Archie S. Gayongan
Bldg. * Unit ***, FTI MRB Family Townhomes Western Bicutan Taguig City
+639********* ********@*****.***
Chief Surveyor / Land Surveyor
OBJECTIVE:
To serve the organization as a hard worker in this competitive environment discharging all my professional skills and to be part of an organization that provides an atmosphere of mutual growth and benefits, Where I can show my talent and potential as best employee. And to work in Tandem with a team in a challenging environment where I could Improve my knowledge, capabilities and put them to use for the development of the organization PERSONAL INFORMATION: DEPENDENTS
Birth Date: Sept. 24,1982, Age: 4 y/o Aries Emmanuel E. Gayongan April 4, 2009 Gender : Male Aaron Miguel E. Gayongan September 14, 2010 Civil Status : Married Amara Sophia E. Gayongan August 3, 2013 Religion : Protestant Amber Scarlett E. Gayongan May 14, 2020 Citizenship : Filipino Mrs. Emma E. Gayongan Spouse Height : 5’5”
Weight : 71 kl
EDUCATION:
School: Southern Mindanao Colleges S.Y. 2001-
2006 Bachelor in Science Geodetic Engineering
School: Holy Chile Academy S.Y. 1996-
2000 High School Diploma
School: Sto. Nino Elementary School S.Y. 1990-
1996 Primary Diploma
EXPERIENCE:
Company: Pasay Harbor City Corporation
Rule: Geodetic Engineer May 2023 - Present
Project: 265 Hectares Reclamation Project
Client: Government of the Philippines
Main Project Features: 265 Hectares Reclamation Projects Activities Perform:
Review and verify the correctness of submitted survey reports, mathematical calculations, and other survey-related documents. Lead and conduct bathymetric and topographic surveys for dredging and reclamation projects of the company. Analyze and interpret the data gathered to ensure adherence to Employer's Requirements and survey standards. Coordinate with other teams and participate all survey-related activities of the project. Create and submit regular survey reports. Responsible for the maintenance, calibration, and/or purchase of surveying instruments and accessories. Perform other technical and administrative tasks.
1. 265 Hectares Reclamation Project
Company: Prime Metro BMD
Rule: Chief Surveyor February 2023 – May 2023
Project: Upper Wawa Pumping Station Location: Antipolo Rizal, Philippines Client: Government of the Philippines
Main Project Features: Permanent Access Road 2500M, 1000M Tunnel, Shaft 60M Deep, Pumping Station
Activities Perform:
Survey Department Head, making survey daily monitoring report and as-built survey data to the respective manager and department heads, Making schedule for Survey team's for day shift and night shift, Make convergence report every week for monitoring at slope, tunnel East portal, Shaft west portal.
1. Shaft West portal
2. Access Road and Tunnel Project
Company: Prime Metro BMD March 2020 - February 2023 Rule: Chief Surveyor
Project: Detailed Engineering Design of Montclair Access Road and Bridge Location: Pampanga, Philippines
Client: Private Firm
Main Project Features: The project involves Interchange and Access Road (3000M), Two Bridges (60M), Drainage (1000M), Sewerage Pipe (500), Electric Post, Road Signage, Toll Plaza
Activities Perform:
Survey department head, Preparation of survey data for 3DMC and Pocket 3D, Making surface model surface of the project, Responsible for all survey works from established of horizontal and vertical benchmark control to grid lines marking, Mechanical layouts, Bolt settings, Plumpness of bored pile for bridge and columns, Roads alignment from subgrade level, basecourse level to finished grade level of roads, Making longitudinal and cross section profile, Volume computation, Supervision on land development and Survey data, Topographic survey, Gathering As-built survey data of the project.
1. Montclair Interchange Project
2. Montclair Access Road project
Company: Sta. Clara International Corporation June 2019 - March 2020 Rule: Chief Surveyor
Project: Underground Utilities Meralco
Location: Bulacan, Philippines
Client: Private Firm
Main Project Features: Horizontal Directional Drilling Activities Perform:
Established benchmark horizontal and vertical for the drilling, Preparation of as-built survey existing underground utilities like water, drainage, electrical, sewer. Survey layout of drilling location entrance and exit, established survey markings elevation prior to start HDD. Prepare as built survey data after horizontal directional drilling complete. 1. Horizontal Directional Drilling Underground Utilities
Company: Sta. Clara International Corporation WLL. April 2018 - April 2019 Rule: Surveyor
Project: Underground Utilities of Electrical and Sewerage system Location: Qatar
Client: Qatar Government
Main Project Features: Horizontal Directional Drilling and Micro Tunnel Boring Machine Activities Perform:
As built Survey of existing underground utilities like water line, telephone line, sewer line, optic fiber, military optic fiber lines, high and low voltage lines of electricity. Survey layout of HDD and MTBM location entrance/exit, Survey marking of level prior for drilling, As built survey after drilling and preparation of survey data 1. Tunnel Boring Machine and Horizontal Directional Drilling Project
Company: Sta. Clara International Corporation January 2013 - April 2018 Rule: Surveyor
Project: Water Supply Improvement, Wind Turbine Farm (54 Mega Watts), Sewerage Treatment Plant (100MLD), North Pumping Station Location: Cardona Rizal, Pasig City, Pililla Rizal, Marikina City Philippines Client: Private Firm
Main Project Features: Water Treatment Plant, Horizontal Directional Drilling Tunnel Boring Machine, 27 Wind Turbine 2 Mega Watt 5000M Access Road, Sewerage Treatment Plant
30M Deep Pumping Station.
Activities Perform:
Preparation of survey data, Responsible for all survey works from established of horizontal and Vertical benchmark control to grid lines markings, mechanical layout, bolt settings, Plumpness of Reinforcement wall, Columns, Road alignment from subgrade level, basecourse level to finished grade level of roads, longitudinal and cross section profile, Volume computation, Supervision on land development and survey data, Topographic survey data. 1. Cardona Water Treatment Plant
2. Cardona Water Treatment Plant Intake
3. 54 MW Wind Turbine Project 4. 100 MLD Sewerage Treatment Plant
Company: The New Apec Development Corporation Surveyor April 2011 -January 2013 Rule: Surveyor
Project: Detailed Engineering Design and Construction Supervision of Various Commercial and Residential Structure
Location: Biñan, Laguna Philippines Client: Private Firm Main Project Features: Land Development, Commercial and Residential Structure, Roads, Drainage, Water lines, Electric Post
Activities Perform:
Responsible for survey layout of road alignment, Drainage system, Water lines location, Electrical post, Layout of House and Lot Location. 1. Land Development, Commercial and Residential
Company: RVAB Konstruc INC. January 2010 - April 2011 Rule: Project in Charge
Project: Plumbing Works and Automatic Fire Protection Works Sprinkler system Installation Location: Ortigas Mandaluyong City, Philippines
Client: Private Firm
Main Project Features: Strom drain Installation, Plumbing works, Water lines Automatic sprinkler Installation
Activities Perform:
Responsible for work activities schedule on site, Over all work supervision for installation of plumbing works and sprinkler system, Making worked schedule, Attending for weekly management meeting, Making progress monthly billing. 1. 17th Floor Midrise building Plumbing works and Sprinkler Installation
Company: Solar Surveying Company March 2007 - September 2009 Rule: Surveyor
Project: Survey Manpower Supply for Various Infrastructure Project. Location: Carmelry Laguna, Tiwi Albay, Sual Pangasinan, Brgy. San Miguel Pangasinan, Sorsogon Provence, Philippines Main Project Features: Wyeth Dryer 3 plant, Chevron Geothermal Plant, Sual Coal Power Plant, Cadastral Survey,
Over Head Transmission Line
Activities Perform:
Making Longitudinal and Cross section profile, Volume computation, Supervision on land development and land survey, Topographic survey and Micro leveling survey, Survey layout of new well for proposed geothermal location and Layout of Overhead transmission line for National Grid Power Corporation
SKILLS: SOFTWARE USE:
3D Scanning 12D Model14
Topographic Survey 3D Office
Land Surveying Pocket 3D
Bathymetric Survey Geographic Information System (QGIS) Micro Leveling AutoCAD
Cadastral Survey SW_Digital Terrain Model (SW_DTM) Horizontal Directional Drilling (HDD) Civil 3D Land desktop Micro Tunnel Boring Machine (MTBM)
SURVEY INSTRMENT USE:
Global Navigation Satellite System (GNSS) Model: Trimble R780, Topcon FC5000 Total Station (TS) Model: Trimble C5, Topcon GM series, Nikon, Horizon Automatic Level (Auto-Level) Model: Topcon B4 series, Sokkia, Nikon Micro Level Model: Topcon DL 500, Sokkia
3D Scanning Model: Leica BLK2GO, Leica RTC 360 3D Laser TRAINING / SEMINAR
SUBJECT TRAINING CENTER ADDRESS DATE
Pocket 3D
3D Office
Fundamental of 3D
Machine Control
3D machine Control
(Excavator,Grader,Dozer)
Montclair
Interchange Project
Porac, Pampanga
Philippines
March 16 – August 31 2020
12D MODEL
Survey Earthworks
Modeling in 3D
16th Floor Three E-
Com building
Bayshore cor. Ocean
Drive, Mall of Asia
Complex, Pasay City,
Philippines
February 18 – 20, 2020
Advanced GIS Training Using
Quantum GIS
NAMRIA Geomatics
Training Center
Lawton Avenue, Fort
Bonifacio, Taguig City
M.M Philippines
September 25 - 29,2017
Basic GIS Training using
Quantum GIS
NAMRIA Geomatics
Training Center
Lawton Avenue, Fort
Bonifacio, Taguig City
M.M Philippines
August 22 – 25, 2017
Safety, Operation and
Maintenance Training
VERMEER Southeast
Asia
Pasig City, Philippines December 14, 2015
Aerial Platform and Scissor
Lift Safety
World Safety
Organization
RVAB Konstruct Inc.
Sucat, Parañaque City
Philippines
March 6, 2010
First Aid Training
Philippine National
Red Cross
PNRC-NHQ Social Hall
Fort Bonifacio Drive,
Port Area, Metro
Manila Philippines
July 9 – 12, 2007
Basic Life Support
Philippine National
Red Cross
PNRC-NHQ Social Hall
Fort Bonifacio Drive,
Port Area, Metro
Manila Philippines
July 13 – 14, 2007
Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experiences, and I am available to undertake the assignment in case of an award. I understand that any misstatement or misrepresentation described herein may lead to my disqualification or dismissal by the Client, and/or sanctions by the Bank.
Archie S. Gayongan Date