Rod Mamianskum
Wemindji, QC, CA
Cell: 819-***-**** Email: ********@*****.***
Exceptional professional with proven credentials leading and delivering complex projects. Outstanding leader with commendable abilities to cultivate healthy relationships between contractors and clients. Core Competencies
• Surveying • Cost Estimation • Contract management
• Project Planning • Waste Management • Training and Development
• Health and Safety Regulations • Cost Management • Reporting Professional Experience
Tawich Construction Incorporated
July 2022 to November 2022 Seasonal
May 23, 2023 to Present
Wemindji, QC
• Interface with, civil engineers, inspectors and project managers to develop detailed design documentation
• Examine land boundaries and property lines by researching previous land records, legal descriptions, survey records, land titles, and other documentation
• Survey the site to gather information and precise measurements on geographic, hydrographic, and topographic features
• Utilize surveying instruments such as builder’s levels and GPS (global positioning systems) to measure distances accurately
• Perform layout work, check as-built conditions, and stake out clearing boundaries and reference points on site
• Used Leica GPS and Total Station with Captivate
Thomas Cavanaugh Construction April 2022 to July 2022 OTTAWA, ON
• Interface with cartographers, civil engineers, and project managers to develop detailed design documentation
• Examine land boundaries and property lines by researching previous land records, legal descriptions, survey records, land titles, and other documentation
• Survey the site to gather information and precise measurements on geographic, hydrographic, and topographic features
• Utilize surveying instruments such as builder’s levels and GPS (global positioning systems) to measure distances accurately
• Perform layout work, check as-built conditions, and stake out clearing boundaries and reference points on site
• Utilized Trimble GPS & Total Station
Chee-Bee Cree Construction July 2021 to December 2021 CHISASIBI, QC
• Interface with cartographers, civil engineers, and project managers to develop detailed design documentation
• Examine land boundaries and property lines by researching previous land records, legal descriptions, survey records, land titles, and other documentation
• Survey the site to gather information and precise measurements on geographic, hydrographic, and topographic features
• Utilize surveying instruments such as builder’s levels and GPS (global positioning systems) to measure distances accurately
• Create digital maps and reports using GIS (geographic information systems) technology
• Advise clients, architects, and construction managers of any on-site conditions, building defects, or potential environmental impacts within boundary lines
• Prepare reports for official property boundaries on leases, deeds, plots, and legal documents
• Perform layout work, check as-built conditions, and stake out clearing boundaries and reference points on site Grand Alliance Community Information Office (GACIO) – March 2021 to October 2021
Building and maintaining effective working relationships with internal stakeholders and teams to ensure any content writing requests are fulfilled without errors or misinformation
Monitoring the brand reputation and discussions relating to the organization in media spaces while being able to respond to audiences on time
Monitoring and analyzing any benchmarks or highlights to make recommendations for improvement
Developing an overall communications strategy which could include events, social media, website content, press conferences, or emails
Creating timely and engaging content that is optimized for whatever platform it will be published on
Managing, planning, and coordinating media events
Writing and developing media materials which can include press releases, media advisories, public service announcements, and blog posts
Key achievements;
• Surveyed local community members for the awareness of what is GRAND ALLIANCE. Wemindji was first in all 9 communities. Cree Nation of Wemindji, Wemindji, QC, 2009 – 2020 Capital Projects Coordinator, 2015 – 2020
Liaised and collaborated with subcontractors, engineers, architects, and all project key stakeholders. Assumed all planning, organizing, and controlling functions for community’s Capital Projects. Oversaw projects from commencement through completion as per scope. Directed budget, cost estimation, equipment, materials, and manpower. Conducted site inspections, enforced safety regulations/building codes, devised action plans, and formulated status reports. Led training and mentorship initiatives for all construction personnel.
Key Achievements:
• Oversaw multi-million dollar projects, including $10M new water treatment plant, $34M new arena project, $5M drainage measures - covering of ditched, $8M correction to pipes - changing pipes to underside water pipes, $5M new soil treatment pad, $2M new eco center, and $5M new infrastructure installation. Director of Environment, 2009 – 2014
Supervised Staff in Water Supply and Environment health Departments. Acted as department liaison with community regarding condition of water supply, leaks, and status and directed water leak overhaul. Collated relevant data and produced various reports and work plans. Consulted Engineering Firms on Environment Issues for decontamination or remediations. Counseled Wemindji community and authorities on proper management of waste, hazardous, recycling and on compliance with all environmental regulatory bylaws. Ensured high maintenance standards of new bulk waste disposal site and the incinerator. Streamlined drinking water plant operations and led regular tests on drinking water to confirm adherence to methods prescribed in drinking Water Bylaw. Initiated and conducted environmental impact assessments within guidelines of the JBNQA section 22. Issued operator permit to new drinking water plant. Provided maps on the GIS department to community members. Assigned LOTS to individuals and institutes. Cooperated with Bruser on new drinking water plant, provided recommendations for the CIVIL worksite, and conduit connections. Maintained and updated infrastructure location, watermain, storm/sewer conduits, valves location on AutoCAD and GIS software programs.
Key Achievements:
• Spearheaded phase I and II, environmental site assessments, and new total/home Ownership.
• Conducted Environment Social Impact Assessment for new drinking water plant (2012).
• Executed soil decontamination on garage site (2013).
• New Soil Decontamination treatment pad. (2016)
continued…
Rod Mamianskum
Page 2
CCDC - York Landing, Manitoba Tawich/CCDC – Surveyor Technician, 2002– 2010 Wemindji, QC MB,
Projects: Road Construction/ Clinic Project
Performed all calculations for location coordinates on AutoCAD, including clinic/96 piles/Axis, and elevation of clinic in relation to elevation of services and watermain. Migrated all calculated data to Leica Instrument TCR705. Calculated all implantation points; implanted location of building, piles, base pillars, implant footings, manholes, control stations, floor level elevators 1 & 2, and axis. Selected Projects:
• Served as Surveyor helper on construction of infrastructure old part of Wemindji
• Assisted as Survey Instrument Man on construction works of Daycare foundation, Multi-Service Building, and New Incinerator Building (2003-2005)
• Assumed Surveyor role for New Residential/streets Visitor Drive & Matches Road, NewClinic, and Extension/renovation Community Hall, York Landing Manitoba – Clinic Foundation Surveyor – Baie James, QC, 2007
Société d'énergie de la Baie James
Project: Rupert Diversion Project
Collaborated with client, suppliers and contractors to deliver projects timely within budget. Utilized expert industry expertise to measure and calculate volume of dump trucks. Presided over formation Trimble GPS with the ACU pad. Surveyed infrastructure, MG- 80 and final grade on road. Performed survey on decapage (stripping) of the gravel pit. Fulfilled health and safety regulatory requirements while executing project in accordance with contract obligations. Selected Projects:
• Led as Quantity Surveyor on Montreal BIREX hwy 40est.
• Surveyor Technician on Montreal 40 west, TD BANK foundation Charlemagne. HWY 50 overpass Lechute
• Appointed Quantity Surveyor on Camp Rupert Project and James Bay Project. Additional Experience as Surveyor/Foreman at CCDC/Tawich Construction Inc, Surveyor Technician at Birex Inc., as carpenter/labour at Dostie & Grenier Construction Whapmagoostui and at VCC Construction Wemindji Education/Training
Civil Engineering Technician
Canadore College - North Bay, ON 1997
Civil Engineering Technology
Cambrian College – Sudbury, ON 2000
Social Social (Applied art & Tech)
John Abbott College – Montreal, QC 1993
Technical Proficiencies
Microsoft Office & Project, ArcMap GIS and AutoCAD (10+ years) References: Available Upon Request