Post Job Free
Sign in

Mechanical Engineer Assistant Manager

Location:
Pakistan
Posted:
October 20, 2023

Contact this candidate

Resume:

ZOHAIB AZHAR

Mechanical Engineer

033*-******* *************@*****.***

House no. C-69 Sector 11-B North Karachi, Karachi Pakistan. SUMMARY

With Experience of 8+ years I would like to be a part of an organization where I can fully utilize my skills and make a significant contribution to the success of the employer and at the same time ensuring my individual growth

EDUCATION

B.E (Mechanical) 2015

NED University of Engineering and Technology Karachi ACHIEVEMENTS

Cost Reduction

· Manage to achieved cost reduction KAIZEN in paint shop

* Reduced consumption of (Undercoat deck) cost saved 32% month of MAY-2021.

* To achieved best KAiZEN award in the month of AUG-2021. Reduced cost (Paint polishing pad) cost saved 71%.

* The paint spray booth filter has been changed from 700 units instead of 600 units reduced cost & saved 14% month of SEP-2021.

* Reduced consumption of (Stoving white paint inner side of door) cost saved 25% month of OCT-2021.

*(Re-cycle/re-use cotton gloves) consumption cost saved 04% month of March-2023. Completed a Demanding Project on time and under-budget:

* Finalized tools & Equipment lists

* Completed Pilot Production Target.

* Completed the trial production of CHANGAN Karvan Van, New Pick-up M8,M9, ALSVIN.

EXPERIENCE

Assistant Manager 08/2016 - Present

Master Motor Corporation Private Limited.

Manage production operations and ensuring safety, integrity, legality, and quality standards were met. Planned and organized staff to achieve successful and efficient completion of production plan. Assisted in project work to improve processes and increase productivity. Managed employee performance, disciplinary control, and personal reviews to drive team performance.

Led a continuous improvement initiative that saved the company Rs. 1.3 Million annually through waste reduction in paint production.

Implemented Lean Manufacturing and 5S methods to improve efficiency and maintain work place standards.

Identified an resolved paint production bottlenecks. Developed and implemented training programs to enhance employee & team member skills and knowledge,resulting in a 10% improvement in production performance. Implemented daily controlled reports and resolved issues to minimize downtime and improve productivity.

Managed running of spray booth, maintaining clean work environment an ensuring optimal equipment performance.

Maintained up-to-date knowledge of latest paint technologies. Collaborated with colleagues to complete complex paint jobs, sharing expertise and achieving efficient results.

LANGUAGES

English Urdu

STRENGTHS

Analytical Thinking

Strong analytical skills to identify and

resolve production bottlenecks,

optimizing processes and improving

overall efficiency.

Leadership

Proven ability to lead teams and

achieve production targets, resulting in

increased productivity and cost

savings.

Effective Communication

Excellent communication skills to

collaborate with cross-functional

teams, ensuring smooth production

operations and successful project

implementation.

Technical Expertise

Possess significant experience as a

vehicle Paint Engineer with extensive

knowledge of automotive repair

process and procedure.

PROJECT

Master Changan Motor Limited

CHANGAN AUTO

Managing the day-to-day operational

aspects of a project.

Sound Knowledge of installatalled

testing, commissioning & maintenance of

Pumps& Motors, Vaporizers, Gas Tanks,

Gas / smoke detectors, electrical

equipment’s & firefighting equipments.

Gas plant (LPG/ SNG) installation

maintenance, commissioning & testing

of compressor, generator & operations.

Installation, Commission & Operations of

SNG Plant (36 MMBtu Made by KGE)

LPG decanting from the bowser to LPG

storage tank with proper safety

Installation and Commissioning Of Paint

Shop and Assembly Shop

machineries(Conveyors, Hangers,

Ovens).

Installation, maintenance and daily

operations of Chiller, Hot water Boiler,

Cooling Tower & Paint shop burners.

Problem and fault repair on shop floor

line side / break down maintenance.

Having good knowledge in electrical

control components like Contractors,

Limit switch, Breakers, Relays, Sensor.

SKILLS

Time Management Problem Solving

Technical Expertise Root Cause Analysis

Production Planning Project Management

Vehicle Masking Vehicle Paint Application

Spray Booth Operation Colour Matching .

Powered by www.enhancv.com

E

e

f

f

G

s

+



Contact this candidate