERX,WCA,BGIS, Building

Connected etc.)

Get approval from

management for “GO” “NOGO”

and maintain the Tender Log

Sheet

Prepare the bidding

documents/take off qty. of

equipment and accessories

needed to complete the

project from the approved

drawings/specification

provided by Consultant

Communicate and manage site

visit/pre bid meeting

Prepare material submittals

and get quotation from various

suppliers and manufacturers

and issue purchase Order and

cost analysis.

Co-ordinate with

Client/Consultant/Supplier and

with internal team.

July 1,2019-

Mar. 21,2023

Sr. HVAC Design

Engineer

C-zone

HVAC Inc.

Kathmandu

Nepal

Design and Construction

Supervision of HVAC system

for residential and

commercial buildings(Hotel,

hospitals, Conference halls,

Resume

Page 2 of 4

Universities etc.) with

combination of Split, VRV heat

pump units, Chiller plants,

FCUs, AHUs, FAHUs, staircase

pressurization systems, Car

park smoke extract systems,

toilet extract systems .

Check material submittals as

per specs, Prepare HVAC BOQ,

Shop drawings, as built

drawings and properly

handover to the Client

Jan. 2009-

June 2019

Mechanical

Engineer till

Project Manager

RGM Int’l

LLC

Dubai, UAE Projects Involved :

1.Salma Dam Hydel Project,

Afghanistan 3X14 MW,

Francis Turbine, including

complete MEP System

including Power house HVAC

system ; Herat, Afghanistan

2.Charikar and Doshi

220/20 KV Substation,

Complete MEP system

Complete study of Mechanical

systems not limited to HVAC

system including

AHU/Chiller/Ducting system/lift/

water supply/fire fighting

,Erection testing and

commissioning of the project

> Construction management

and supervision

>Shop drawing preparation

> Prepare Bill of quantity based

on approved drawings

> Support for procurement of

the Equipment/ accessories in

order to Complete the project.

> Prepare the manpower and

tools/tackles list

> Prepare method statement of

erection of AHU/Chiller/fan coil

unit/Dampers/chilled water

piping/insulation /fire dampers

etc.

> Supervise /monitor and

control of Erection at

site/monitor DPR/MPR

> Commissioning and testing

the system as per contract

Resume

Page 3 of 4

specification

> Prepare As built drawings

> Close out the project

compiling all necessary

documents as per contract.

Dec.13,2005

- Dec.23,

2008

HVAC Project

Engineer(Mech)

Emirate

Falcon

LLC,

Subsidiary

of Arabtec

Dubai, UAE

Preparation of Shop drawings,

co-ordination drawings with

other services, Site construction

supervision,qty take off and

execution of HVAC system for

following high rise Towers

Assigned Projects:

1. DIFC Gate Village( 10

Towers with 10-12 storey

),Dubai, UAE

2.Dubai Maritime City, Dubai,

UAE

3.Burj Khalifa29&30 Plot, twin

tower 30 storey,Dubai, UAE

Aug15,2000

-

Nov.17,2005

HVAC Design

Engineer (Mech)

C-Zone

HVAC Inc.

Kathmandu

Nepal

Design & Supervision of

construction of Mechanical

systems not limited to HVAC

system for pharmaceutical

factories, hospitals, hotels,

commercial and residential

buildings

Assigned Projects:

Tribhuvan International Airport,

sterile area

Kali Gandaki Hydel project,144

MW

Lomus Pharmaceutical Pvt. Ltd.

Alliance Pharma, Simara

Quest Pharma, Birgunj

July 1997 –

July 2000

HVAC

Engineer(Mech)

Statkraft

Annleg

(Norway)

& HH(Nepal)

Consortium,

(Civil

Construction

Consortium-

CCC)

Dolakha,

Nepal

Site technical design &

execution of Mechanical systems

not limited HVAC system/piping,

ducting for power house which

is located 900m inside

mountain, control rooms &

residential buildings for staffs.

Assigned Project:

Khimti Hydel project, 60 MW ;

Dolakha, Nepal

Resume

Page 4 of 4

Sept 29,1996 –

March 10,

1997

Mechanical Site

Inspector

NEPECON(Nep

al Engineering

Consultant)

Pokhara,

Nepal

Inspect construction of 760 KL

capacity oil tanks (as per API

650 ) project funded by ADB to

Nepal oil corporation, Pokhara

Assigned Project:

Fuel Storage Tank, Nepal Oil

Corporation, Government of

Nepal

Academic Qualification

1

1991-1996

Master of Science in Mechanical Engineering with

Distinction (Air conditioning and life supporting

system) Equivalent to Canadian Bachelor and Master Degree in Engineering conducted by WES,Canada

Odessa State Academy of

Refrigeration, Ukraine

1

1986-1988

Proficiency Certificate Level (IE)in Refrigeration and Air Conditioning Engineering

Pulchok Engineering

College under Tribhuvan

University, Lalitpur, Nepal

1

1975 -1985

School Leaving Certificate

Bhanu Madhyamik

Vidhyalaya, Kathmandu

Professional Certificates i) Valid Membership ASHRAE ; No. 8140746 since 2014

ii)Green Associate @LEED(

USGBC) No. 11315426 since

2019

iii)Engaged Member : NFPA

iv)Nepal Engineering Council

/Reg. no.66 /Category :A /Issued

on Sept 8,2000

V) An Intern with Engineers

Geoscientists Manitoba

Languages Nepali, English, Hindi, Russian,

French (Beginner)



Contact this candidate