Post Job Free

Resume

Sign in

Control Room Quality

Location:
Helwan, Cairo, Egypt
Salary:
6000 $ oer month .
Posted:
October 12, 2023

Contact this candidate

Resume:

Ramsis Anis Bassely * Thabet st, Helwan, Cairo, Egypt

E-mail: ad0b7u@r.postjobfree.com

ad0b7u@r.postjobfree.com

Date of birth : 15/10/1957

Nationality : Egyptian

Marital status : Married

Driving license : Valid

Military status : Exempted

Mobile +201*********

Skills and Qualification : Electrical Installations & Maintenance senior Supervisor

1. Responsible of Alstom installation team for Metro line 3 phase 1, 2 and 3 2. Responsible of all indoor and outdoor installation activities 3. Responsible of remarks lifting

4. Following-up the industrialisation process

5. Responsible of FAT of cables and all type of materials with client installations & Maintenance of all electrical and signaling equipment

Specialist in power station control room

Operation and control for MV station (33KV)

Connection and maintenance of networks cables

LV/MV cable junctions and terminations

1. Excellent expertise at switch yard installation of power plants works, external testing, CT, VT, as well as 500 KV & 220KV CB settings and preparation for testing

2. Indoors installations for GIS buildings of power stations 3. Cable testing of control room building

4. 500 KV & 220KV transformers installation work including refining transformers oil, oil circulation (after completing all installations refilling oil following the system air vacuuming process)

5. M.V cable welding and terminal ends works up to 33KV 6. Follow up and implementation works on site for low &medium voltage distribution electric network as pulling CABLE,O.H.T.L 7. to implement on time and with in budget

8. all low current work (signaling .cctv system .sound system . gates ) Administrative skills: (personnel management)

1. Ability to manage more than one work team or group to get the job done and completed on time according to a preset time table 2. Leading the job crew in communicating and dealing with the client to deliver the work required according to specifications

3. Ability to convince the client of approving completed work due to acquired experience knowledge of various aspects of power plants installation and operation work

4. preparing daily.weekly and monthly status reports as built drawings material requisitions

5. Providing proper feedback on project requirements, status and progress with regards to project schedule

6. Ensure that the contractor is carrying out his quality control in accordance with the specification.

7. Leading & directing for all electrical systems installation on site. 8. Supervising progress of work on site .

Experience :

ALSTOM TRANSPORT . Egypt

(feb 2010 oct 2016)

Electrical Installations & Maintenance

senior Supervisor

metro cairo line 3 phase 1 . 2 . 3 .

including 2 years in dubai tramway project (testing &commissioning) Signalling Equipment Installation, Test and Commissioning for Railways Metro and tramway .

testing &commissioning of CBI signalling system for cairo metro line (3) responsible for maintenance of CBI system for cairo metro line (3) ALSTOM Transport - Dubai

Al Safouh Tram Project (September 2012 - December 2014) Senior Electrical Supervisor for installation works of subcontractor of DCS & UPS systems in stations & Trackside and CCTV systems in Depot

Leading & directing for all electrical systems installation on site. Following up the status of submittals and approvals. Supervising progress of work on site for all electrical systems Ensure that the contractor is carrying out his quality control in accordance with the specification.

ALSTOM Egypt for Power and Transport projects

Cairo Metro Project Line 3, Phase 1 (February 2010 - September 2011) Cable Laying Supervisor and Senior Installation Supervisor for signaling and centralized control equipment

SYSTRA Dubai (Consultant to Dubai Metro Rail Link) Dubai Metro (January 2008 - January 2010)

1. Responsible for the testing and commissioning of Power supply Equipments of the Red Line & Green Line of Dubai Metro Rail Link, including the HV test of 33 KV Power cable and the Power Frequency Dry Voltage test of the 33 KV GIS

2. Secondary Injection of the protection relays including the Pilot wire testing

3. Pre commissioning and post commissioning checks of all the equipments according to the tender specification and the Manufacturer recommendations to the full satisfaction of the client

(RTA, Dubai)

4. Installation and T & C and Materials Submittal for Approval.

(Earthing and lightning protection system, Small power & Lighting system, L.V system, UPS system, CBS system, fire alarm system, FM200 gas suppression system & ECS)

ORASCOM trading Co. Ltd,

Mobinil (April 2004 - March 2008)

Senior Electrical Supervisor responsible for maintaining & installing Mobinil Switches including: rectifiers, inverters, UPS, ATS, PLC, STS with DC coupler, harmonic analyzer, generators and fire alarm\fighting systems

Designing & implementing electrical panel

ALSTOM Transport

Cairo Metro Project Line2, (February 2000 - March2004) Cable Laying Supervisor and Senior Installation Supervisor for signaling and centralized control equipment

ALSTOM Egypt S.A.E, T & D

Power Stations & substations (July 1997 - December 2003) Senior Electrical Supervisor (assistant to site manager) A) Power stations:

1. West Cairo power plant 500/220KV GIS

2. Eyoun Mousa power plant 500/220KV GIS

3. East Port Said power plant 220KV GIS

4. Gulf Suez power plant 200KV GIS

B) Power substations:

1. Luxor S/ST 220/66/11 KV

2. Taba S/ST 500/400/220/22KV “international connecting station”

3. Aswan S/ST 220/66/11 KV

4. Alexandria port S/ST 220/66/11 KV

5. Karmoz S/ST 220/66/11 KV

6. Sakr kourash S/ST 220/66/11 KV

C) Stations Extension:

1. Cairo 500 improving capability capacitor bank 220/66KV 2. ElMansoura "sandob" improving capability capacitor bank 220/66KV

3. Cairo East improving capability capacitor bank 220/66KV GEC ALSTHOM Transport “Egypt branch”

Giza/Beni Suef Railways Project (October 1991 - June 1997) Senior Electrical Technician - Installation, Commissioning & Maintenance of:

1. 5.5/11KV VM6 & DM12 Switch Gears

2. 5.5-11KV/380V Transformers

3. LV Distribution Panels

4. Diesel Engine

5. Stand-by Rotating Set (Power Generator)

6. Battery Chargers 24/48VDC

7. Batteries

8. MV/LV cable junctions and terminations

9. UPS

VOEST “ALPINE” CCM

Helwan Iron and steel factory (February 1990 - September 1990) Senior Electrical Technician

SAE SADELMI

Cairo South Power Station (August 1988 - February 1990) Senior Electrical Technician

FRUCON Construction Corporation

Sewage treatments pumping station (February 1988 - August 1990) Senior Electrical Technician

PERINI Ayoubco- Hewlan Community

Residential Community Complex (October 1985 - August 1987) Electrical Technician

BBC Brown Boveri Co.

Wadi Hof power station (February 1985 - August 1985) Electrical Technician

IEMSA

Shubra El Kheima power station (June 1983 - February 1985) Electrical Technician

Education:

Industrial Diploma 5 years - May 1975 Electrical Department - Helwan/Cairo COMPUTER EXPERIENCE

●Literate user on the internet ●Outlook Express ●Microsoft Word

●Microsoft Excel ●Microsoft Power Point ●Microsoft Access References are available on request.



Contact this candidate