MOSTAFA
DARWESH
EL Nasr Road-Maadi- Cairo, Egypt
**********@*******.***
Education
1983
Bachelor Degree of Civil Engineer of grade Very good/Ain Shams University
Experience
First: inside the Kingdom of Saudi Arabia
2019-2021 at AL Rashed Construction Company
• At the project of: water transmission system al Jubail/El sharqia cities.
Client: Saline Water Conversion Corporation (SWCC).
Consultant: FISHNER Consulting Engineers.
Project value: 1,187,000,000 SR
• My Position: Project Manager
The project consists of: Design and Construction of steel pipeline for water transmission, dia. 100", total length 130 km, including: pump stations, electrics buildings, VSD buildings, generators building, valve shafts, storage steel water reservoir capacity of each tank (1700,00 cubic meter ).
2015-2019 at AL Rashed Construction Company
• At the project of: water transmission system al Jubail/Riyadh (phase 3).
Client: Saline Water Conversion Corporation (SWCC).
Consultant: JACPS Consulting Engineers.
Project value: 1,650,000,000 SR
• My Position: Project Manager
The project consists of: Design and Construction of steel pipeline for water transmission, dia. 88" / two lines, total length 800 km, including: pump stations valve shafts.
2010-2015 at AL Rashed Construction Company
• At the project of: Ras Al Khair-Riyadh Water Transmission System, Riyadh
Client: Saline Water Conversion Corporation (SWCC)
Consultant: ILF Consulting Engineers. Project value: 950,000,000 SR
• My Position: Project Manager
The project consists of: Design and Construction of steel pipeline for water transmission, dia. 72", total length 1,055 km, including valve shafts (inside Riyadh City).
2007-2010 at AL Rashed Construction Company
• At the project of: Arar Water Treatment Plant and Pumping Station and Transmission Lines.
Client: Ministry of Water and Electricity.
Consultant: Asas Al Imrany Office.
• My Position: Project Manager - The project consists of: Water treatment plant of 2500 m / day capacity of reverse osmosis
system - Pumping station, power generation station, administration buildings, and warehouses. - Pipe lines of wells water collection, transmission lines to the city (pipes type, flexible steel -
ductile)
2007-2004 at AL Rashed Construction Company
• At the project of: Water Transmission from strategic reservoirs to Riyadh stations.
Client: Ministry of Water and Electricity.
Consultant: Al Bawardi Office for Engineering Consultation.
• My Position: Project Manager - The project consists of: design and construct transmission pipelines of 1200mm diameter (ccp) - Design and construct Cathode protection for the pipes. Construct valves rooms along with supply and install the valves
2004-2002 at AL Rashed Construction Company
At the project of: Institute of Public Administration in Riyadh.
Client: Ministry of Education.
Consultant: Zuhayer Fayez Office for Engineering Consultation.
• My Position: Construction Manager - The project consists of: Three main buildings: Printing building (two floors) each floor of
4000m Conference buildings (two floors) each floor of 3500m.
2002-1999 at AL Rashed Construction Company
• At the project of: Insurance villas at Diplomatic Quarter at Riyadh.
Client: General Organization for Social Insurance.
Consultant: Dar Al Riyadh.
• My Position: Section Head (the project consists of 4 sections).
The project consists of: The section that I construct consists of (33 villas). - Each villa consists of two floors of various areas, in addition to external work and fences.
- Teaching lounges building (three floors) each floor 7000m.
1999-1997 at AL Rashed Construction Company
• At the project of: Prince Sultan Hospitality Center at Sharma (a city close to Tabuk).
Client: Ministry of Air Defense.
Consultant: Ministry of Air Defense.
• My Position: Construction Manager. The project consists of: Guest Palace - Diwania -- (36) Villas, Mosque, Administration, building, roads and fences.
1993-1997 at AL Rashed Construction Company
• At the project of: Al Kanary Residential Complex.
Client: Al Rashed Construction Company.
Consultant: Al Rashed Construction Company.
• My Position: Construction Engineer. • The project consists of: 277 Villas of various areas - mosque - recreation center - roads and fencing.
1991-1993 at Hajar Construction Company
At the project of: Al Othaim Commercial Complex at Suly in Riyadh.
Second: Inside Egypt
1990-1991 at Tanmiah Imrania Construction Company
• At project of: Al Hijaz Residential Tower – Heliopolis.
Client: Tanmiah Imrania Real Estate Company.
Consultant: Amro Salama Office for Engineering Consultation.
• My Position: Project Manager
The project consists of: - 9 repeated floors, each floor of 600m2 area. - Warehouses (Hangers) of 20000 m2 areas. - Two floors administration offices - Basement and ground floor (exhibition and garages).
1989-1999 at Tanmiah Imrania Construction Company
• At project of: Al Hiaya Residential Tower - Al Haram.
Client: Tanmiah Imrania Real Estate Company.
Consultant: Amro Salama Office for Engineering Consultation.
• My Position: Project Manager
The project consists of: - 12 repeated floors, each floor of 1300m' area. - Three floors Administration Offices. - Basement and ground floor (exhibition and garages).
1987-1989 at Tanmiah Imrania Construction Company
• At project of: Suzuki Egypt Factory - 6 October City.
Client: Tanmiah Imrania Real Estate Company.
Consultant: Amro Salama Office for Engineering Consultation.
• My Position: Construction Engineer. The project consists of:
- Building of assembling carinas. - Spraying lines (paint building) - Roads and fencing of cars warehouses.
1983-1987 at Tanmiah Imrania Construction Company
• At project of: Al Mariotyah Residential Complex - Al Haram.
Client: Tanmiah Imrania Real Estate Company.
Consultant: Amro Salama Office for Engineering Consultation.
My Position: Construction Engineer.
The project consists of: - 6 Residential towers of 1200 m' area each. - Each Tower consists of 15 floors. - I construct two complete towers.
Skills
Projects management
Microsoft office
Team leader
Excellent time management skills
Conflict Management
Analytics skills
Problem solving
Work under pressure
Multi-tasking
Languages:
Arabic
English