Post Job Free

Resume

Sign in

Project Manager Construction

Location:
Escondido, CA
Posted:
November 17, 2023

Contact this candidate

Resume:

MICHAEL ARENSON

***** ******* **, *****, **. ****4 Mobile 619-***-****

E-Mail: ad08vq@r.postjobfree.com Objective: Utilization of my Experience

RELATED EXPERIENCE

Project Manager Engineer, AT&T Network Operations Southern, Ask Staffing, San Diego Cty, Review customer fiber order logistics & implement fiber interface from source to end user current and future demand. 4/2/16 to 4.15.17. My responsibilities include meet customers, implement requirements, design, engineer, photo records; Develop SOWs, CEPT, ASE, MIC, Transport, and Permitting with either Municipalities or Caltrans. Provision fiber to customer handoff interface at MPOE to meet proactive room ready requirements. SDLEC & ASE, Ceina, Cisco, Oracle, Flash eWave proprietary internal firewall integration equipment applications, design, engineering, coordination with engineering planners with related upstream wheel, spoke and hub systems and engineers. Oversight QA. Supervisor 619-***-****

Field Verification, Sprint Mobilitie, Sasco Electric, Los Angeles Cty, Orange Cty, San Diego Cty, Review of proposed site locations for DAS and Tower New Builds. 3/23/16 to 4/20/16. Sprint Mobilitie are slowing project capital expenditures, Mobilitie issued stop work order to vendors. Sprint stock values dropping to 3.68 per share all time low. Duties include site visit at locations of existing infrastructure and their relation to new sites. Photo, Descriptive Record with Site Summery Reports. Show existing elements to support development of Site Locations or alternates. Site Feasibility, Site Design, Engineering, SOWs, SAPs, Cost estimate’s to Complete Build for client & budget review. Supervisor 760-***-****

Construction Project Manager, Cricket, AT&T Decom Project, Jacobs Engineering, Chicago Ill., Wisconsin, Milwaukee, Indiana, Ohio, 2/9/15 to 4/20/15. Construction coordination between Cricket and AT&T- Review, Schedule, Site Surveys, Implement phases of Lease Termination, Removal of equipment from Lease Area in coordination with Land Lords and maintain a smooth transition during this process. I increased company run rates. I Created Site Action Plans with supporting photo records for each of the 522 sites which were converted to SOWs for vendors to Bid SAPs. This process reduced overhead. A&E plans and engineering in house, I performed Utilities coordination in house. Supervisor 760-***-****

Construction Project Manager, Metro PCS, T MOBIL Decom Project, CSI, Orange Cty, Los Angeles Cty. 11/22/14 to 2/9/15 -Construction coordination between Metro PCS and TMO for completion Termination of Lease and Removal of Equipment from lease areas. Site surveys and SOW developed, meet with Property Owners and coordinated all related functions to satisfy Lease Termination and Owner Lease requirements per site. Implemented, scheduling in house and coordinated roofing bids and direct daily status reports to TMO Project Constr. Manager. A&E firms I worked with; Booth & Suarez, Rohm, MSA. Utilities in House. Supervisor 760-***-****

Lead Construction Project Manager, Alcatel Lucent for Verizon, Kineticom, San Diego., Las Vegas, 2/15/14 to 7/22/14 Construction management of 400 AWS and System Modernization sites throughout the Las Vegas Market. Coordination of contract milestones from construction complete to Close Out Packages per site. Coordination of Verizon and Alcatel Lucent contractual vendor agreement’s. Coordinated third party audits and related corrections per contract polices and standards. FST Data Input. Tracking site progress of vendors and direct daily reports to Verizon, Alcatel internal management. A&E and support firms I worked with; Broken Arrow, Pinnacle, DMM, Delta Grp., L&B, H2M Hill. I performed in house Utilities. Supervisor 702-***-****

Lead Construction Manager, Sprint Nextel Phoenix Decom, Westower Com., San Diego, Orange County, Los Angeles, Ventura, New York, New Jersey, Phidelipia, 7/6/12 to 6/30/13 Construction coordination between Sprint Nextel Management and Westower field staff. Logistical coordination and Land Lord negotiations with Black Dot, Pinnacle and others for on site solutions. Responsibilities for Completion of Termination of High Profile and high security Nextel leases and removal of equipment. Prior to my arrival, New York City, Manhattan, Bronx, Burrows, Long Island, Staten Island, Nantucket, Upper, Lower NY & New Jersey City, Atlantic City, Point Pleasant, Toms River sites Run Rates were running very slow and I was able to Increase in house run rates and complete difficult sites including the George Washington Bridge, Lincoln and Holland Tunnels by creating a two-shift Demo Tiger Team that reduced man hours on site increasing profit margins by 3x. A&E and support firms I worked with; Booth & Suarez, M Squared, MSA, Black Dot, Pinnacle, Squan. I performed in house utilities. Supervisor 760-***-****

CM/PM, ATT Turf Project, Central Valley Phase I, Carmel, Monterey, Yosemite, Kings Valley, Fresno, Ca. Black & Veatch 2/28/12 to 7/5/12 Supervisor 770-***-**** Construction manager for site development of new builds and mods for LTE, 5, 4, 3, 2 C as well as DAS design and installations at public Right of Ways, private properties. Responsibilities include team management, site surveys, SOW, bid and award, equipment coordination, Orders of magnitude, status reports, conference calls, vendor meetings follow ups and reviews. A&E and support firms I worked with; In House Black & Vetch, R&D, Rome, Caltrop, Zack Krueger and I performed in House Utilities. I performed and produced the Third Party Audit reports with photo records in the multi million-dollar contract reconciliation between Ericsson and AT&T during the internal strike potentials between Wire line group and Wireless group at the San Ramon Main Office of AT&T and completion of project.

Construction Project Manager II, Ericsson Communications, Houston, GCB, RF Modernization & Beta DAS Ericsson 8/15/11 to 4/28/12 Supervisor 832-***-**** Sprint Leap Vision Project, Beginning phases of LTE modernization project, responsible for bringing Fiber Ethernet and microwave solutions to T-1 based sites and installing New Nortel, Ericsson Systems, Removing Bell Labs, GTE, Bell South Systems, Site progress reports and data into data bases Sitehandler, Siterra, FST, Cisco Data, Running deployment calls with Sprint Kansas KC, Ericsson Plano Texas. A&E firms I have worked with; In House Ericsson Plano Texas, Nexgen, BCI and Telkore as Third party Audits.

Construction Project Manager, Westower Communications, San Diego, 6/1/10 to 9/1/10 Supervisor 760-***-**** Completion of milestones and data into Clearvision, Siterra. WHIP Support. Run Deployment Calls to completion, Project closed by Clearwire. A&E support firms I worked with; MSA, M Squared, Booth & Suarez, Rome, Permits In Motion.

Construction Project Manager, Clearwire, San Diego, Smartlink, 2/1/10 to 6/1/10 Supervisor 760-***-**** Construction Manager for backhaul and local area WiMAX integration currently developing sites to accomplish this goal. My responsibilities include site feasibility, zoning, planning, engineering, A&E coordination and permitting. Bidding and awards construction oversight and execute to completion. I handled high profile projects and met with San Diego Mayor, Planning Dept. Head to work out siting goals for Clearwire. A&E and support firms I worked with; Booth & Suarez, M Squared, MSA, Permits In Motion, Permit Us.

Project Manager Consultant, San Diego & Las Vegas Launch, CBMS Inc. Cricket Com.,2/1/06 to 3/26/08 Supervisor 760-***-**** Responsibilities include from concept to on air. Utilities coordination with SDG&E & Nevada Power, Sprint, AT&T, I have been working with North & East S.D. County Municipalities in all areas of site development. Successful launch of 156 sites in one year. I was responsible for forty-five on air sites for launch in San Diego and sixty-five sites in Las Vegas launch for Cricket Communications. I was instrumental in setting up high profile meetings with San Diego Mayor Rickard Sanders, Planning Dept. head Karen Ann Ashcraft, Cricket-Lear Com. CEO Hale Vorland, myself to allow critical path siting in exchange for a playground, successful. A&E and support firms I worked with; Mark Berlin in House, MSA, M Squared, Rome, Permits In Motion, Permit Us.

Manager and Director of Operations, MAC Developers Inc., 1/5/00 to 1/15/06 Supervisor 619-***-**** Responsibilities included marketing, estimation and break downs, bidding, contracts, negotiations, site development, implementation, project oversight, project management, client vendor trade milestone deployment meetings and conference calls, presentations, close out and finalization, final account audits. Projects included residential and commercial Projects throughout San Diego County, Los Angeles, Nevada, Arizona, Idaho, Washington State, New York, 1559 Beryl Street SD, CWA Development, 1300 Olympic Blvd, 3609 Hughes Av., Beach Front Malibu Homes, Hollywood, Bellaire, Los Angeles Hillside Homes, Seismic and Fire Sprinkler Designs and Implementation. Commercial Apartments and Condos. Total value of projects 8.2 million successfully completed. A&E and support firms I worked with; Russ Ulep- CAD Expert, Michael Shewbridge-AIA, Mark Berlin-Municipality Regulations, Michael Arenson Construction (In House Contractor #419493), Permits In Motion.

Project Manager, AT&T Fixed wireless,(U-Vrse) San Diego and North Cty South Bay. Gianni & Associates, 1/4/01 to 12/21/01 Supervisor 818-***-**** Management of phase 2 and 3, design, coordinate submittals for land use and planning review, meet with planners and push projects forward to permitting, bidding and review, award selection, management of contractors and sub-contractors to complete projects on time and on budget. Complete close out packages to client, verify specifications of site completion Standards for ATT for civil site acceptance to Operations, coordinate operations requirements specials final closeout in Sierra, CASPER and Timberline. A&E and support firms I worked with; MSA, Booth & Suarez, Jeff Rome, Permits processed in house team and myself handling high profile sites and meetings with San Diego Mayor Richard Sanders, Karen Ann Ashcraft and his liaison’s to achieve siting goals.

Project Director Consultant, Sprint PCS San Diego, Caraway Com., 2/12/99 to 2001 Regional Oversight Mgr. 214-***-**** Contracted to manage the ramp up and site development for phase 3 sites 200 site candidates, My responsibilities included team development and structure, site design, site feasibility, zoning drawings, submittals, structural’s, I was responsible for 32 sites on air in one year, weekly and daily deployment conference meetings with Kansas City. Telecom moratorium was in effect in San Diego and Los Angeles. A&E and support firms I worked with; MSA, Rome, Plan Com., Permits In Motion.

Project Manager Consultant, Omnipoint Com. (T-Mobile), Midwest Wireless Detroit MI., 1998 to 1999 Supervisor 734-***-****, Robert Lutz, Robert Burger Construction management for aggressive build out of 400 sites of which I successfully completed all sites on air for launch. Worked on in house designs, implementation of new Antennas and Radio Head designs from Ericsson.

Project Manager Consultant, Omnipoint Com.,(TMO) Midwest Wireless New England. 1997 to 1998 Supervisor 760-***-**** Construction management for aggressive build out of 1400 sites of which I successfully completed 300 sites on air for launch with my team. A&E in house.

Project Manager Consultant, Pacific Bell Mobile Services LAX,(ATT) Caraway Com., 1995 to 1997 Supervisor 714-***-**** Construction management for first PCS aggressive build out of 1600 sites of which I was responsible for 360 sites from Los Angeles to Ontario, I completed on air for launch. A&E in house with internal review by Rick Workman LEC, Dean Hanzelman AIA, Andy Venuti AIA, Michael Shewbridge AIA, Dave Putnam AIA, and Calvada surveys, myself as coordinator.

Project Manager Consultant, Hughes Air & Space Div.,(HughesNet) LA., MAC., 1993 to 1995 Project Controls of Hardened Infrastructure to build four satellite control and communication stations, civil work under the direction of NASA, GSA, Engineering for satellite traffic control in California, Nebraska, Michigan, and New York. Successfully Completed. A&E firm I worked with SAIC Michael Arenson PE in Chicago Ill

Education: 1972 Fairfax HS, Los Angeles Ca,. Graduated

1974 Los Angeles City College, Los Angeles Ca., Graduated Class Specific Courses

2014 Pace University NYC, NACTEL on line Class Specific Courses



Contact this candidate