Post Job Free

Resume

Sign in

Design Engineer Mechanical

Location:
Oakville, ON, Canada
Posted:
November 12, 2023

Contact this candidate

Resume:

KHUSRO KHAN (Mech Eng.)

**** ******* **** ********

H 289-***-**** C 647-***-**** ad027h@r.postjobfree.com

MECHANICAL DESIGN ENGINEER

HVAC Plumbing sheet metal I natural gas

PROFILE

More than 10 plus years experience globally with multi-national companies as a Mechanical Design Engineer in delivering engineering solutions for projects such as Hotels, libraries, Shopping centers, Restaurants, small, medium and high rise buildings, Industrial projects, fitness centers and gymnasiums. Experience includes knowledge in using mechanical Codes such as IEC, IMC, ASHRAE 60.1, 90.1, 140, SMACNA, NFPA Standards, Uniform Plumbing Code Standards, IAPMO Installation standards, MMAH Supplementary standards SB-10, SB-1, SB-2, SB-12, National Standard Plumbing Code, and Industrial Ventilation Standards & NECB Standards.

METRO STAR PLUMBING 2020 – 2023

HVAC, Plumbing and Fire Protection Systems

Mechanical Estimator

Recording and comparing bids from multiple vendors and subcontractors.

Finding ways to submit bid on time before closing.

Creating bills and invoices, and receiving payments from customers.

Preparing changes to costs estimates when customers change their plans, or when the availability of materials or labour changes as per addendums.

Preparing schedules for construction progress to let customers know how long projects will take.

Making reports about expenses for the duration of the project.

Visiting job sites and analyzing blueprints and plans.

WORKED WITH DIFFERENT ON CONTRACT BASIS 2019 – 2020

HVAC, Plumbing and Fire Protection Systems

Mechanical Estimator / Coordinator

Worked on various projects with different contractors doing estimation / Design Build for various projects like 33 Isabella street project Toronto, 2525 Bathurst street project Toronto, Hamilton - Wentworth School Board, NIA Centre project, Marksville / Chevrolet Cadillac showroom project HWY 7, Food Basic project, Seneca College project, Barrie Cannabis store project, Barrie Queen’s Hotel Project using FAST pipe digital estimating mechanical software. Also did Design Build for West Lincoln Memorial Hospital at Grimsby and Wellesley Recreation Centre.

MECHWAYS ENGINEERING CONSULTING ENGINEERS, ON 2014 – 2019

HAVC, Plumbing & Fire Protection systems

Mechanical Design Engineer

Preparation of design basis documents to support the Mechanical Design Packages

Analyzed the existing buildings, systems and equipment to check the compliance with the codes and standards for HVAC projects − Made recommendations based upon the analysis.

Reviewed HVAC & Hydronic piping analysis

Developed concept layout and design of HVAC, air and waterside systems.

Performed necessary design calculations to understand load requirements of spaces throughout a building.

Field surveyed buildings for verification of existing conditions of HVAC systems and construction constraints.

Designed and reviewed heating/cooling load and ventilation calculations, provided sizing, selection and specification of HVAC equipment & Plumbing System.

Designed hydronic piping systems, reviewed fire protection systems and developed controls for integration into building management system.

Assisted the mechanical team to deliver project as per Codes & standards − Interfaced with internal as well as external clients to meet the technical standards for design packages − Helped execute the project within budget and schedule.

Interfaced with different stakeholders

Prepared project proposal, cost estimates and work breakdown structures for different projects

Prepared the technical reports based on the findings of the HVAC design analysis.

Selection of HVAC Equipment coordination with manufacturers. Preparation of project specifications and documents.

Coordinated new HVAC systems with other MEP departments and architectural firms to ensure no conflict exists.

Reviewed and processed various submittal information and shop drawings from general contractors and vendors.

Developed and designed the Heating, Ventilation & Air Conditioning (HVAC) systems for a 6000 sq. ft. laboratory at McMaster University with distinctive attention to the exhaust systems within the set budget of $200,000 to maintain desired environmental conditions in a space client’s building program and design intent.

Collaborated with an internal team of Lead Engineer, Drafting Technician and external stake holders, including Fire Department, Building Architects and School Administration to ensure all safety requirements, codes, cost and time lines were maintained.

Developed and designed Mechanical Systems for Fire Station, New Community Centre,

Successfully designed and operated school classroom unit ventilator (as per building code) to provide heating and cooling (hydronic heating with DX cooling) and fume hood exhaust along with plumbing

Designed and installed “Biological Safety Cabinets” and maintenance of required pressure as per CSA Z317 code in hospitals and pharmacies.

Designed and integrated upgrades as part of major additions and renovations at the Correctional Facility / Detention Centre that included: plumbing, fire protection, heating, cooling, ventilation and building automation controls.

Design of mechanical systems to successfully convert a church to computer labs to house 200 students, ensured HVAC upgrades met the current code requirements and energy conservations features were installed to improve the energy performance of the building.

Designed central air-conditioning system to meet ventilation requirements of the building occupants and updated existing kitchen exhaust system and the makeup air unit, including HVAC duct layout with fire rated diffusers / return grilles.

Designed of central air conditioning with ventilation system and layout of ducting as per ASHRAE, SMACNA and Ontario building code.

Provided feedback and knowledge when selecting equipment, calculating engineering costs and utilizing energy conservation features.

MOON-MATZ LTD. CONSULTING ENGINEERS, MISSISSAUGA ON 2012- 2014

HAVC, Plumbing & Fire Protection systems

Mechanical Designer

Prepared the technical reports based on the findings of design analysis

Responsible for delivering quality services by designing high-end HVAC systems, Hydronic Piping Systems and Air distribution systems (Duct systems) for residential and commercial projects.

Defined the project scope and prepared the proposals and cost estimates of projects Prepared the work break down structure of projects

Evaluated, Checked and reviewed the design of HVAC & Hydronic piping systems using ASHRAE Standards 62.1, 90.1 & 140. Considering sustainability, pertaining to responsible energy and environmental design, as well as constructability of the design.

Prepared the technical specifications for heat exchanger, Custom Air handling Equipment, Heating, HVAC Equipment, Special ventilation system, Ductwork, Grilles & Diffusers, Domestic Hot Water Tanks, Pumps, Sprinkler Systems, Natural Gas Piping, Thermal Insulation, Pipes, Fittings & Valves and BAS from National Master Specification (NMS) for the clients.

Performed heating and cooling load calculations using Carrier’s HAP software, and preparing and adjusting load documents for equipment selection.

Assisted with coordination services between different trades.

Prepared and reviewed IFT (Issued for tender) and IFC (Issued for Construction) packages.

Successfully assisted the mechanical team for the design of GO Metrolinx’s Bus Storage Facility Expansion at Streetsville ON, effectively keeping the cost under $2M for a 20,000 sq. ft. area while collaborating with other stake holders including Structural, Electrical and Architectural companies.

Designed updates, extensions, renovation of existing exhaust system, HVAC, Fire Protection and gas monitoring systems utilizing in depth knowledge of Ontario building codes, laws and standards.

Father Leo Catholic School Project (Durham Catholic District School Board): Boiler Replacement & Hydronic Piping Replacement

John Pereyma Catholic School Project (Durham Catholic District School Board). − The scope included analysis, assessment and preparation of design documents.

Renforth Rapid Bus Transit Project, Renforth.

CFB Borden Project.

Court Project.

SNC Lavalin project.

Collaborated with internal and external stake holders, discussed challenges and processes maintaining strict timelines and budgetary requirements.

SERVO CRAFT LTD (ELECTROMECHANICAL ENGINEERS AND CONTRACTORS), NORTH YORK ON

HAVC, Plumbing & Fire Protection systems

Mechanical Coordinator 2011- 2012

Worked on TTC Project for Inglis building at Bathurst Street for renovating Computer Rooms A/C’s (Data Center), supervised the installation of Air conditioning systems.

Implemented safety trainings such as; WHIMS, Fall Protections and “Basics of supervising at the Site” safeguarding staff, trades workers and labourer safety.

S.A ARMSTRONG LTD. SCARBOROUGH, TORONTO, CANADA 2010 - 2011

Pumping Systems

Mechanical Engineering (Co-op)

Assisted Engineers in testing pumps (centrifugal, horizontal end suction pumps, horizontal & vertical split case pumps, vertical multistage in-line pumps, vertical turbine pumps).

Creating performance characteristics for the above mentioned pumps. Used SPAIX Pump selection software for the selection of centrifugal pumps. Creating pump quotes by using pricing provided.

KHATIB & ALAMI ENGINEERS (MIDDLE EAST) 2007 -2010

HAVC, Plumbing & Fire Protection systems

Mechanical Engineer

Interfaced with external and internal stakeholders and vendors and presented the design

Worked on HVAC systems using Carrier`s HAP software, Fire protection system design using NFPA and Plumbing design using Uniform plumbing code.

Reviewed and approved constructional mechanical blue prints and As- built drawings.

Inspected testing, commissioning and air balancing of all mechanical systems.

Review of contractors shop drawings.

Site coordination with other disciplines.

Accomplished lot of projects which involved. Mechanical systems, plumbing systems, fire protection systems and control systems (i.e. Building Management System).

DAR AL RIYADH / OMRANIA & ASSOCIATE (MIDDLE EAST) 2002- 2007

HAVC, Plumbing & Fire Protection systems

Mechanical Engineer

Exercised sound technical judgment and engineering principles such as Fluid mechanics, environmental and Thermodynamic properties in approving initial and in-service installations and design of HVAC, Plumbing & Fire Protection Systems

Evaluated, and verified necessary calculations using HAP software.

Created conceptual HVAC, Plumbing & Fire Protection Systems, specifications and plans using ASHRAE Code, Uniform Plumbing Code & NFPA Code

Provided technical support in implementation and design of plumbing system.

Upgraded the existing system (renovation projects) and improved system functioning & overall efficiency.

Assisted testing, commissioning & Air Balancing of HVAC Systems.

Worked on drawing modifications using AutoCAD.

Successful placing of many high technical mechanical systems, specification monitoring

Quality control and commissioning the various plants as follows: HVAC, Storm Water, Sanitary Drainage, Domestic Water, LPG gas, Diesel fuel systems etc

External irrigation works and BMS system.

Reviewed shop drawings, As-built drawings, coordination drawings.

Technical comparison of materials and equipment.

Maintained quality control as per international standards.

Designed swimming pools, fountains and water features.

Worked on the prestigious Kingdom Trade Center Project Involving multiple mechanical systems and Control systems (Building Management System).

EDUCATION

Bachelor of Science (Mechanical Engineering) 5 years degree course.

Aligarh University. India.

P. Eng - Professional Engineers Ontario in progress. Completed Ethics and Law, Just need 12 months experience under a P-eng.



Contact this candidate