Post Job Free

Resume

Sign in

Mechanical Piping Supervisor

Location:
Mazeikiai, Lithuania
Salary:
6000
Posted:
November 12, 2023

Contact this candidate

Resume:

*/*

CONTACT

INFORMATION

Cuma SARI

MECHANICAL PIPING SUPERVISOR

PIPE SPOOL FABRICATION & ERECTION

HYDROSTATIC & PNEUMATIC TESTS

Education: Bachelor Degree, MECHANICAL ENGINEER

K.ZhubanovAktobe Regional State University

Kazakhstan/ AKTOBE

TRAINING AND CERTIFICATIONS: NAKC QA/QC Level III

НГДО п. 1,3,4,5,12 КО п. 1,2,3,4,5 ГО п. 1,2,3,4,5,6,7 Mobile Phone : +90-536-***-****

Whatsapp +791*-***-****

Home Phone : +90-216-***-****

Date of Place : ELBISTAN/TURKEY

Date of Birth : 01/09/1969

Gender : Male

Nationality : Turkey

Email Address: ad02hy@r.postjobfree.com

Languages: English (Native), Russian (Native),

Turkish (Native) Kurdish (Native)

Computer Skills: Ms Office (Ms Excell, Ms

Word)

Driving License: C

WORKING EXPERIENCES (30 YEARS)

Company:.. SAİPEM S.PA. JV. USTAY AS.

Project : GASPROM SRU PROJECT MOSKOV/ RUSSİA

Client : GASPROM

Position :Mechanical Piping Supervisor

Duration : February 2020. November -2022

JOB RESPONSIBILITIES:

• Main responsibility Controlling high pressure Leak Test activities performed by Subcontractors

• Hydrostatic and Pneumatic High Pressure Leak Test and Reinstatement, Blowing and Flushing

• Supervision of all piping works and ensures safety and quality standards. Company : MAIRE TECNIMONT S.P.A

Project : AMURSKY GAS PROCESSING PLANT PROJECT

Client : GAZPROM/ AMUR/RUSSİA

Position : Mechanical Piping Supervisor

Duration : August 2018 -December 2019

JOB RESPONSIBILITIES:

• Works built by subcontractors. piping manufacturing and assembly works.

• Hydrostatic Tests and Pneumatic Tests in accordance with inspection and quality standards for all piping work activities carried out including monitoring and reporting.

• 56 " 16 km. Pipeline calibration and Pressure Test Preparations were made and the Test was successfully completed with a pressure of 126 bar 2/5

Company : REGA JV. Renaissance Heavy Industries Construction Project : YAMAL SPG. LNG – 1 - PROJECT /RUSSİA

Client : YAMAL SPG LNG- 1

Position : Mechanical Piping Supervisor

Duration : May 2016 – March 2018

JOB RESPONSIBILITIES:

• The main Responsibility is to organize and manage the Test Team on the field. Hydrostatic and Pneumatic High Pressure Leak Test and Reinstatement, Blowing and Flushing activities

• Supervision of all piping works and ensures safety and quality standards.

• 1400 test packages were made and delivered safely. Company : ENKA A.S Construction & Industry Engineering for a better future Project : Suleymaniyah Combined Cycle Power Plant Project- Suleymaniyah/IRAQ Client : MASS Group Holding Company

Position : Mechanical Piping Supervisor

Duration : January 2014 - January 2016

JOB RESPONSIBILITIES:

• Supervision of all piping works and ensures safety and quality standards.

• Fabrication and Erection ACC/CS Piping (302 tons).

• Fabrication and erection of Water Treatment Plant C.C. Piping (25 tons).

• Erection of STG Large Bore (P91) piping (2275 Tons).

• Fabrication and erection Small Bore C.C/CS/P91/Piping (27000 meters).

• Erection of STG pipe supports (6239 peaces)

• 4 x 15000 m Diesel and.1- 3000 m Raw water and 1- 3000 m Demi Water Tank Assembly held

Company; Tecnicas Reunidas/ ENKA A.S Construction Industry Engineering for a better future Project : Refinery Hydroprocessing Expansion Project- Khabarovsk/Russia Client : Alliance Oil Company/Tecnicas Reunidas

Position : Mechanical Piping Supervisor

Duration : February 2010 / December 2013

JOB RESPONSIBILITIES:

• Main responsibility to supervise pipe fabrication and Erection teams on the field

• Fabrication & Erection of all piping works (9000 tons Pipe) without LTA.

• Controlling Piping Works according to Quality Standards.

• Hydrostatic Testing and Pneumatic Testing.

• 915 test packages were made and delivered safely. 3/5

Company : BECHTEL JV. ENKA A.S Construction & Industry Engineering for a better future Project : Sakhalin II Phase 2 Project, Onshore Processing Facility Client : Sakhalin Energy Envesment Company/RUSSİA

Position : Mechanical Piping Supervisor

Duration : April-2004 / October-2009

JOB RESPONSIBLITIES:

• Fabrication & erection of all piping works without LTA.

• Controlling piping works according Quality Standards.

• Hydrostatic Testing and Pneumatic Testing.

• 1620 test packages were made and delivered safely.

• Maintenance Operations and Preparing shutdown for tie-in points and valve, strainer and hvac systems

Company : MITSUBISHI JV. ENKA A.S Construction Industry Engineering for a better future Project : AEB Power Plant Project, Kahramanmaras/TURKEY Client : EUAS/Turkey

Position : Mechanical Piping Supervisor

Duration : June 2002 / February 2004

JOB RESPONSIBLITIES:

• Piping erection (P91-P22-P11-CC-CS)(Between Boiler and Turbine Main Steam Lines ) works without LTA.

• Controlling piping works according Quality Standards. Company : BECHTEL JV. ENKA A.S Construction & Industry Engineering for a better future Project : Refurbishment of the existing Sulphur Recovery Unit 2.1 & 2.2 and LPG Unit Client : TENGIZ OIL/ KAZAKHSTAN

Position : Mechanical Piping Supervisor

Duration : March 1995 / May 2002

JOB RESPONSIBLITIES:

• Controlling piping works according Quality Standards.

• Erection of all support and piping works.

• Preparing shutdown for tie-in points.

• Hydrostatic Testing and Pneumatic Testing.

• 1310 test packages were made and delivered safely Company : ENERKAL A.S Construction & Industry Engineering Project : Hydroelectric Power Plant Project/MERSIN/TURKEY Position : Mechanical Piping Foreman

Duration : January. 1993/ January.1995

JOB RESPONSIBLITIES

• Fabrication and erection of all Mechanical Piping and support works without LTA. 4/5

Company : BELELI C.P.E. JV NUOVA CIMIMONTUBI S.p.A. Project : Arak Refinery Project/IRAN

Position ; Mechanical Piping Foreman

Duration ; January 1991/ December 1992

JOB RESPONSIBLITIES

• Fabrication and erection of all piping works without LTA.

• Erection of all support and piping works.

• Maintenance Operations and Preparing shutdown for tie-in points and valve, strainer / heat exchangers

Company : AMEC FOSTER WILLER/ WOOD

Project : Revision and Rehabilitation Crude Oil Rafinery Project, ARUBA Position : Pipe Fitter Lead Head

Duration : January 1989/ December 1990

JOB RESPONSIBLITIES

• Fabrication&Erection of all Piping Works without LTA.

• Erection of all support and piping works

• Maintenance Operations and Preparing shutdown for tie-in points and valve, strainer REFERENCES

Yusuf ERGUL

Project Manager

SAİPEM S.P.A JV USTAY AS.

Moscow SRU Project

Gsm : +7-914-***-**-**

ad02hy@r.postjobfree.com

Murreda SALVATORE

MAIRE TECNIMONT S.P.A Construction

Piping Superintendent

Gsm : +7-914*******

ad02hy@r.postjobfree.com

Hrvatin DERIS

Field Project Manager at Sonangol

Oil Field in Northern Iraq

Gsm : +385-**-***-****

ad02hy@r.postjobfree.com

5/5



Contact this candidate