Post Job Free

Resume

Sign in

Electrical Engineer Senior

Location:
Egypt
Posted:
October 16, 2023

Contact this candidate

Resume:

Ahmed Abdelhakim Sabbah

Senior Electrical Maintenance Engineer

Address: Menia Elkameh, Sharkia, Egypt.

Mobile: +2-012********, +2-010********

E-mail: ad0edu@r.postjobfree.com

Nationality: Egyptian.

Date of Birth: 01/09/1986

Marital Status: Married

Military Status: Exempted

Objective

Seeking a senior electrical engineer position at oil and gas field to utilize my 15 years of experience in oil & gas field, power plants and tunnel metro projects, experienced in:

- Maintenance, troubleshooting, installation, testing and commissioning of electrical equipment as high voltage circuit breakers, medium voltage switchgear, low voltage panels, MCC, transformers, motors, VSD, PLC, softstarter and UPS.

- Inspection of electric explosion proof equipment, Certified CompEX (EX 01: EX 04).

- projects execution with different clients as SEC/NG, SWCC, Marafiq, SABIC, Aramco, Egyptian Electricity Holding Company(EEHC) and National Authority for Tunnels(NAT). Education

Bachelor’s degree of Engineering: Electric power and machine department, (Sep, 2003-May, 2008). Faculty of engineering, Zagazig University.

Cumulative Grade: Good.

Work Experience

General Petroleum Company (GPC), Egypt.

Role: 1- Senior Electrical Maintenance Engineer. 01st May, 2019 – Till now 2- Electrical Maintenance engineer. 29th

Jan, 2014 to 25th March, 2015

Responsibilities and duties:

Inspection of electrical explosion proof equipment (Certified CompEX (EX 01: EX 04)).

Maintenance, operation and troubleshooting for M.V switchgear (6.6 KV & 11KV), transformers, motor control center (MCC), low voltage switchboards, protection relays (Sepam & Ref), VSD, softstarter, UPS and batteries.

Maintenance, operation and troubleshooting for Ruston gas turbines(TB5000) 3*3 MW, 6.6 KV.

Maintenance, operation and troubleshooting of diesel generators.

Supervision of maintenance procedures for the computerized maintenance management systems (CMMS), based on maintenance program (MAXIMO) to perform preventive maintenance for all of the electrical system.

Preparing technical specifications of M.V SWG, L.V SWG, MCC, UPS, VSD, Softstarter, motors, transformers, shelters, M.V & L.V cables and make technical study to select the suitable for hazard area (Ex) according to international standards codes.

Reviewing the technical offers of materials and ensure its compliance with material purchase requisition.

Following up of materials manufacturing and attend FAT.

Supervise contractors, workers, technicians, engineers at site.

Execution of new projects at site as upgrade of MV switchgear, low voltage panels, MCC, protection relays and UPS.

2

Al Fanar Company, Saudi Arabia.

Role: - Senior Project Engineer 29th March, 2015 to 30th April, 2019 Responsibilities and duties:

Execution of projects with different clients as SEC, SWCC, Marafiq, SABIC and Aramco) as below:

Replacement of existing BOCBs by DTCBs and replacement of their old OHTL at 4 S/S, (SEC/NG).

Maintenance of Switchgears, exciter panels, 15 MW,13.8KV Motor (Yanpet - Yanbu).

Installation, testing and commissioning of DSM at Waad Al Shamal area projects (7) no. S/S 380KV and 132 KV, (SEC/NG).

Replacement of generator circuit breaker for six gas turbines at PP7, (SEC/NG).

Emergency installation of 750 MVA Transformer and install its OHTL at Hawiyah S/S, (SEC/NG).

Installation of Partial discharge for MV motors at ARAMCO.

Installation of LV Switchgear, MCC, Protection panels, 13.8KV switchgear, Battery charger, battery racks, dry type transformers and lighting panels at S/S 46 ARAMCO DHAHRAN.

Reviewing the Scope of work, terms and conditions received along with the project/PO.

Conducting Site visit for kick off meeting with client to have a complete clarity on the job.

Reviewing issued drawing and technical submittal and ensure its compliance with project specifications.

Submission of drawing submittal to customer and close follow-up for the approval.

Engagement with planning department to define project activities within the scope of work and preparing complete project schedule for entire project.

Engagement with procurement departments for defining the materials required to execute the project and provide the technical support to select the proper materials.

Placing order for various materials and coordination for assembly using SAP system.

Providing technical support to the field team during the execution.

Monitoring project progress to ensure schedule and budget target are met.

Carrying out site visits and meeting the concerned parties to ensure that technical requirements are followed.

Monitoring of Subcontractors performance.

Preparing offers and complete tender documents for different tenders at (SEC, SWCC, Marafiq, SABIC and Aramco).

Colas Rail Company, Cairo metro tunnel project line (3), Egypt. Roles:

1-Sr. Testing and commissioning engineer (full time). 19th Oct, 2010 to 22nd Jan, 2014 2-Sr. Testing and commissioning engineer (Part time). 23rd Jan, 2014 to 30th Sep, 2014 Responsibilities and duties:

Testing and commissioning of medium voltage switchgear (20 KV) including MVCB, CT, PT, Busbar, protection relay (Sepam) and voltage relay.

Testing and commissioning of transformers 20 /0.4KV with 250 K VA and 2.5 MVA.

Testing and commissioning of low voltage panels and its contents: (voltage relay, earth leakage relay, Meters…… Etc.).

Downloading PLC programs (Siemens S7-300) and the program of display(HMI) using Wincc Flexible, making modification for S7-300 programs and wincc flexible programs, doing general test and starting up the power station.

Very good Background about testing and commissioning of traction equipment like transformer 20kV/592V, rectifier 3.7 MW, DS’s and HSCBs (DC).

Supervision for testing and commissioning of high voltage station GIS (220 KV).

Conducting Factory Acceptance Test (FAT) successfully at France (Soreel company) and Egypt (Schneider electric company) for MV, LV and PLC panels. 3

3- Deputy maintenance manager. 21st Feb, 2012 to 22nd Jan, 2014 Responsibilities and duties:

Maintenance for electric equipment at HVS Abbasia station as low voltage boards, medium voltage switchgear, PLC, LCC, fire system, GIS and transformers.

Maintenance for electric equipment as low voltage and medium voltage panels, transformers, fires system, UPS and PLC panels at traction and lighting & power stations (RS & LPS).

Follow up the maintenance tasks and review maintenance forms to make sure it is done as per maintenance manuals and the agreement with the client.

Attend the needed meeting with client, operators and suppliers.

Alexandria for construction company (Talaat Mustafa Group), Egypt. Role: installation engineer at Al Rehab project. 01st July, 2010 to 14 th Oct, 2010

Misr Company for mechanical and electrical projects "Kahromika”, Egypt. 01st June, 2009 to 30th June, 2010

Role: Electrical installation engineer at El Tebbin Thermal Power Plant 2x350 MW under Supervision of ALSTOM and INITEC Companies.

Egyptana Company, Egypt.

Role: Maintenance engineer. 13th Sep, 2008 to 31th May, 2009 Certificates and Training Courses:

Certificate of core competence: CompEX (EX 01: EX 04), Expiry date: 2 nd

, Dec. 2026.

Dropped objects certificate/ IADC, Expiry date: 25 th

, Sep. 2024.

Permit receiver certificate (Saudi Electricity Company) from: Sep. 2016 to Sep. 2018.

LV variable speed drives for electrical motor at Schneider Company in February 2023.

Automation professional diploma level 2 at Schneider Company in December 2022.

Electrical network protection level 1 at Schneider Company in November 2022.

Best practices for health, safety & environment (HSE) and maintenance excellence in oil and gas industry at Institut teknologi petroleum PETRONAS (INSTEP), 26 th

Sep, 2022 to 30

th

Sep, 2022.

Advanced energy management at Schneider Company in February 2020.

Power system analysis at GPC/Cairo University from 18 th

Jan, 2015 to 22

nd

Jan, 2015.

Installation of Raychem heat shrinkable terminations and joints up to 18/30 KV for XLPE single core cable at south Cairo electricity distribution company training center in December 2014.

Programmable logic controller "PLC" Siemens S7-300 and S7-400 (Service level1) at Siemens Company from Jan. 27

th

, 2013 to Jan. 31

st

, 2013.

Automatic control three months (90 Hours) at Salesian institute (DonBosco), June, 2008 to Sep, 2008.

AutoCAD (2-D) program (Zagazig University) in June 2008.

Programmable logic controller "PLC" (60 hours) at High Tech. center in July & August 2007. Computer Skills

Good user of Microsoft office applications.

Language Skills

Arabic: Native language.

English: Very Good in both written and spoken.



Contact this candidate