Post Job Free

Resume

Sign in

Auto Cad Material Handling

Location:
Dubai, United Arab Emirates
Posted:
November 02, 2023

Contact this candidate

Resume:

Curriculum Vitae

CIVIL DRAUGHTSMAN

VINEETH.K.P

Cell Phone- +971-*********

E-mail ad0tpz@r.postjobfree.com ad0tpz@r.postjobfree.com

Permanent Address : Melathiyadam, Sreestha (P.O) Kannur, Kerala 670303 India I have been working since the last 11 years as Auto Cad Draughtsman. During my work experience in the above field it has been realized that I would be able to render my ability and experiences in a reputed organization. I promise to contribute my maximum eligibility, capability up to the satisfaction and success of the organization.

Preparation of Structural Drawings.

Preparation of Architectural Drawings.

Preparation of Shop drawings.

Preparation of As-built drawings.

Reinforcement Detailing.

Plotting and copying of drawings.

LARSEN & TURBO LIMITED, DUBAI

Position: Draughtsman

Duration: Since APRIL 2021

Current project:

ETHIHAD RAIL STAGE 2& 3 PROJECT D0203 - PACKAGE 2F2 Etihad Rail-Package 2F2 is part of an Etihad Rail project at 6 locations of United Arab Emirates. The project construction works include Design, Engineering, Procurement, Construction & Commissioning of Bulk Material handling systems (Rail loading & unloading systems) with associated civil & structural works, bulk material storage facilities, General cargo & Container handling facilities with freight terminal management & control system. All the freight stations shall include railway siding & track works apart from other infrastructure work such as bridges, buildings, roads & drains, water & electricity utility systems. RAQ CONTRACTING CO LLC, PB BOX-235988 DUBAI, U A E. Position: Draughtsman

Duration: From JUNE 2018 to JULY 2020

Project Worked:

Proposed 2B+G+29 Residential and Commercial Building for Danube, U.A.E.

Construction, Maintenance& Guarantee of (P39) Development of Plot 9W at Dubai Airport free zone for M/sDAFZA.

Proposed Fabrication Shop& Office Development on Plot No:5333570 for Galadari Engineering-DIC,Dubai,U.A.E

CORE COMPTENECIES

PROFESSIONAL EXPERIENCES

OVERVIEW

Curriculum Vitae

NATIONAL WHEEL J&P LLC. DUBAI,U.A.E

Position: Draughtsman

Duration: May 2016 to May 2018

Project Worked:

A50 - Yas Island Development Project - West Zone (USD 61,798,260) Yas Island, Abu Dhabi The works provide roadway, infrastructure and marine to support the development of West Yas Island.

Civil & Infrastructure Works consist of enabling works - Site grading, new road construction including associated precast concrete kerb/gutters, lighting, signage, traffic signals, pavement marking and protective barriers;

Constructionof vertical quaywall,rock,revetment coping, strengthening of existing shoreline, water taxi stops.

Infrastructure works consist of Potable Water & Firefighting Network, Sanitary Sewer Network, Storm water Network & Outfall structures, Electrical Network incl. 27 Nos Substations, Street Lighting & Traffic Signals, Irrigation Main Distribution Network, Civil works for Telecommunication Network, Gas Network (Design & Build).

Emirates Flight Training Organization (USD 24,480,000) Airfield Infrastructure EKFTO, DWC, Jabel Ali, Dubai

Roadway &Infrastructure Works at the Airfield of the EK Flight Training Organization Facilities at Dubai World Central. Work includes earthworks for flight embankments, paving Runway 13/31, Taxiways, Aprons and existing roads as well as the construction of the foundations for various sheds. Work also includes water supply, firefighting, sewage, storm water drainage networks, electrical network (MV, LV) and telecommunication network to cover the new AFL installations, together with erection of street/fence lighting, border fences and gates.

DUBAI CREEK HARBOR ISLAND DISTRICT: -

The Dubai Creek Harbor Development-Phase1,Island District Roadway &infrastructure works will be developed by the Lagoons Phase One LLC.The Construction activity for infrastructure works executed by Wade Adams contracting (LLC)-National Wheel J and P

(LLC Joint venture.

The Project is being developed in phase and districts, with Phase 1 representing a significant portion of the project, centered around a central 10.30axis and covering the Island Project, Creekside Park District, Urban core District and retail District, together with the primary road and Infrastructure work. The development of infrastructure that support the buildings includes the construction of roads network,North&South Island Bridges, Retaining walls for the Island District, Construction of Utility Networks as per the Drawings, provision of roadwork elements including road markings,streetlighting,including Landscape lighting with in right of way. Traffic signals, traffic signage, barriers,kerbs,guardrail,footpath,cycletracks,laybays,parking bays and the like on the primary and District Roads.

ATHENA EMIRATES LLC. ABU DHABI, U.A.E

Position: Auto Cad Draughtsman

Duration: May2013 to May 2016

Projects Worked:

Baraka Nuclear Power Plant Project for Emirates Nuclear Energy Corporation. (The projects carry out the work to install the Shore Protection works like Revetment and Retaining Wall, Phase 2 Construction Wharf and Installation of Cofferdam & Cut-off wall for units 3&4 and associated work in accordance with the BNPPProject).

SHIMIZU CORPORATION INDIA LTD. (BANGALORE, INDIA)

Position: Draughtsman

Duration: January 2012 to April 2013

Curriculum Vitae

Project Worked:

Honda Motor Cycles and Scooters India (HMSI) Factory#3

(HMSI, a wholly owned subsidiary of Honda Motor Company, Japan. This is the company's first two-wheeler manufacturing unit in south India).

consist of water supply and Storm Water Collection. CONSULTING ENGINEERING SERVICE,Pvt. Ltd, TRIVANDRUM, INDIA Position: Draughtsman

Duration: From May 2010 to Dec.2011

Projects Worked:

Athletics Stadium for National Games at Kerala

Vikram Sarabhai Space Research Centre-Ancillary Buildings SHAH TECHNICAL CONSULTANTS. Pvt. Ltd, MUMBAI,INDIA Position: Draughtsman

Duration: From July 2007 to April 2010

Projects Worked:

Kerala Sustainable Urban Development Project

The Project involves the improvement, upgrading and expansion of existing urban infrastructure facilities and basic urban environmental services (water supply, sewerage and sanitation, urban drainage, solid waste management and urban roads and transport) in five municipal corporations and 53 municipalities of the State of Kerala.

Bangalore Water Supply and Sewerage Project

(The projects consists of Roadway water supply and sewerage treatment system covering more than 200sq.Km).

ITC Civil Draughtsman (2002-2004)

(Co-Operative Industrial Training Centre, Government of India)

Vocational Higher Secondary Education(2000-20002)

(Government of Kerala, India)

S.S.L.C – Kerala Higher Secondary Education.(2000)

(Government of Kerala, India)

Auto CAD, MS Office

• Nationality : Indian

• Languages : English,Hindi,Malayalam,Tamil

• Date of Birth : 01-06-1985

• Passport No. : V 5149535

I hereby declare that the above-furnished details are true and correct to the best of my knowledge.

QUALIFICATIONS

COMPUTER QUALIFICATION

PERSONAL DETAILS

ASSURANCE



Contact this candidate