SYED IFTIKHAR
HUSAIN
Waste Management Specialist
PROFILE
An environmental engineer and
waste manager having 11 years of experience
in integrated solid waste management i.e.,
field operations, fleet management, landfill
operations, monitoring & evaluation and
effective resource utilization and optimization.
I am eager to work in highly skillful
and dynamic environment, also to learn &
enhance my interpersonal and professional
skills alongside achieving the organizational
goals
PERSONAL
INFORMATION
PHONE:
ADDRESS:
Al- Wajh, Tabuk - KSA
EMAIL:
***********@*****.***
IQAMA:
Transferable
NATIONALITY:
Pakistani
EDUCATION
University of Management & Technology (UMT), Lahore Pakistan 2018 - 2021
Master of Science (MS)- Project Management
National University of Sciences & Technology (NUST), Islamabad 2008 - 2012
Bachelor of Engineering- Environmental Engineering WORK EXPERIENCE
Al-Khonani International
Company (KIC)
Client: Red Sea Global
Project: Secondary Infra Triple
Bay Marina Village, Amaala
Environmental Manager
Aug 2023– Present
Prepared, reviewed, and updated the CESMP;
Prepares monthly environmental reports to AMAALA(RSG).
Ensures any changes to the CESMP are made known to all staff and subcontractors.
Prepares and distributes daily reports and order acknowledgments to appropriate personnel.
Coordinates logistics for transportation of hazardous waste, universal waste and nonhazardous waste from client site including profiling, scheduling, manifesting.
Ensure proper waste profiling segregation followed by proper treatment & disposal.
Ensures compliance with client and government regulations by performing necessary inspections and reporting.
Coordinates with client and vendor financial obligations including invoicing, reporting and contracts.
Promotes culture of safety by ensuring site personnel are properly trained to perform assigned duties and comply with safety, environmental, federal, state & local regulations.
Continues to Be the point of contact between client and subcontractors for discussing changes to scope of works, project boundaries and other environmental issues
WORK EXPERIENCE
Lahore Waste Management Company, LWMC
Manager - Operations
Jun 2014– July 2023
Contributed to the establishment and development of a modernized integrated solid waste management system in Lahore city.
Ensured on the solid waste management system to ensure efficient collection, transport, resource recovery, disposal, and treatment of residential, commercial, industrial, and hospital waste.
Provided guidance to international contractors (ALBAYRAK and OZPAK) in developing operational plans and their implementation.
Monitored international contractors in adherence to contract SOPs, including Android-based attendance of field staff, primary, secondary & tertiary collection, establishment and operations at waste transfer stations (WTS), weighbridge and landfill operations, mechanical sweeping and washing of major roads, fleet management, and maintenance of workshops.
Strict monitoring of international contractors in the light of SOPs of contract, that Includes but not limited to: o Android based attendance of field staff.
o Primary, Secondary & Tertiary Collection, transportation and disposal o Establishment and Operations at Waste transfer Stations (WTS) o Weighbridge and Landfill Operations
o Fleet Management
o Maintenance and management of workshops
o Resource Planning and Optimization
o Monitoring of filed activities via state of the art videowall.
Ensured personal protective equipment (PPE) and other safety gears provision.
Coordinated site inspections to facilitate groundwater and soil sampling at Landfill Site.
Gathered and analyzed and distilled data from environmental monitoring and third-party reports.
Drafted and presented recommendations on containment, remediation and waste disposal to address environmental issues.
Managed development, design and execution of energy conservation projects.
Assisted management with permit requests and supporting documentation.
Planned and lead multiple projects including the Islamabad integrated solid waste management project, Faisalabad region solid waste management plan, and Waste Characterization Study in Lahore.
Collaborated with cross-functional teams and stakeholders to develop sustainable waste management strategies and ensure compliance with environmental regulations and environmental management plan.
Provided technical expertise in project planning, implementation, and monitoring to drive successful outcomes.
Conducted data analysis and utilized project management tools to track progress and mitigate risks.
Developed tools and guidance materials to support sustainability initiatives and enhance operational efficiency.
Served as technical consultant on environmental policies and legislative initiatives.
Managed development, design and execution of 3R in projects. Albayrak Waste Management Company
Assistant Manager
Sep 2012–Dec 2013
Conducted field surveys to gather data to prepare environmental management plan.
Managed field operations, including the implementation and execution of plans.
Ensured manual sweeping of roads and streets, door-to-door waste collection, container-based waste collection, transportation, and disposal at the landfill site.
Performed environmental site assessments and reported on remediation recommendations.
Assisted management with permit requests and supporting documentation.
Allocated, distributed, and recorded resources, such as brooms, hand carts, and bins.
Managed and supervised day-to-day tasks of construction and remediation schemes.
Managed and engaged clients at field/site and briefed on site operations at field visits. SKILLS
Project Planning and Execution
Sustainability Strategies
Resource Optimization
Environmental Compliance
Sub-contractor management
Quantitative risk assessments and mitigation
Hazardous waste remediation
Technical Proficiency (MS Office, Primavera P-6, GIS, AutoCAD)
Strong Communication and Leadership
Sensitive stakeholder management
Circular Economy
CREDENTIALS
Expertise in integrated solid waste management and field operations.
Route design for secondary and tertiary waste collection, transportation and disposal.
Establishment, management and maintenance of waste transfer stations.
Monitoring and Evaluation of waste transportation and other cleanliness operations via VTCS & VTMS.
Waste characterization and generation projection in accordance with population density.
Resources Optimization and utilization i.e., HR & Fleet Management.
Project Planning, execution, monitoring, inter and intra communication, stake holder management, contingency planning and project handling.
ACCOMPLISHMENTS
Contributed to the installation and successful operation of Bio Gas Plants in Lahore.
Participated in establishing the Lahore Waste Management Company (LWMC) Compost Plant.
Participated in the upgradation of parking yards into state-of-the-art workshops for improved waste collection structure.
Involved in waste generation projection in Lahore City based on population density.
Contributed to the rehabilitation and reclamation of expired Dumpsite at Mehmood Booti.
Designed routes and mechanism for hazardous hospital waste collection for different hospitals in Lahore.
Participated in the installation, functioning, and monitoring of incinerators in Lahore Children's Hospital.
Developed mechanisms to contain fuel pilferage and optimize fuel consumption for garbage collecting vehicles.
Conducted waste characterization studies in Lahore, Gujranwala, Faisalabad, Rawalpindi, Quetta, Multan, Bahawalpur, and Sialkot.
Planned and executed the lifting of abandoned construction and demolition materials across Lahore, saving almost 5 million PKR for the company by utilizing this C&D waste at the landfill site.
Contributed to the establishment of three major waste transfer stations for Lahore City with a capacity of storing 2000 tons of waste each temporarily before final disposal at the landfill site. CERTIFICATIONS
Conflict Management Training
Stress Management Training
LANGUAGES
English (Fluent)
Urdu (Fluent)
Punjabi (Fluent)
CHARACTER REFERENCES
References can be provided on demand.