Adequacy for the Assignment:

Mechanical Engineer with 17 years of experience in Heavy Industry including Power Generation. Dealing with all aspects of construction, pre-commissioning, commissioning, operations & maintenance, and consultancy services. Tendering assessment, bid documentation & sub- contractor evaluation. Design, specification preparation and evaluation. Experience in vendor surveys, Project procurement, Technical Audits, Document control, Document authoring and Review, Extensive Project Management Experience, and a good Engineering background with design capability in specific areas. Extensive experience with Gas & Steam Turbines (Simple Cycle and CCGT), Boilers (Prime & HRSG), Tankage, compressors, and Various Power Plant BOP Equipment. Troubleshooting & Equipment Survey and Repair Recommendations. Familiar with ASME and ANSI Standards, Manufacture, Welding, Testing and Commissioning. Having previously worked in locations worldwide on short and long-term assignments, specifically in: Saudi Arabia and Egypt.

Education:

Degree : B. Sc. of Mechanical Engineering, 2004, Asyut University Postgraduate: Two years Master in Thermal power plant Asyut university. WORK EXPERIENCES:

FROM SEP 2022 TO TILL NOW

SHANAHAN ENGINEERING LTD. KSA RIYADH

MECHANICAL COMMISSIONING ENGINEER

PROJECT: PP14 CCPP

PROJECT SUMMARY : 3X3X1 GE GT FRAME 7FA.05 AND GE STG FRAME D11, HRSG STF.

● Steam Blowing (continuous steam blowing, Check CFR, and target,

● lube oil flushing (adjusting throttle valve and lifting the shaft) and adjusted the sensor for bearing,

● Check all activity before starting the steam turbine,

● Control oil system, steam turbine controller)

● Turning gear operation and function test on TG operation,

● Protection test for steam turbine,

● Steam Turbine valve test ATT

● Follow for all activity for HSRG (boiler feed water pump recirculation pump

● Preservation DRUM HSRG by nitrogen

● Follow all commissioning activity for PSV and setting.

● Follow all commissioning activity for Fuel gas compressor, dew point heater scrubber PRV,

● Commissioning for HYDROGEN unit

● Steam purity specification and bypass operation) Valve test and preparation for start ST.

● Check all electrical test and synchronization.

● Send all RFI and report about any problem in ST.

● Reporting to the Commissioning manager,

FROM JULY 2021 TO AUGUST 2022

MIDDLE EAST OIL REFINING COMPANY

CUSTOMER: MIDOR

POSITION: FIELD SERVICE ENGINEER WITH BAKER HUGHES, GE COMPANY, LOCATION: EGYPT ALEXANDRIA .

Probation test for reciprocating gas compressor 6HF/3 &4HF/3 and 2Hd/1

Check process gas P&D Diagram,

Check the piston, cross head, and crank shaft,

Check all the system for compressor.

Check and adjusted lubrication system,

Tempered water console flushing,

Mechanical run test unload,

Reporting and Coordination between the Customer and the Company, FROM APRIL 2021 TILL JUNE 2021

DUBAL CCPPH CLASS H COMBINED CYCLE POWER PLANT 650 MW CLIENT : SIEMENS

LOCATION : DUBAL DUBAI UAE

POSITION : MECHANICAL COMMISSIONING LEAD.

● Steam Blowing (continuous steam blowing, Check CFR, and target

● lube oil flushing (adjusting throttle valve and lifting the shaft) and adjusted the sensor for bearing,

● Check all activity before starting the steam turbine,

● Control oil system, steam turbine controller)

● Turning gear operation and function test on TG operation,

● Protection test for steam turbine,

● Steam Turbine valve test ATT

● Steam purity specification and bypass operation)

● Valve test and preparation for start ST,

● Check all electrical test and synchronization.

● Send all RFI and report about any problem in ST.

● Reporting to the Commissioning manager.

DURATION: FROM AUG 2018 TILL DEC 2019

FERTILIZERS COMPLEX IN SOKHNA (FCS) WITH INTECSA COMPANY COMMISSIONING AND START UP TEAM LEADER FOR 2 STEAM TURBINE GE FRAME 6 8MC9

● Steam Blowing (continuous steam blowing, Check CFR, and target) lube oil flushing for bearing,

● Lube oil flushing for lube oil system,

● Check all activity before starting the steam turbine,

● Control oil system, steam turbine controller)

● Turning gear operation and function test on TG operation,

● Protection test for steam turbine,

● Steam purity specification and bypass operation)

● Valve test and preparation for start ST,

● Steam turbine protection test,

● Send all RFI and report about any problem in ST.

● porting to the Commissioning

DURATION: FROM DEC 2015 TILL MAY2018.

RABIGH2 INDEPENDENT POWER PROJECT (R2IPP) 3*685MW COMBINED CYCLE" EPC PROJECT CLIENT: SAMSUNG C & T CORPORATION

LOCATION: RABIGH, KSA.

POSITION: MECHANICAL COMMISSIONING LEAD.

RESPONSIBILITY:

COMMISSIONING AND START UP TEAM LEADER FOR 3 UNITS STG (SST 5000)

● Steam Blowing (continuous steam blowing, Check CFR and target)

● lube oil flushing (adjusting throttle valve and lifting the shaft) and adjusted the sensor for bearing,

● Check all activity before start the steam turbine,

● Control oil system, steam turbine controller)

● Turning gear operation and function test on TG operation,

● Protection test for steam turbine,

● Steam Turbine valve test ATT

● Steam purity specification and bypass operation)

● Valve test and preparation for start ST,

● Check all electrical test and synchronization.

● Send all RFI and report about any problem in ST.

● Reporting to the Commissioning manager,

COMMISSIONING AND START UP TEAM LEADER FOR SIEMENS GAS TURBINE MODEL SGT 5000F (5E). WHICH INCLUDED:

GT Cold Commissioning

● Lube oil and control oil system flushing, restoration, on line leak test and final system pressure adjusting,

● Turbine shaft lifting adjusting,

● Adjusting Inlet Guide vane (IGV) and Variable Guide vane(VGV)and rotary position Calibrate,

● Start T/G and rotor cooling air and compressor bleed lines air blowing,

● Fuel oil system and Water injection system flushing restoration, on line leak test, bucket

● Test,barrel test and final CV test,

● Fuel gas system air blowing,restoration,on line leak test and final CV test,

● Pre commissioning start up testing Multi function fuel system,

● Follow up GT commissioning book sign off,

● Commissioning for Purge Air system

● Commissioning for Instrument air system.

● Check all test before first fire,

● GT turning gear.

● GT Hot Commissioning

● GT First fire up to FSNL,

● GT pre Synchronization test and synchronization

● GT balancing support,

● Support seam blowing,

● Support seam admission,

● Follow up the electrical test after first fire,

● GT performance test and reliability test,

● Ensures that all safety and precautionary requirements and procedures are followed during the commissioning process in line with the commissioning schedule.

● Reporting to the Commissioning manager

● Commissioning for fuel gas system, Fuel gas system have 7 gas compressors, 5 gas reduction stations, 4 water bath heaters.

● Commissioning for Fuel oil system Arabian supper light ASL system,

● Commissioning for N2 generation unit (2unit)

DURATION: FROM MAY 2015 TILL NOV 2015.

ASSUIT COMBINED CYCLE POWER PLANT CCPP 1500 MW.

CLIENT: GE INTERNATIONAL INC LOCATION: ASSUIT.

POSITION: MECHANICAL COMMISSIONING LEAD.

ASUIT POWER PROJECT 8*125 M "SIMPLE CYCLE"

Work Description:

Commissioning Engineer for GE Gas Turbine Frame 9E which included:

● Lubrication oil and control oil Flushing.

● Fuel Gas pipeline air blowing.

● Fuel oil flushing.

● Water injection flushing.

● GT Pre commissioning, commissioning and start up Lead,coordinate Start up and Operation activities.

● Ensures that all safety and precautionary requirements and procedures are followed during the commissioning process in line with the commissioning schedule.

● Reporting to the Commissioning manager.

DURATION: FROM SEPTEMBER 2013 TILL APRIL 2015.

QURAYYAH INDEPENDENT POWER PROJECT (QIPP) CCPP 4000 MW. CLIENT : SAMSUNG C&T CORPORATION.

LOCATION: QURAYYAH, KSA.

POSITION: MECHANICAL COMMISSIONING ENGINEER

RESPONSIBILITY:

● Steam Blowing (continuous steam blowing, Check CFR and target)

● lube oil flushing (adjusting throttle valve and lifting the shaft) and adjusted the sensor for bearing,

● Check all activity before start the steam turbine,

● Control oil system, steam turbine controller)

● Turning gear operation and function test on TG operation,

● Protection test for steam turbine,

● Steam Turbine valve test ATT

● Steam purity specification and bypass operation)

● Valve test and preparation for start ST,

● Check all electrical test and synchronization.

● Send all RFI and report about any problem in ST.

● Reporting to the Commissioning manager,

● Start up and support for Phase C testing and on to the 30-day Reliability Run. for steam Turbine

● pre commissioning/ commissioning for fuel gas system Fuel gas system has (13 gas compressors, 8 gas reduction stations, 7 water bath heaters Fuel oil system commissioning for fuel oil system, Commissioning for N2 generation unit (4unit) DURATION: FROM SEPTEMBER 2010 TILL AUGUST 2013.

ELTEBBIN THERMAL POWER PLANT (2X350MW) (EGYPT)

CLIENT: INITEC ENERGIA

POSITION: COMMISSIONING & START UP ENGINEER.

RESPONSIBILITY:

● Receiving the systems from QC (Quality Control) & Construction.

● Scheduling the procedure of the different systems.

● Preparation and execution of the pre commissioning and commissioning tasks.

● Supervision of the planning works in advance.

● Motor heat runs, system flushing, blow out, chemical cleaning and restoration works.

● Starting of the systems with data sheet references.

● Commissioning and start up engineer for plant BOP consisting of Circulating water pump, Service water pump.

● Condensate extraction pump, closed cooling pump, Boiler feed pump and Compressed air system.

● Commissioning for H2 generation plant

● Handover of the systems with the integrated rules.

● Work in partnership with English speaking workers DURATION: FROM OCTOBER. 2004 TILL SEPTEMBER 2010.

ASSIUT THERMAL POWER PLANT (2X312MW).

CLIENT: UPPER EGYPT ELECTRICITY PRODUCTION CO.( EGYPT) POSITION: SHIFT CHARGE ENGINEER

RESPONSIBILITY:

● Responsible for the start up, shutdown, and units’ normal operation.

● Operation of 312MW steam turbines (Toshiba and Ansaldo) and its auxiliaries.

● Operation for two boilers (Mitsubishi and Ansaldo 1025 t/h), forced and natural circulation and its auxiliaries.

● Operation for H2 generation plants unit which supply H2 for generators.

● Good knowledge of safety procedures for operation and maintenance of Thermal Powe Plant.

● Operation of 50 t/h auxiliary boiler and Diesel generator 2x1.2MW.

● Follow up the auxiliary system (firefighting system, service cooling).

● Good dealing for industrial safety requirements.

● Issue the maintenance requests and follow up the executing work permits with Maintenance Team.

● Co operation maintenance staff during overall maintenance periods with Mitsubishi Heavy Industries Company & Ansaldo Energia Company.

Training:

● Training in Asyut oil Refining Company (ASORC),

● Course of Primavera Asyut University,

● Training for Rules of safety and health in Asyut power plant, Languages and Skills:

Arabic : Excellent English: Very Good .

Computer skill: Windows MS Office (Word, Excel)

References:-

Name Job Title Company E-Mail Telephone

Magdy Hussein Mechanical

commissioning lead.

Shanahan Engineering

Ltd.

ad0s1v@r.postjobfree.com

009*********** KSA

002***********.

Simon Lueke Mechanical

commissioning engineer

Siemens Simon.lueke@spl

engineering.com

-

Ahmed Hamed Field service lead

engineer

Siemens hamed@Siemens .com -

Tian Zhuang Field service lead

engineer.

SIEMENS. tian.zhuang@siemens

energy.com

+1-510-***-****

Nicol Roy commissioning manager Siemens nroy11@gmail .com - Anthony Richoux Field Service Lead

Engineer

GE Inc. ad0s1v@r.postjobfree.com +336********

Goma Ali Shehata Commissioning Manager. GE Inc. ad0s1v@r.postjobfree.com 002***********



Contact this candidate