Post Job Free

Resume

Sign in

Project Manager Construction

Location:
Mukwonago, WI
Salary:
88,000/year
Posted:
November 01, 2023

Contact this candidate

Resume:

MARANDA

WOODWARD

CONSTRUCTION PROJECT

MANAGER

262-***-****

ad0srg@r.postjobfree.com

East Troy, WI 53120

CONTACT

SKILLS

• Status Meetings

• Document Review

• Site Inspection

• Municipal Projects

• WisDOT Projects

• • Survey (GPS, Optical, Total Station)

• • Civil 3D

• • Arch Maps (GIS Data Entry)

• OSHA Safety Requirements

• Reading Blueprints

• Change Orders

• Subcontractor Relations

• Microsoft Office

• Inspection Principles

• Construction Equipment

• Project Records

• Calculations and Measurements

• Hardworking and Reliable

• Energetic and Positive

• Team Meetings

Specification and Blueprint

Interpretation

Hardworking, highly motivated forward-thinking and detail-oriented individual who operates well in both individual and team capacities, leveraging seasoned work ethic to quickly adapt to different processes With 23 years of significant experience and working knowledge in transportation construction engineering, construction management and inspection, fully versed in bridge, roadway, sanitary, storm drain assessment and brings in-depth knowledge of steel, masonry, asphalt, aggregate, and concrete materials to ensure the safety and durability of new construction. Background includes materials testing, with a focus on field and laboratory testing of soils, concrete, and asphalt, as well as construction quality assurance, program controls, and knowledge of construction materials, specifications and methods for numerous WisDOT construction projects as well as Municipal projects. CAREER OBJECTIVE

Construction Project Manager

KSINGH and Associates, Milwaukee, WI

EXPERIENCE

March 2022 - Present

• Drafted and executed project CMJ's, WAF's, RFI's, and CCO's. Organized weekly progress meetings via Teams with contractors and staff members in order to discuss upcoming tasks, objectives, challenges.

• Reviewed job specifications to determine appropriate construction methods. Monitored progress of construction activities on a daily basis, entered postings, reviewed project material submittals and submitted project estimates.

Fond Dulac Ave (STH 145); Grantosa, Flagg/Florist Bridges; Good Hope Rd to W County Line; Various Bridge Locations; Good Hope Rd Interchange to 68th Street.

Project 1360-11-70 - Project consisted of HMA pavement, concrete base, concrete approach slabs, lighting, repair and placement of slope paving and deck replacement (B-40-278 and B-40-279), concrete surface repairs and repairs of slope paving (B-40-280 and B-40-281), erosion control, pavement marking, traffic control, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.

Project 1360-15-70 - Project consisted of grading, milling, base aggregate dense, HMA pavement, base patching, reconstructing inlets and adjusting inlet covers, concrete repair and replacement, curb and gutter, concrete barrier, guardrail, lighting, traffic signals, girder and pier bearing repainting (B-40-280 and B-40-281), sign structures (S-40-3024, S-40-3025, S-40-3026, S-40-3027, S- 40-3028, S-40-3029, S-40-3030 and S-40-3031), erosion control, pavement

• Estimating

• Management

Engineering Technician IV

City of Waukesha, Waukesha, WI

Monitored various municipal roadway projects within the City of Waukesha. Engineering Specialist Advanced

marking, traffic control, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. Project 1360-16-70 - Project consisted of milling, base aggregate dense, HMA pavement, guardrail, erosion control, pavement marking, traffic control, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.

Project 1360-17-70 - Project consisted of polymer overlay (B-40-271, B-40-272, B-40-274, B-40-275, B-40-276, B-40-277, B-40-328, and B-40-766), concrete repair and wingwall strap installment (C-40-5/8 and C-40-6/9), erosion control, pavement marking, traffic control, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. [2022 March to M

CTH Q and CTH U, Village of Bristol - Kenosha County - Work consisted of storm sewer, common excavation, aggregate base, concrete curb and gutter, asphaltic surface milling and pulverizing, asphalt pavement, signing, pavement marking, signing, traffic signals, restoration, traffic control, erosion control, concrete masonry culverts, pavement marking, clearing and grubbing, and HMA pavement bike path. [2022 May through December]

2023 (February through December) - IH 41/USH 45, Milwaukee - Fond Du Lac; Washington Co Line to USH 45 - Work consisted of removing old structures, milling existing asphalt, excavation for structures, excavation common and grading, base aggregate, HMA pavement, bridge re-deck, bridge concrete overlay, bridge painting, expansion joint and approach slab replacement, cable barrier, guardrail, concrete masonry culverts, retaining walls, sidewalk and curb ramp replacement, storm sewer, pavement marking, signing, sign Structure S-66-401, restoration, erosion control, traffic control, staking, electrical, ITS and communication systems.

March 2018 - March 2022

• Sanitary Sewer Inspections

• Storm Sewer Inspections

• GIS Data Entry

• Survey – stake-out, control, topography

• Create survey points in Civil 3D

• Worked with coworkers to complete tasks.

Demonstrated ability to manage multiple tasks while remaining adaptable and flexible.

Skilled in using various software applications and programs including Microsoft Office and Adobe Creative Suite.

Identified ways to improve efficiency in operations and implemented process

• changes.

Collaborated with departmental leaders to establish organizational goals, strategic plans and objectives.

• Troubleshot minor problems and reported larger technical issues. May 2011 - March 2018

AECOM Technical Services, Milwaukee, WI

Wisconsin Department of Transportation, I43 North-South Freeways, (Valley Bridges) Milwaukee, Wisconsin.

Wisconsin Department of Transportation, IH-43/94 Bridge Rehabilitation - Construction Related Services, Milwaukee, Wisconsin. Wisconsin Department of Transportation, Zoo Interchange - Phase 2, Milwaukee, Wisconsin.

Wisconsin Department of Transportation, University Avenue - CTH MS - Allen Boulevard to Segoe Road, Middleton, Wisconsin.

Wisconsin Department of Transportation - Southeast Region, I-795 East-West Freeway Construction Related Services, Milwaukee, Wisconsin. Wisconsin Department of Transportation - Southeast Region, I-94 Eastbound, Milwaukee, Wisconsin.

Wisconsin Department of Transportation, CTH P Interchange, Oconomowoc, Wisconsin.

Office Engineer for the $27.6 million reconstruction of I-43/1-94 (3.86 miles) from National Avenue to the Menomonee River. Major items include bridge deck overlays, bridge deck replacements, median shoulder reconstruction, mill and overlay, as well as bridge painting. [05/09/2013]

Office engineer on the rehabilitation of I-94/ I-43 between the Mitchell interchange and the Marquette interchange. The project was approximately four miles in length in each direction with approximately 1.6 miles of structures and 2.4 miles of roadway. Structure work consisted of removal of the existing overlays, concrete deck repairs, and the replacement of the overlays. Mainline roadway work consisted of milling the existing asphaltic surface, base patching any deficient areas, and the complete removal and replacement of the concrete shoulder, as well as the replacement of the top two lifts of asphaltic surface. The project also included significant portions of bridge girder blasting and recoating.

[02/04/ 2013 - 01/30/ 2014]

Construction inspector on signature pedestrian bridge connecting Children's Hospital and the Ronald McDonald House spanning over Watertown Plank Road. The structure consisted of four separate units and included slab span sections, truss section, and several retaining walls. [03/03/2014-04/30/ 2014]

Construction inspector and certified testing coordinator for the 1.9-mile major urban corridor reconstruction. The project included a 105-foot-long pedestrian underpass with decorative surface treatments, two box culvert extensions, 13 modular block MSE retaining walls, four signalized intersections, and all lighting for the $12.7 million construction project. [07/ 23/2012-01/ 01/ 2013]

• Assisted with project closeout. [07/15/2012-08/28/2012] Construction inspector overseeing major urban freeway rehabilitation on eastbound I 94 from 70th to 32nd Street. Project consisted of fast-track rehabilitation of the interstate beginning in early February with construction completed on the mainline prior to June 22nd. Work included milling, base patching and shoulder replacement and an overlay on the mainline pavement as well as two deck replacements, three fully reinforced concrete deck overlays, two deck overlays, painting of numerous structures, two epoxy overlays in Waukesha County, emergency base patching in the Zoo interchange, and the realignment of three major ramps in the Marquette interchange. Work was constructed in stages and offered numerous challenges as the existing shoulder proved inadequate to maintain traffic. Work was completed ahead of the stated schedule. [02/04/2012-07/14/ 2012]

Documents Control Specialist

Buveck Consultants, Milwaukee, WI

Wisconsin Department of Transportation, I94 North-South Freeway, Milwaukee, WI.

Wisconsin Department of Transportation, STH 241(27th Street) Bridges and Approaches, Milwaukee, WI.

Certified Testing Coordinator

Geotest, West Allis, WI

Engineering Specialist

DAAR Engineering, Milwaukee, WI

STH 26 - Church Street, City of Watertown

USH 12 over STH 120, Walworth County

STH 59 - Jefferson County Line, Jefferson County

Construction inspector and certified testing coordinator for the $400,000 construction management project of CTH P consisting of earthwork, grading, base aggregate, granular base material, concrete pavement, hot mix asphalt and stone matrix asphalt pavement, removing old Structures B-67-76 and B-67-77, new pre-stressed concrete girder bridges B-67-274 and B-67-275, retaining walls R-67-99 and R-67-100. [05/09/2011-02/13/ 2012]

May 2009 - May 2011

Document control administrator for the North-South program controls team. Major activities included transcribing and distributing meeting notes, logging correspondence sent/ received, searching and providing requested documents from the client, providing quality control on all document entries in contract manager, and creating and monitoring program and design issue logs.

Construction inspector and certified testing coordinator for structures over I- 894/I-43. Work included two 4-span pre-stressed concrete girders, concrete paving and preparatory work for the future Mitchell Interchange construction.

Served as Document Control Lead, completing meeting notes, updating existing contact information, Quality Assurance of Info (check duplicates, promotions), logging correspondence, tracking and searching correspondence.

September 2005 - September 2009

• Certified Testing Coordinator/Project Manager

• Marquette Interchange

• Wolf Asphalt Paving

• Municipalities and Local Programs

September 2001 - September 2005

Certified Testing Coordinator, Engineering Specialist on $400K construction management project of STH 26 designed to increase capacity, improve traffic flow, improve drainage, and preserve the safety of the roadway.

Certified Testing Coordinator, Engineering Specialist for the $1M Bridge Re- decking Project encompassing two structures over STH 120. Staged construction performed under traffic.

A $550K, 304-mile Rural Resurfacing Project consisting of milling existing

• asphaltic pavement, asphaltic base patching concrete pavement, Type E-3, curb STH 32, Interstate 43 - South Port Washington City Limits, Ozaukee County STH 36, City of Burlington, Racine Wisconsin

STH 20, City of Racine, Racine County

Village of Menomonee Falls, Waukesha County

STH 57, Sheboygan County

City of Columbus, Columbia County

and gutter, crushed aggregate base course, intersection improvements, pavement marking and removal and replacement of signing. All work was performed under traffic and safety improvements including new beam guard rails.

Certified Testing Coordinator, Engineering Specialist for the $8M reconstruction and safety improvement of 2.81miles of deteriorated STH 32. The two-stage project consisted of rubblilzing existing concrete pavement, improvement of sight lines, intersection realignment, and construction of turn lanes, storm sewers, and upgrading from four lanes undivided to four lanes divided with a wider median. The project also included new concrete surface on STH 32 Bridges over IH 43.

Certified Testing Coordinator, Engineering Specialist for the $2.3M urban

• reconstruction project constructed under traffic. Certified Testing Coordinator, Engineering Specialist for the $2.9M urban reconstruction project. The work consisted of concrete bases course, asphalt concrete base course, storm sewers, traffic signals and street lighting.

Certified Testing Coordinator, Engineering Specialist for the $1.75M urban reconstruction project. The work included sidewalks, retaining walls, street lighting, and landscaping.

Certified Testing Coordinator for the $3.3M rural reconstruction and re-paving

• project.

Certified Testing Coordinator, Engineering Specialist for the $1.75M urban reconstruction project. The work consisted of concrete base course, asphalt concrete base course, storm sewers, and traffic signals.

High School Diploma

East Troy High School, East Troy, WI

EDUCATION

June 2000

CERTIFICATIONS

• • Certification in Portland Concrete Cement - 2022

• Certification in Nuclear Density Testing - 2022

• Primavera Scheduling P6

REFERENCES

References available upon request



Contact this candidate