RESUME
Name: K.Raja Sekar
Phone:+91-995*******
Mail.id:*.*.*.*********@*****.***
Position : INSTRUMENT SUPERVISOR
Experience :12+years
CAREER OBJECTIVE
To best utilize every opportunity and implement my knowledge to contriubute to the benefit of the organization and myself..
EDUCATIONAL QUALIFICATION
B.E (Electronics and Instrumentation Engineering) from 2007 - 2010, St.Peters Engg College,ANNA UNIVERSITY, Chennai, Tamil Nadu, India.
DIPLOMA (Instrumentation & Control Engineering) from 2004 - 2007, Sri Ram Polytechnic College, DOTE, Thiruvallur, Chennai, Tamil Nadu, India.
WORK EXPERIENCE DETAILS: PROJECT AND MAINTENANCE HANDLED (Green Field & Brown Field)
IN INDIA:
1. BRIDGE & ROOF .CO(I) LIMITED
Project 1#
Position : SENIOR INSTRUMENT ENGINEER
Client. : Chennai Petroleum Corporation Limited(CPCL), Manali
Sub-Client. : Engineering India Limited (EIL)
Project. : BS-VI, Auto Fuels (FCC-GDS)
Duration : January 2020 to June 2021.
IN OVERSEAS:
1.HEAVY ENGINEERING INDUSTRIES AND SHIPBUILDING CO. K.S.C (Public)
Project 1#
Position : INSTRUMENT TECHNICIAN/FOREMAN
Client : KUWAIT OIL COMPANY (KOC)
Sub Client : Laursen & Turbo(L&T)
Project : NEW GATHERING CENTRE 30, NORTH KUWAIT
Duration : OCTOBER 2017 to MARCH 2018
Project 2#
Position : INSTRUMENT SUPERVISOR/PTW
Client : KUWAIT NATIONAL PETRO CHEMICAL (KNPC)
Sub Client : Technicaus Reniudaus (TR)
Project : GAS TRAIN-5(GT-5), Fahaeel, Kuwait.
Duration : March2018 to. October 2019
2. FAWAZ TRADING & ENGINEERING WLL.CO
Position : INSTRUMENT SUPERVISOR.
Client : KUWAIT INTEGRATED PETROLEUM INDUSTRIES COMPANY (KIPIC).
Sub Client : Technicals Reniudaus (TR).
Project : ALZOUR REFINERY(Maintenance).
Duration : January 2022 to Till date.
IN INDIA:
2. MANALI PETROCHEMICALS LTD(MPL), CHENNAI, TAMIL NADU
1)POSITION
SERVICE TRAINEE : JUNE 2010 - APRIL 2011.
DURATION : 11 months.
2)POSITION
EXECUTIVE : APRIL 2011 - JUNE 2012
DURATION : 15 months.
3)POSITION
JUNIOR ENGINEER : AUGUST 2012 TO MAY 2017.
DURATION : 4yrs 9moths.
Total Experience : 12+ years
DUTIES & RESPONSIBILITIES
●Having knowledge in Compressor startup activities like trouble shooting.
●Having knowledge in CDU(Crude Distillation Unit) and SGU(Saturation Gas Unit).
●Installation, calibration, Loop checks, commissioning, Maintenance and troubleshooting of Instrumentation.
● Study and interprets the engineering documents to subordinates such as P&ID, Loop wiring diagrams, Hook up drawings, layout diagram, Instrument specification sheets,as known in SPI.
● Installation & Maintenance of Transmitters (Pressure/ Flow/ Level/ Temp/ Differential
Pressure),
● Working as per Site in charge instructions as a final decision
● Having knowledge in AVEVA installation and programming as per site conditions and
exciting the plant.
● Having enough experience in vendor packages like Compressor, Boilers, Heater, Metering
Skid, and Analyzers.
● Calibration and Loop Checking, Commissioning of Transmitters of different makes
(Rosemount, SIEMENS,Honeywell, Endress & Hauser, Yokogawa, Magentrol etc.) for the
measurement of Pressure, Differential Pressure, Flow, Temperature, Level.
● Having enough experience in Automation field like instrumentation, Telecom, Building
Automation System (BAS) and Electrical Power Monitoring System(EPMS) for industrial
facilities.
● Having enough experience on preparing of Floor plans, Control room layout, Wiring diagrams,
Instrument location plans, Panel GA's.
● Having knowledge of experience in checking and BOM list like Compressors, Boilers, Turbines and other spares of instruments.
●Making of QA/QC document's as per company document's preferred using SAP.
●Knowledge in maintenance of Control Valves, Solenoid valves, Valve positioners.
●Installation of Positive Displacement meters, Transducers, Switches and Tank level gauges.
●Installation and calibration of control valves (Fisher /SIEMENS /Flow serve/Hytork/Masolein/Rotork).
●Corrective, Preventive, Breakdown & Shutdown Maintenance for field Instruments.
●Installation of f&g instruments (Heat detector, smoke detector, gas detector, UVIR sensor, etc.) and MICC cable (laying, glanding, termination)
●Calibration and Loop checking of Gas detectors like (HC,H2,H2S,TOXIC)
●Having good knowledge in preparation of tray work, Cable Pulling, Glanding, JB Termination, Grounding etc.
●Having good knowledge in preparing trench layout drawing.
●Good knowledge in insulation testing (Megger)
●Making Asbuilt for impulse tubing as per IS(Instrument standard)
ADDITIONAL TRAINING:
Under went Industrial Automation Training Program in CENTRAL POLYTECHNIC COLLEGE,
Govt of TAMILNADU
●Automation testing training program is going on in Emerald Automation.
CALIBRATION AND TESTING EQUIPMENT
●HART communicator 475
●DRUCK pressure calibrator
●Pneumatic hand pump
●FLUKE Loop calibrator DPI1612
●FLUKE Thermo bath
●MEGGER Insulation tester
●TREX
ADDITIONAL SKILLS
●Good Knowledge in PLC and DCS
●Excellent in Basic computers, MS office and Internet
TRAINING ATTENDED
KUWAIT OIL COMPANY (K.S.C)
● Work at Height & Confined Space Training.
● HSE & Asset Induction
● H2S & O2 Training.
KUWAIT NATIONAL PETRO CHEMICAL (K.S.C)
●Permit to work(PTW).
●LOTO training.
●Safety Induction training.
KUWAIT INTEGRATED PETROLEUM INDUSTRIES COMPANY (KIPIC)
●Defensive driving.
●Commissioning and Pre-Commissioning activity.
PERSONAL DETAILS
Date of Birth : 25/09/1985
Age & Sex : 38Years, Male
Father’s Name. : Mr.M. KOTTI REDDY(Late)
Address : Old.No:104/91,New.No:42
Gomatha Nagar,3'rd st
Thiruvottiyur
Chennai-600 019
Marital Status : Married
Nationality : Indian
Languages Known : English, Telugu, Tamil and Hindi
PassPort No : V1301363
Date of Issue : 26/08/2021
Date of Expiry : 25/08/2031
DECLARATION
I hereby declare that all the details furnished by me are true to the best of my knowledge and belief.
DATE :
PLACE : CHENNAI (K.RAJA SEKAR)