EDWIN BONGO LASAP
Holy Family Village * Banilad, Mandaue City Cebu Philippines
Mobile number +639********* / +639********* (Philippines)
E-mail: **********@*****.*** / **********@*****.***
OBJECTIVES
To become a result of a well oriented skilled Electrical Discipline in a progressive firm that offering the opportunity for carrier advancement and extent my knowledge as an Electrical practitioner for the company’s growth.
POSITION DESIRED
Electrical Supervisor
I hereby and apply, any position that commensurate my qualifications. I want to share my experience, skills and knowledge, a good team leader, a multiplayer and be among the elite work force of your good and prestigious company.
QUALIFICATIONS
More than Ten years of experience overseas workers, in GGC Countries. Exposure on Oil and Gas refinery, Power and Desalination plant construction.
Monitoring Electrical scopes, with hands on supervisions, handles day-to-day interface with the contractor, providing a focus on safety, quality, schedule and carry out daily reporting of activities, and progress to the site.
Responsible for ensuring his subordinates are competent to carry out their allotted task and confirming and clarifying the status of electrical and Instrument works.
Organize, handle, monitor and with supervises technical field work for Electrical and Instruments construction layout and Installation of conduit pipe, cable trays, fabrication of support, lighting & power Installation, grounding Installation, Power Substations HV, MV & LV Switchgears, UPS, DCS, ESD Panel, ELV system Installation and Prior for Functional Test of Electrical Scope for Commissioning Acceptance.
Coordinate, inspect and supervising the pre–installation work of
trench cross section layout, Duct Bank layout as per project
specifications.
Preparation of wiring connection diagram between different entities in wiring module.
Handle and supervising the Grounding and Cathode protection
works as per plan and termination of power, control and Instrument cables to be testing as per team by team set up.
Computer operations – AutoCAD, Windows, Microsoft Excel and
Power point.
WORK HISTORY
June 2021-April 30 2023
Electrical Supervisor
Shinbo Co. LTD.
Police Polimery Project
Police Poland
Duties and Responsibilities
On site and hands on Supervision of the Electrical system that include my scope of work as per construction manager assigned
Conduct daily toolbox meeting, give an assignment and safety briefings of all the foreman and workers for safety precaution of the workplace, includes housekeeping before and after work.
Make one week work schedules for all the handled systems.ie Lighting
and Small Power, Fire Alarm Systems, LAN, PAGA (Paging Systems)
and Security Systems.
Responsible and supervised the termination of Small Power and Extra
Low voltage systems
Monitoring of all scope area that has manpower and check the
progress and the standard of work as base of the typical installation
details approved.
Prepare all the approved drawings and prepare the tools and materials
that need on the scheduled systems.
Collect the daily progress report and submit to the Planning
Department for the evaluation of the site progress in daily basis.
Attend Supervisors weekly meeting conducted by the site manager and
construction Managers as per Standard operation procedure of the
company, and discuss some minor and major activities that scheduled
from the department managers.
Accommodate the Vendors that handled the system, and witness the
client and the assigned inspector of the scope and the systems that
under my supervision.
Aug 2016 – May 2020
Electrical Supervisor
Big Dutchman International GmbH
Kingdom of Saudi Arabia Project
Duty and Responsibilities
Prepare, organize and check all materials and made the distributions in each location to make an easy access for convenient of work to prevent delaying of time and make a nice and smooth working system.
Hands on and supervision of installation of cages, elevators, cross conveyors and other mechanical jobs.
Hands on and supervision of Electrical installations of all distribution Viper panels, installations and connections of all sensors, motors and switches, installation and termination of AMACS System.
Motivate the scope of work as a team. Inspection the finished job to ensure good quality of work and reminding for maintain the safe in working area.
Make a daily report and submitted to the Managers for the progress evaluation.
Assist and witness the inspection team with the client and consultants for approval of the accomplished electrical works.
Prepare and organize manpower team for commissioning.
Responsible for the handover of works to the client’s maintenance and made a training of their designated manpower as per stated in the contract between the company and the client.
Jan. 2013 – Sept.2015
Electrical Supervisor
Sejong Vietnam LTD./Hyundai Engineering
Mong Doung Quang Ninh Vietnam
Duties and Responsibilities
On Site Supervisions of all electrical scope of work to ensure the work by agreed specifications, schedule and acceptable standards that carried out in time in accordance with specification and quality requirements.
Conduct Daily Tool box meeting every morning reminding for the safety precautions in the site and housekeeping before and after works, distribution of work schedules to all foreman in each assignment.
Responsible for all the revised drawings after the stamping from the document controller for site copy and distribute to the assign foreman.
Monitoring and supervise for site work status in all electrical jobs, prepare and check the materials for termination in high voltage, medium voltage, low voltage and extra low voltage such as Fire alarm, LAN, Telephone system and Public Address system.
Conduct weekly meeting to all respective team Foreman for the progress of the site and priority schedule for the week and reminding for maintain the safe in working area for their subordinates.
Motivate the scope of work as a team. Inspection the finished job to ensure good quality of work assembly, and coordinate the QC for the scheduled inspection by the consultants or inspectors.
Make on time daily accomplishment report and attend the personnel meetings.
Joined and witness the handover all the package system to the client.
June 2011 – October 2012
Electrical Supervisor
Sejong Saudi Arabia LLC / Doosan Construction
Rabigh, Kingdom of Saudi Arabia
Duty and Responsibilities
Perform directions ordered by construction manager as per work
schedules, site progress, materials status and target schedules.
Conduct Daily Tool Box Meeting to all manpower, had some briefings
regarding safety in working areas, housekeeping and distributions of
work schedules in each team.
Monitoring the scope and manpower assignments, check the daily
progress and materials that needs.
Supervise Electrical equipment installation and termination in site with
those corresponding areas and locations as per electrical drawings
packages i.e. single line diagrams.
Coordinates with other departments, Civil and Mechanical scope to
prevent some conflicts and obstructions.
Motivate the scope of work as a team and inspection the finished job to
ensure good quality of work assembly.
Update, all revises conceptual design drawings to “As-Built”
status: electrical installations for design change on Project Design and
installation of electrical requirements for as per site condition.
Plans jobs with appropriate level of detail for the given skilled trades
workforce. Determine and arranges for parts required to perform
Collect all the Daily Report of each foreman and evaluate the
daily progress and submit to the assign personnel.
July 2010 – June 2011
Electrical Supervisor
Sejong Saudi Arabia /Hanwha Engineering
Yanbu, Kingdom of Saudi Arabia Project
Duties and Responsibilities
Supervised all electrical works in site i.e. termination of High Voltage,
Medium Voltage, Low Voltage and Extra Low Voltage (ELV) and
underground Electrical works such as embedded conduit, duct banks,
and grounding works and in above the ground, grounding of local
control panel, electric motors and equipment panel.
Preparation of electrical drawings packages, single line diagrams, schematic, power/grounding, lighting layout and all of handled scope.
Performs routine duties as assigned by Electrical Manager, Site Manager and Field Management.
Responsible for speeding-up progress. Participates in field walk downs for electrical field department with Client and other department personnel.
Check and monitor the assign scope to make and accomplish before the target date. Print and delivers work orders to the foreman in conjunction with the weekly work schedule, upon completion of jobs, communicates with skilled trades regarding ideas and procedures that would make future jobs more efficient.
Coordinates in Planning Department for the updated revise drawing to prepare and check the materials for the scheduling of manpower to take the activity.
Requesting the QC Department to conduct pre- inspection of the finish work before making the RFI (Request for Inspection) that will be conducted by the client inspectors and consultants.
July 2009 – June 2010
Electrical Foreman
Sejong Corporation / Hanwha Engineering
Jubail, Kingdom of Saudi Arabia Project
Duties and Responsibilities
Give instructions all Lead man workers in their respective job
assignment, Maintain a safe working area for their safety. Check and
make a final review of the finished job to ensure good quality of work
base on standard.
Responsible of the working materials that already endorsed the
supervisor for the assign area to be installed.
Prepare all tools and materials and make a group of manpower to do the
job assign by the supervisor specially the urgent schedules.
Always monitor and check the working area and the workers assign in
designated work.
Hands on and demonstrate how to execute the work to the assign
workers to prevent the materials and time wasted.
Follow-up the incomplete electrical materials or equipment required for
installation including fabrication, drawings for raceways, wire ways,
exposed and embedded conduits layouts.
Make and submit the daily progress report to the supervisor, and report
the status of the handled area of responsibility.
EDUCATIONAL ATTAINMENT
College: Bachelor of Science in Electrical Engineering
Institution: University of the Visayas Cebu City Philippines
Short Course: Auto CAD 2D / 3D
Institution: Micro Bagz Computer School
Secondary: Batch 1989-1990 Graduate
Institution: University of the Visayas Cebu City, Philippines
Elementary: Batch 1981-1982 Graduate
Institution: Banilad Elementary School Cebu City Philippines
PERSONAL DATA
Age: 53 years old.
Birth Date: November 15, 1969
Civil Status: Married
Sex: Male
Religion: Catholic
Citizenship: Filipino
Weight: 170lbs
Height: 5’8”
I hereby certify that the above information is true and correct to the best of my knowledge.
Edwin B. Lasap