CONTACT
INFORMATION
Cuma SARI
MECHANICAL PIPING SUPERVISOR
PIPE SPOOL FABRICATION & ERECTION
HYDROSTATIC & PNEUMATIC TESTS
Education: Bachelor Degree, MECHANICAL ENGINEER
K.ZhubanovAktobe Regional State University
Kazakhstan/ AKTOBE
TRAINING AND CERTIFICATIONS: NAKC QA/QC Level III
НГДО п. 1,3,4,5,12 КО п. 1,2,3,4,5 ГО п. 1,2,3,4,5,6,7 Mobile Phone : +90-536-***-****
Whatsapp +791*-***-****
Home Phone : +90-216-***-****
Date of Place : ELBISTAN/TURKEY
Date of Birth : 01/09/1969
Gender : Male
Nationality : Turkey
Email Address: **********@*******.***
Languages: English (Native), Russian (Native),
Turkish (Native) Kurdish (Native)
Computer Skills: Ms Office (Ms Excell, Ms
Word)
Driving License: C
WORKING EXPERIENCES (30 YEARS)
Company:.. SAİPEM S.PA. JV. USTAY AS.
Project : GASPROM SRU PROJECT MOSKOV/ RUSSİA
Client : GASPROM
Position :Mechanical Piping Supervisor
Duration : February 2020. November -2022
JOB RESPONSIBILITIES:
• Main responsibility Controlling high pressure Leak Test activities performed by Subcontractors
• Hydrostatic and Pneumatic High Pressure Leak Test and Reinstatement, Blowing and Flushing
• Supervision of all piping works and ensures safety and quality standards. Company : MAIRE TECNIMONT S.P.A
Project : AMURSKY GAS PROCESSING PLANT PROJECT
Client : GAZPROM/ AMUR/RUSSİA
Position : Mechanical Piping Supervisor
Duration : August 2018 -December 2019
JOB RESPONSIBILITIES:
• Works built by subcontractors. piping manufacturing and assembly works.
• Hydrostatic Tests and Pneumatic Tests in accordance with inspection and quality standards for all piping work activities carried out including monitoring and reporting.
• 56 " 16 km. Pipeline calibration and Pressure Test Preparations were made and the Test was successfully completed with a pressure of 126 bar 2/5
Company : REGA JV. Renaissance Heavy Industries Construction Project : YAMAL SPG. LNG – 1 - PROJECT /RUSSİA
Client : YAMAL SPG LNG- 1
Position : Mechanical Piping Supervisor
Duration : May 2016 – March 2018
JOB RESPONSIBILITIES:
• The main Responsibility is to organize and manage the Test Team on the field. Hydrostatic and Pneumatic High Pressure Leak Test and Reinstatement, Blowing and Flushing activities
• Supervision of all piping works and ensures safety and quality standards.
• 1400 test packages were made and delivered safely. Company : ENKA A.S Construction & Industry Engineering for a better future Project : Suleymaniyah Combined Cycle Power Plant Project- Suleymaniyah/IRAQ Client : MASS Group Holding Company
Position : Mechanical Piping Supervisor
Duration : January 2014 - January 2016
JOB RESPONSIBILITIES:
• Supervision of all piping works and ensures safety and quality standards.
• Fabrication and Erection ACC/CS Piping (302 tons).
• Fabrication and erection of Water Treatment Plant C.C. Piping (25 tons).
• Erection of STG Large Bore (P91) piping (2275 Tons).
• Fabrication and erection Small Bore C.C/CS/P91/Piping (27000 meters).
• Erection of STG pipe supports (6239 peaces)
• 4 x 15000 m Diesel and.1- 3000 m Raw water and 1- 3000 m Demi Water Tank Assembly held
Company; Tecnicas Reunidas/ ENKA A.S Construction Industry Engineering for a better future Project : Refinery Hydroprocessing Expansion Project- Khabarovsk/Russia Client : Alliance Oil Company/Tecnicas Reunidas
Position : Mechanical Piping Supervisor
Duration : February 2010 / December 2013
JOB RESPONSIBILITIES:
• Main responsibility to supervise pipe fabrication and Erection teams on the field
• Fabrication & Erection of all piping works (9000 tons Pipe) without LTA.
• Controlling Piping Works according to Quality Standards.
• Hydrostatic Testing and Pneumatic Testing.
• 915 test packages were made and delivered safely. 3/5
Company : BECHTEL JV. ENKA A.S Construction & Industry Engineering for a better future Project : Sakhalin II Phase 2 Project, Onshore Processing Facility Client : Sakhalin Energy Envesment Company/RUSSİA
Position : Mechanical Piping Supervisor
Duration : April-2004 / October-2009
JOB RESPONSIBLITIES:
• Fabrication & erection of all piping works without LTA.
• Controlling piping works according Quality Standards.
• Hydrostatic Testing and Pneumatic Testing.
• 1620 test packages were made and delivered safely.
• Maintenance Operations and Preparing shutdown for tie-in points and valve, strainer and hvac systems
Company : MITSUBISHI JV. ENKA A.S Construction Industry Engineering for a better future Project : AEB Power Plant Project, Kahramanmaras/TURKEY Client : EUAS/Turkey
Position : Mechanical Piping Supervisor
Duration : June 2002 / February 2004
JOB RESPONSIBLITIES:
• Piping erection (P91-P22-P11-CC-CS)(Between Boiler and Turbine Main Steam Lines ) works without LTA.
• Controlling piping works according Quality Standards. Company : BECHTEL JV. ENKA A.S Construction & Industry Engineering for a better future Project : Refurbishment of the existing Sulphur Recovery Unit 2.1 & 2.2 and LPG Unit Client : TENGIZ OIL/ KAZAKHSTAN
Position : Mechanical Piping Supervisor
Duration : March 1995 / May 2002
JOB RESPONSIBLITIES:
• Controlling piping works according Quality Standards.
• Erection of all support and piping works.
• Preparing shutdown for tie-in points.
• Hydrostatic Testing and Pneumatic Testing.
• 1310 test packages were made and delivered safely Company : ENERKAL A.S Construction & Industry Engineering Project : Hydroelectric Power Plant Project/MERSIN/TURKEY Position : Mechanical Piping Foreman
Duration : January. 1993/ January.1995
JOB RESPONSIBLITIES
• Fabrication and erection of all Mechanical Piping and support works without LTA. 4/5
Company : BELELI C.P.E. JV NUOVA CIMIMONTUBI S.p.A. Project : Arak Refinery Project/IRAN
Position ; Mechanical Piping Foreman
Duration ; January 1991/ December 1992
JOB RESPONSIBLITIES
• Fabrication and erection of all piping works without LTA.
• Erection of all support and piping works.
• Maintenance Operations and Preparing shutdown for tie-in points and valve, strainer / heat exchangers
Company : AMEC FOSTER WILLER/ WOOD
Project : Revision and Rehabilitation Crude Oil Rafinery Project, ARUBA Position : Pipe Fitter Lead Head
Duration : January 1989/ December 1990
JOB RESPONSIBLITIES
• Fabrication&Erection of all Piping Works without LTA.
• Erection of all support and piping works
• Maintenance Operations and Preparing shutdown for tie-in points and valve, strainer REFERENCES
Yusuf ERGUL
Project Manager
SAİPEM S.P.A JV USTAY AS.
Moscow SRU Project
Gsm : +7-914-***-**-**
******@*****.***
Murreda SALVATORE
MAIRE TECNIMONT S.P.A Construction
Piping Superintendent
Gsm : +7-914*******
*******@*********.**
Hrvatin DERIS
Field Project Manager at Sonangol
Oil Field in Northern Iraq
Gsm : +385-**-***-****
******@*****.***
5/5