James C. Kern
Machesney Park, IL. 61115
Phone # 815-***-****
E-mail: ********@*****.***
Objective: To obtain/grow in a position with a company in which my Construction, Management Skills and Safety mind set will be of value.
Work Experience:
3/13-Present DELTA CONSTRUCTORS
Grassy Butte, ND.
Instrument Tech
Construction of new well sites. Construction of treater facilities gas and oil
measurement flow meters for sales gas and flare gas. Install instruments to monitor blanket gas on tank farms. Install Low-pressure flare systems pilot gas and igniter
mechanism.
2/12 – 3/13 CH2MHILL
Prudhoe Bay, AK.
Instrument Tech/Fitter
Maintained control systems as well as building new. Maintained Hydraulic safety
Systems and chemical injection systems on wells. Calibration of transmitters,
switches, other instruments. Work done according to P&ID packages or client
engineered specifications. Work documented/ progress reports while following
Safety rules and procedures.
4/11 – 2/12 UOSS
Kuparuk, AK.
Instrument Tech/Fitter
New construction of well tie-ins, instrument installs with Stainless Steel tubing layout and installations according to P & ID’s. Pressure test all new tubing installations including high-pressure tests with QC present and proper documentation. All work done according to company and/or client procedures. A total package review including scope of work, review maintenance procedures and a safety review prior to any work starting. Strong background using Swagelok fittings and various connectors including NPT pipe fittings. Written and verbal documentation of daily work progress. Knowledge of ISA standards.
4/09 – 4/11 CH2MHILL
Prudhoe Bay, AK.
Instrumentation Fitter
Duties include Construction and maintenance of process control systems per P&ID’s. All
Tasks are executed according to procedures rolled out by Management or client. Work
Closely with Engineering as well as pressure testing all new installations with QC, and
QA to witness testing. Document all work daily in CMMS Web Interface as well as our
Crew log. Jobs start only after a clear understanding of scope of work by all crew
Members.
11/06 – 4/09 Veco/CH2MHILL
Prudhoe Bay, AK.
Field Pipe Crew
Pipe maintenance crew in GPB. Prepared worksites for welding sleeves, adding new
Flanges for new pipe replacements. Attended meetings with operations for planning work
And reviewing procedures.
10/03 – 11/06 Stonecrafters
Rockford, IL.
Foreman over Fabrication and Installation
4/01 – 10/03 R.D. Roman
Rockford, IL.
Foreman over Fabrication and Installation
2/98 – 4/01 Benson Stone Co.
Rockford, IL
Shop and Field Supervisor
High school diploma 1986