Abelino Leal
Mission, TX. 78572
Cell # 956-***-****
Credentials
Years of Experience 35 years oil and gas exploration 24 with service companies, 11 years oil and gas vertical and horizontal completions. 5 years Completions Consultant 6 years Oxy Employee as Completions Field Superintendent.
• Communicate well with all levels of management, contractors, and team members.
• Utilize total quality and safety management principles to operate successfully in stressful, fast- paced, dead line-oriented, “no errors” environment.
• Outstanding troubleshooting and maintenance skills, Years of Mentoring.
• Physically fit, with high endurance capabilities – drug and alcohol free. CERTIFICATIONS
• Well Control- WO, CT, SN, WL PEC...SMITH SYSTEM...H2S...FIRST AID...Medical Respirator...
Fall protection...Fire prevention...CPR
Work history
• Halliburton Cementer – Supervisor Mission Tx. 1976-1983
• Halliburton Packer/Tool Tech Mission, Tx. 1984-1990
• Halliburton Frac Supervisor –Well Lead Mission, Tx. 1991-1998
• Halliburton/Pemex Completion Foreman Tamalipas Mexico Pemex 1999-2001
• Halliburton Re-completion Supervisor Las Morochas Venenzula 2001-2002
• Halliburton Tree Saver/ QA/QC Trainer for land & off shore Alice, Tx 2003-2004
• Baker Oil Tools completion packers, composite plugs Pharr, Tx. 2005-2009
• Shell Western E&P Inc. Consultant Vertical & Horizontal McCook/Laredo Tx. 2010
• Oxy USA Inc Completion & Re-Completion Consultant McCook Tx. Then moved to West Texas 2011 to 2021
Experience (Variety of Experience)
• Primary and remedial cementing, squeeze cementing, shoe, linear top, and perforations
• Stimulation frac jobs using low and high temp. Gel system, frac with N2, Co2 and acid, frac packs and gravel packs, land and water. Frac in Eagle Ford - Chalk and Wolfcamp, Sprayberry, and Bone Spring. Zipper Frac (6 well pad)
• Coil mill out on vertical and horizontal wells. Coil wash out, squeezing with coil and setting plugs. Fishing jobs – (Lost Wireline)
• Wireline and Slickline all aspects of applications Pump downs- Plug and perf
• Work over rig – setting or retrieving packers. Recompletion Clean out.
• Capillary Artificial lift
• Snubbing unit used on Eagle Ford to snub in tubing. (For Shell E&P Inc.)
• At the start of the Eagle Ford Shale running composite plug and completing wells with production packers.
Key achievements:
• No lost time no accidents by implementing extensive job and safety mentoring that facilitated
contractors and teams ability to effectively identify, isolate, and eliminate work, job procedure hazards.
• Part of a Team on the completion of the Shell 797-09-HN1 a Niobrara Exploration well, in Grand Junction, Colorado. High Profile Job. Needing Experience to compete 30 stage High Pressure formation.